| ID |
Date |
Author |
Status |
Type |
Category |
Location |
Title |
Text |
 |
|
464
|
Mon Feb 2 15:29:45 2026 |
Ronic Chiche | Under Process | info | lasers and optics | ThomX igloo | Laser Amplifier used at 70% | today, I installed a laser dump just before
the telescope to avoid any high power (50W
instead of 17W usually) issue in the injection |
|
|
463
|
Mon Dec 8 11:17:17 2025 |
Ronic Chiche | Under Process | issue | lasers and optics | detectors and electronics | ThomX igloo | High frequency noise | This morning, I installed a high-voltage
probe (1:1000) on the AC-line to see if one
could detect a correlation between lock losses |
|
|
462
|
Wed Dec 3 16:23:40 2025 |
Ronic Chiche | Fixed | report | lasers and optics | detectors and electronics | ThomX igloo | Noise issue | yesterday, in the same conditions, we had
so many locking issues... exactly
in the same way than before. :-( |
|
|
461
|
Mon Dec 1 18:03:29 2025 |
Ronic Chiche | Fixed | report | lasers and optics | detectors and electronics | ThomX igloo | Noise issue | since several days, we see that the locking
is more and more unstable and the lock duration
was sometime less than 20-30 seconds ! |
|
|
460
|
Tue Oct 28 17:31:47 2025 |
Ronic Chiche | Under Process | issue | lasers and optics | detectors and electronics | ThomX igloo | High frequency noise | we did some tests with Marie to make some
vibrations on the door.
below, I exhibit some pictures of |
  |
|
459
|
Tue Oct 28 10:07:48 2025 |
Ronic Chiche | Under Process | issue | lasers and optics | detectors and electronics | ThomX igloo | High frequency noise | After this observation, we did a test with
Daniele to try to correlate the road traffic
in front of the Igloo with the lock losses |
|
|
458
|
Wed Oct 1 10:14:12 2025 |
Ronic Chiche | Under Process | issue | lasers and optics | detectors and electronics | ThomX igloo | High frequency noise | At the end of the day, we found out what
was the origin of this noise : some road
renovation work with jackhammer and road |
|
|
457
|
Tue Sep 30 15:17:30 2025 |
Ronic Chiche | Under Process | issue | lasers and optics | detectors and electronics | ThomX igloo | High frequency noise | Today, the lock of the FPC was particularly
bad (maybe the worst ever seen), with a lot
of high frequency noise. |
|
|
456
|
Mon Sep 29 10:22:32 2025 |
Ronic Chiche | Fixed | info | mechanics | lasers and optics | vacuum | detectors and electronics | cabling | software | utilities | ThomX igloo | Power shut down on September 23th | This morning I did a phase alignment on
the PDH signal generator (Rigol DG4102)
this procedure ensure that both phases |
|
|
455
|
Fri Sep 26 11:13:35 2025 |
Ronic Chiche | Fixed | info | mechanics | lasers and optics | vacuum | detectors and electronics | cabling | software | utilities | ThomX igloo | Power shut down on September 23th | the 33MHz/500MHz RF frequencies from the
Ring seems different from the previous state
(maybe working at an energy of 50MeV instead |
|
|
454
|
Fri Sep 26 11:08:21 2025 |
Ronic Chiche | Fixed | info | mechanics | lasers and optics | vacuum | detectors and electronics | cabling | software | utilities | ThomX igloo | Power shut down on September 23th | this morning, I restarted all the equipments
of the FPC.
everything was fine after being |
|
|
453
|
Thu Sep 18 18:29:04 2025 |
Ronic Chiche | Fixed | info | mechanics | lasers and optics | vacuum | detectors and electronics | cabling | software | utilities | ThomX igloo | Power shut down on September 23th | to anticipate the power shut down on next
tuesday 23/09,
this afternoon, I switched off all |
|
|
452
|
Tue Sep 16 17:41:28 2025 |
Ronic Chiche | Fixed | info | mechanics | lasers and optics | detectors and electronics | ThomX igloo | Accelerometer measurement | with Daniele, we placed the accelerometer
on top of the fiber amplifier box which is
inside the housing. |
|
|
451
|
Tue Sep 16 12:32:52 2025 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | ThomX igloo | polarization measurement of the FP cavity beam | today, with Daniele, we did a simple polarization
measurement in transmission of the FP cavity
beam. |
|
|
450
|
Thu Aug 28 18:01:46 2025 |
Ronic Chiche | Fixed | info | detectors and electronics | ThomX igloo | Power shut down on August 29th | after alignment, CEP adjustment and optimizing
the PDH phase, I got back ~92kW in the FPC
for 33% amplifier ratio. |
|
|
449
|
Wed Aug 27 12:01:41 2025 |
Ronic Chiche | Fixed | info | detectors and electronics | ThomX igloo | Power shut down on August 29th | This morning, all the equipments have been
switched off due to a power shut down
tomorrow morning. |
|
|
448
|
Thu Aug 7 11:14:47 2025 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | ThomX igloo | Alignment correction during the summer break | I restarted the FPC system this morning.
after some classic alignement procedure
(some LEFT steps on the cavity injection |
|
|
447
|
Fri Jul 18 15:56:40 2025 |
Ronic Chiche | Under Process | info | lasers and optics | ThomX igloo | laser operation again with machine OFF | The laser start at 33% with 92 KW optimized
and
P=0.03 |
|
|
446
|
Fri Jul 18 09:23:40 2025 |
Ronic Chiche | Under Process | info | lasers and optics | ThomX igloo | Xrays experiment with prostate | Today we do XRays for experiment.
The laser start to 33% at 93 KW
but Pgain = 0.033 |
|
|
445
|
Wed Jul 16 17:17:57 2025 |
Ronic Chiche | Under Process | info | lasers and optics | ThomX igloo | Suite tests stabilité | We continue to find what gives high freq.
perturbation.
The laser starts at 92 KW it is |
|
|
444
|
Tue Jul 15 17:34:13 2025 |
Ronic Chiche | Under Process | info | lasers and optics | ThomX igloo | Stability test Without and with | The laser starts at 93 KW.
This morning I operated the laser
locked with the RF for 1h30 without any delock. |
|
|
443
|
Fri Jul 11 16:15:12 2025 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | ThomX igloo | Tuning of the slow feeback loop analog BW + fast feedback loop gain + PID | Today with Daniele, we tuned the potentiometer
after the Laselock which drives the analog
BW of the PID on the laser PZT, |
|
|
442
|
Thu Jul 10 18:33:48 2025 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | ThomX igloo | New recipies with additionnal attenuation before the diffuser and new x3 amplifier on laser PZT | With optical attenuation + x3 amplifier
on laser PZT channel + feedback tuning
Temporary recipie |
|
|
441
|
Thu Jul 10 18:02:54 2025 |
Ronic Chiche | Fixed | info | detectors and electronics | ThomX igloo | laser PZT amplifier | this afternoon, I added the Gain = 2.8
amplifier at the output of the Laselock to
drive the laser PZT. |
|
|
440
|
Thu Jul 10 15:44:43 2025 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | ThomX igloo | long run to test the appearance of high frequency noise | today, long run directly at full power
(33% amplifier ratio) => 98kW in the FPC
at the very begining of the run. |
|
|
439
|
Wed Jul 9 18:11:59 2025 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | ThomX igloo | long run to test the appearance of high frequency noise | Today with Daniele, we did 6 long runs
at different power (23kW, 46kW, 66kW, 73kW,
92kW, 92kW) |
|
|
438
|
Wed Jul 9 17:20:01 2025 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | ThomX igloo | New recipies with additionnal attenuation before the diffuser | With optical attenuation
only
For ~ 92kW power in the |
|
|
437
|
Wed Jul 9 16:27:18 2025 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | ThomX igloo | optical attenuator added on the diffuser + new PID parameters | Today we did several long runs (~1h each)
at ~23kW, 46kW, 66kW with different PID parameters
which seems better. |
|
|
436
|
Wed Jul 9 14:12:54 2025 |
Ronic Chiche | Fixed | info | lasers and optics | ThomX igloo | Recipies for different FPC power |
For ~ 66kW power in the
FP-cavity: |
|
|
435
|
Tue Jul 8 18:48:51 2025 |
Ronic Chiche | Under Process | report | mechanics | lasers and optics | detectors and electronics | ThomX igloo | day by day run for X-ray production | long run today at relatively
nominal power (~90kW) with double loop
(FPC + RF) between 13:30am and 6:30pm |
|
|
434
|
Tue Jul 8 18:45:17 2025 |
Ronic Chiche | Under Process | report | mechanics | lasers and optics | detectors and electronics | ThomX igloo | day by day run for X-ray production | long run yesterday at relatively low power
(~23kW) with double loop (FPC + RF) between
10am and 6pm |
|
|
433
|
Tue Jul 1 17:31:41 2025 |
Ronic Chiche | Under Process | report | mechanics | lasers and optics | detectors and electronics | ThomX igloo | day by day run for X-ray production | We had a long run without any lock loss
during ~1h with the 23kW recipie in the morning.
during the afternoon, we had some |
|
|
432
|
Tue Jul 1 12:13:18 2025 |
Ronic Chiche | Fixed | info | lasers and optics | ThomX igloo | Recipies for different FPC power | For ~ 23kW power in the FP-cavity:
Alplhanov amplifier ratio
: 15% |
|
|
431
|
Thu Jun 26 12:37:22 2025 |
Ronic Chiche | Fixed | info | lasers and optics | ThomX igloo | Recipies for different FPC power | For ~ 46kW power in the FP-cavity:
Alplhanov amplifier ratio
: 20% |
|
|
430
|
Wed Jun 25 18:48:28 2025 |
Ronic Chiche | Under Process | report | mechanics | lasers and optics | detectors and electronics | ThomX igloo | day by day run for X-ray production | New locking parameters (I got 98kW for
33% amp ratio) :
Axis 18 position : +0009420 |
|
|
429
|
Wed Jun 25 09:57:56 2025 |
Ronic Chiche | Under Process | issue | mechanics | lasers and optics | vacuum | detectors and electronics | ThomX igloo | Possible causes for the noise in the FP-cavity system | 4.3 - Vibrations of the mirror mounts due
to temperature related to cavity power (the
electrons machine is OFF) |
 |
|
428
|
Wed Jun 25 09:43:36 2025 |
Ronic Chiche | Fixed | info | lasers and optics | ThomX igloo | New power record in ThomX cavity | yesterday, we were able to store more than
98kW in the FP cavity, always with the same
parameter : 33% laser amplifier ratio |
|
|
427
|
Wed Jun 11 18:59:34 2025 |
Ronic Chiche | Under Process | issue | mechanics | lasers and optics | vacuum | detectors and electronics | ThomX igloo | Possible causes for the noise in the FP-cavity system | list of possible causes of the high frequency
noise which makes the system loosing the
lock => to be checked. |
|
|
426
|
Wed Jun 11 11:35:22 2025 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | software | ThomX igloo | 33MHz phase adjustment | the 33MHz beating signal (phase) is used
to start and stop automatically the lock
on the 500MHz beating signal. |
|
|
425
|
Wed May 14 09:50:52 2025 |
Ronic Chiche | Under Process | report | mechanics | lasers and optics | detectors and electronics | ThomX igloo | day by day run for X-ray production | Today, I removed the NKT oscillator from
the bunker to put it in the PLIC room.
I locked the FP cavity and obtained |
|
|
424
|
Tue May 6 10:58:18 2025 |
Ronic Chiche | Under Process | report | lasers and optics | ThomX igloo | air conditionning in ThomX Bunker | I finally got 93-94kW for 33% amp ratio.
I had to move the FP-cavity length
to compensate the temperature change in the |
|
|
423
|
Tue May 6 09:29:43 2025 |
Ronic Chiche | Under Process | report | lasers and optics | ThomX igloo | air conditionning in ThomX Bunker | after the new temperature setting for the
bunker air cooling (winter to summer transition),
the temperature drop from 24° to 20°C |
|
|
422
|
Fri May 2 10:05:43 2025 |
Ronic Chiche | Under Process | report | lasers and optics | ThomX igloo | air conditionning in ThomX Bunker | The temperature slitly increase in thomx
Bunker from 23° to 24° during the
last day. |
|
|
421
|
Tue Apr 29 09:26:08 2025 |
Ronic Chiche | Under Process | report | mechanics | lasers and optics | detectors and electronics | ThomX igloo | day by day run for X-ray production | today, after 1 week of vacation, I was
able to easily lock the cavity with 92kW
with 33% amp ratio without too much optimizations |
|
|
420
|
Mon Mar 31 18:19:30 2025 |
Ronic Chiche | Fixed | info | lasers and optics | ThomX igloo | New power record in ThomX cavity | today, we were able
to store more than 97kW in the FP cavity,
always with the same parameter : 33% laser |
|
|
419
|
Mon Mar 31 17:12:56 2025 |
Ronic Chiche | Under Process | report | mechanics | lasers and optics | detectors and electronics | ThomX igloo | day by day run for X-ray production | today, the alignment of FP cavity was so
bad that I tuned the 01 mode by error (CEP
and alignment)... insead of the 00 |
|
|
418
|
Tue Mar 18 11:45:21 2025 |
Ronic Chiche | Fixed | info | lasers and optics | ThomX igloo | New power record in ThomX cavity | today, we were able to store more than
95kW in the FP cavity, always with the same
parameter : 33% laser amplifier ratio |
|
|
417
|
Tue Mar 18 11:25:07 2025 |
Ronic Chiche | Under Process | report | mechanics | lasers and optics | detectors and electronics | ThomX igloo | day by day run for X-ray production | this morning, the cavity was pretty misaligned
=> basic alignment in y direction helps
a lot => 93kW for 33% amp ratio. |
|
|
416
|
Wed Mar 5 15:08:38 2025 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | ThomX igloo | Electrons-Photons phase stability measurement | the phase between the 500Mhz ring RF oscillator
and the electrons is measured on a BPM and
is very stable after 2-3ms (<< 6ps, |
|
|
415
|
Wed Mar 5 13:17:26 2025 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | ThomX igloo | Electrons-Photons phase stability measurement | we installed a measurement at the IP with
the BPM for ion cleaning for electrons and
we used a fast photodiode at the output of |
|
|
414
|
Tue Mar 4 14:54:31 2025 |
Ronic Chiche | Fixed | info | mechanics | software | ThomX igloo | New direction for cavity motors | from now on, one reverts the FP cavity
motors direction to compensate the long drift
from the begining of the project. |
|
|
413
|
Fri Feb 21 19:52:57 2025 |
Ronic Chiche | Fixed | info | mechanics | lasers and optics | detectors and electronics | software | ThomX igloo | Good Xrays production trend | this afternoon, we succeeded to get a quite
long Xray production trend around 15-20 minutes
with a flux above 25k on i1. |
|
|
412
|
Fri Feb 21 19:40:50 2025 |
Ronic Chiche | Fixed | issue | software | ThomX igloo | strange drift (new effect !?!) | today, we had a strange effect :
both the laser and the FP cavity were
locked on the RF frequency (500.10045 MHz), |
|
|
411
|
Fri Feb 21 10:13:03 2025 |
Ronic Chiche | Under Process | info | mechanics | lasers and optics | detectors and electronics | ThomX igloo | correlations between accelerometer and lock losses @ 20Hz | for this 20Hz oscillation, could it be
a natural resonance of the optical table
placed on its feet ? |
|
|
410
|
Thu Feb 20 12:36:19 2025 |
Ronic Chiche | Fixed | info | lasers and optics | ThomX igloo | New power record in ThomX cavity | today, we were able
to store more than 94kW in the FP cavity,
always with the same parameter : 33% laser |
|
|
409
|
Wed Feb 19 10:35:06 2025 |
Ronic Chiche | Under Process | info | mechanics | lasers and optics | detectors and electronics | ThomX igloo | correlations between accelerometer and lock losses @ 20Hz | I installed the accelerometer on the ground
close to one feet of the FP cavity hexapod
(see picture) and restarted the acquisition |
   |
|
408
|
Wed Feb 19 09:28:12 2025 |
Ronic Chiche | Under Process | info | mechanics | lasers and optics | detectors and electronics | ThomX igloo | correlations between accelerometer and lock losses @ 20Hz | long term pk-pk measurement of the accelerometer
(placed on the optical cavity table, on the
marble part close to the laser oscillator) |
|
|
407
|
Tue Feb 18 19:33:27 2025 |
Ronic Chiche | Under Process | info | mechanics | lasers and optics | detectors and electronics | ThomX igloo | correlations between accelerometer and lock losses @ 20Hz | here is the same kind of measurement (pk-pk
of 1 sec of acquisition) done on the laser
PZT when the FP is at 90kW. |
|
|
406
|
Tue Feb 18 17:36:25 2025 |
Ronic Chiche | Under Process | info | mechanics | lasers and optics | detectors and electronics | ThomX igloo | correlations between accelerometer and lock losses @ 20Hz | here is the acquisition from 10:30am to
5:30pm
11k point in 7h => 1.57k points |
|
|
405
|
Tue Feb 18 10:40:55 2025 |
Ronic Chiche | Under Process | info | mechanics | lasers and optics | detectors and electronics | ThomX igloo | correlations between accelerometer and lock losses @ 20Hz | here is the pk-pk measurement of the accelerometer
during the whole night.
the recording started at 5pm yesterday |
|
|
404
|
Mon Feb 17 17:37:27 2025 |
Ronic Chiche | Under Process | info | mechanics | lasers and optics | detectors and electronics | ThomX igloo | correlations between accelerometer and lock losses @ 20Hz | one possible source for this acoustic noise
was the vibrations coming from the water
cooling of the dipoles which is normally |
|
|
403
|
Mon Feb 17 12:12:02 2025 |
Ronic Chiche | Fixed | info | lasers and optics | ThomX igloo | New power record in ThomX cavity | today, we were able to store more than
93kW in the FP cavity, always with the same
parameter : 33% laser amplifier ratio |
|
|
402
|
Mon Feb 17 10:48:00 2025 |
Ronic Chiche | Under Process | info | mechanics | lasers and optics | detectors and electronics | ThomX igloo | correlations between accelerometer and lock losses @ 20Hz | new plots, with the accelerometer placed
directly on the optical cavity table (on
the marble part), close to the oscillator. |
7x |
|
401
|
Mon Feb 17 09:52:21 2025 |
Ronic Chiche | Under Process | info | mechanics | lasers and optics | detectors and electronics | ThomX igloo | correlations between accelerometer and lock losses @ 20Hz | this morning, I did some new plots with
the accelerometer placed on the top of the
case of the OneFive laser. |
6x |
|
400
|
Fri Feb 14 19:08:09 2025 |
Ronic Chiche | Under Process | info | mechanics | lasers and optics | detectors and electronics | ThomX igloo | correlations between accelerometer and lock losses @ 20Hz | at the end of the day, I moved the accelerometer
from the top of the cavity vessel to the
top case of the Onefive laser. |
|
|
399
|
Fri Feb 14 10:58:48 2025 |
Ronic Chiche | Under Process | info | mechanics | lasers and optics | detectors and electronics | ThomX igloo | correlations between accelerometer and lock losses @ 20Hz | then, I moved the accelerometer on top
of the "X-hutch side" vessel, placed
directly on the metal top case, inside the |
8x |
|
398
|
Fri Feb 14 10:11:00 2025 |
Ronic Chiche | Under Process | info | mechanics | lasers and optics | detectors and electronics | ThomX igloo | correlations between accelerometer and lock losses @ 20Hz | this morning, I did some measurement with
nobody interfering with the tests.
- the "no noise" image |
    |
|
397
|
Tue Feb 11 10:55:21 2025 |
Ronic Chiche | Under Process | info | mechanics | lasers and optics | detectors and electronics | ThomX igloo | correlations between accelerometer and lock losses @ 20Hz | today I connected a copy of the laser PZT
signal to the 2nd scope CH2 (with AC coupling
to remove the DC offset) to be able to monitor |
|
|
396
|
Fri Feb 7 15:35:37 2025 |
Ronic Chiche | Under Process | info | mechanics | lasers and optics | detectors and electronics | ThomX igloo | correlations between accelerometer and lock losses @ 20Hz | I installed an accelerometer setup in the
bunker.
presently, the accelerometer is placed |
 |
|
395
|
Thu Feb 6 10:29:36 2025 |
Ronic Chiche | Under Process | report | mechanics | lasers and optics | detectors and electronics | ThomX igloo | day by day run for X-ray production | this morning, I restarted the lock of the
CFP after almost 2 weeks without operation.
after quick alignment and CEP tuning, |
|
|
394
|
Thu Jan 23 17:55:41 2025 |
Ronic Chiche | Under Process | report | mechanics | lasers and optics | detectors and electronics | ThomX igloo | day by day run for X-ray production | today we did x-rays => we got 41 000
pA at maximum and 90kW in the FPC for 33%
amplifier ratio. |
|
|
393
|
Wed Jan 22 15:32:53 2025 |
Ronic Chiche | Fixed | info | mechanics | lasers and optics | vacuum | ThomX igloo | correlations between vacuum gauges and lock losses @ 20Hz | the machine people saw a correlation between
BPM jumps and vacuum gauges peaks related
to breakdowns in the beam pipe. |
|
|
392
|
Wed Jan 8 16:08:59 2025 |
Ronic Chiche | Under Process | info | lasers and optics | detectors and electronics | cabling | ThomX igloo | CEM noise measurements | This afternoon, we started almost all the
parts of the machine with Vincent and Nicolas,
and we didn't see any change in the Loop |
|
|
391
|
Wed Jan 8 12:24:48 2025 |
Ronic Chiche | Under Process | info | lasers and optics | detectors and electronics | cabling | ThomX igloo | CEM noise measurements | The goal of these measurements is to check
if one can find some correlation between
the CFP lock losses observed during a run |
   |
|
390
|
Tue Jan 7 10:18:08 2025 |
Ronic Chiche | Under Process | report | mechanics | lasers and optics | detectors and electronics | ThomX igloo | day by day run for X-ray production | this morning, I restarted the cavity after
the Christmas shutdown.
everything went fine. |
|
|
389
|
Tue Dec 17 16:28:32 2024 |
Ronic Chiche | Under Process | report | mechanics | lasers and optics | detectors and electronics | ThomX igloo | day by day run for X-ray production | this morning, Kevin reduced the steering
current in the IcePap controllers of the
FP cavity motors. |
|
|
388
|
Thu Dec 12 18:28:02 2024 |
Ronic Chiche | Under Process | report | mechanics | lasers and optics | detectors and electronics | ThomX igloo | day by day run for X-ray production | major result of the day: X-ray vertical
scan by moving the hexapod
abscise : hexapod position |
|
|
387
|
Wed Dec 11 18:51:35 2024 |
Ronic Chiche | Under Process | report | mechanics | lasers and optics | detectors and electronics | ThomX igloo | day by day run for X-ray production | This morning, I added an amplifier on the
33MHz beating signal in between the mixer+LPF
and the scope/Laselock. |
|
|
386
|
Wed Dec 4 17:53:49 2024 |
Ronic Chiche | Under Process | report | mechanics | lasers and optics | detectors and electronics | ThomX igloo | day by day run for X-ray production | last thing we tried :
we removed the threshold on the
FPC/RF error signal. |
|
|
385
|
Wed Dec 4 17:11:50 2024 |
Ronic Chiche | Under Process | report | mechanics | lasers and optics | detectors and electronics | ThomX igloo | day by day run for X-ray production | we observed that :
- the MOT.03 motor always exhibits
some perturbations on the transmitted, reflected |
|
|
384
|
Wed Dec 4 12:26:03 2024 |
Ronic Chiche | Under Process | report | mechanics | lasers and optics | detectors and electronics | ThomX igloo | day by day run for X-ray production | today with Alice, we planned to do a long
run with ~80kW in the FPC to check if the
lock problems are coming from the interaction |
|
|
383
|
Tue Nov 26 18:00:14 2024 |
Ronic Chiche | Under Process | report | mechanics | lasers and optics | detectors and electronics | ThomX igloo | day by day run for X-ray production | at the begining of the day, we started
to get ~81kW in the FPC for 33% amplifier
ratio and after ~1h, we got 84kW after CEP |
|
|
382
|
Fri Nov 22 10:23:33 2024 |
Ronic Chiche | Under Process | report | mechanics | lasers and optics | detectors and electronics | ThomX igloo | day by day run for X-ray production | the RF frequency changed from 500.1003MHz
to 500.0913MHz => it reduced by 9kHz @
500MHz which is equivalent to 600Hz @ 33MHz |
|
|
381
|
Wed Nov 20 18:55:37 2024 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | ThomX igloo | Checking the amplifier power | this afternoon, we put back the 1/4 and
1/2 waveplates and after a long alignment/angle
tuning/CEP optimization process, we hardly |
|
|
380
|
Wed Nov 20 12:42:11 2024 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | ThomX igloo | Checking the amplifier power | I put back and aligned the 1/2 waveplate
only and I get 71kW max after its optimization
and optimizing the CEP and alignment (without |
|
|
379
|
Wed Nov 20 12:00:47 2024 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | ThomX igloo | Checking the amplifier power | we did a long term run (25 mn) with the
powermeter located at the FPC position at
33% amplifier ratio. |
|
|
378
|
Wed Nov 20 11:28:01 2024 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | ThomX igloo | Checking the amplifier power | this morning, with Daniele, we checked
the amplifier power, right after the CVBG
(the power meter has to be placed on a metal |
|
|
377
|
Tue Nov 19 17:37:55 2024 |
Ronic Chiche | Under Process | info | lasers and optics | software | ThomX igloo | Optimizing lock parameters for stable X-ray production | the RF frequency is now 500.1003MHz which
is equivalent (if divided by 15) to 33.34002MHz.
the frequency has to be changed |
|
|
376
|
Fri Nov 8 15:23:11 2024 |
Ronic Chiche | Under Process | info | lasers and optics | software | ThomX igloo | Optimizing lock parameters for stable X-ray production | this morning, I did some walking procedure
and CEP alignment to get ~80kW in the FPC
with 33% amplifier ratio. |
|
|
375
|
Wed Oct 23 12:23:10 2024 |
Ronic Chiche | Under Process | info | lasers and optics | software | ThomX igloo | Optimizing lock parameters for stable X-ray production | this morning, I did some walking procedure
and I got 82kW in the FPC with 33% amplifier
ratio (after CEP optimization too). |
|
|
374
|
Tue Oct 22 18:58:56 2024 |
Ronic Chiche | Under Process | info | lasers and optics | software | ThomX igloo | Optimizing lock parameters for stable X-ray production | Today, after setting the locking parameters,
I got 80kW in the FPC for 33% amplifier ratio
after CEP tuning (Smaract CH2 ~ -423.5µm) |
|
|
373
|
Tue Oct 22 18:52:40 2024 |
Ronic Chiche | Fixed | issue | lasers and optics | ThomX igloo | Onefive 33MHz modelock loss | For the modulation/demodulation generator
for the PDH signal,
after a power shutdown, on can : |
|
|
372
|
Mon Oct 21 09:20:47 2024 |
Ronic Chiche | Fixed | issue | lasers and optics | ThomX igloo | Onefive 33MHz modelock loss | After the new Yvette flooding of the last
week and the consecutive AC-shut down, I
restarted this morning the laser with the |
|
|
371
|
Tue Oct 15 09:33:15 2024 |
Ronic Chiche | Fixed | issue | lasers and optics | ThomX igloo | Onefive 33MHz modelock loss | This morning, I verified the reason why
the seeder frequency was not displayed on
the amplifier software screen: |
|
|
370
|
Mon Oct 14 10:21:17 2024 |
Ronic Chiche | Fixed | issue | lasers and optics | ThomX igloo | Onefive 33MHz modelock loss | On Friday 11th of October, due to the Yvette
flooding, all the AC power of ThomX have
been shut down. |
|
|
369
|
Wed Oct 9 18:39:34 2024 |
Ronic Chiche | Under Process | info | lasers and optics | software | ThomX igloo | Optimizing lock parameters for stable X-ray production | This afternoon, we scanned the optical
table vertically with the hexapod in asynchronous
mode to find its optimum position, looking |
|
|
368
|
Wed Oct 9 09:56:21 2024 |
Ronic Chiche | Under Process | info | lasers and optics | software | ThomX igloo | Optimizing lock parameters for stable X-ray production | This morning, I wanted to test quickly
if the Smaract motors can be used in open
loop instead of closed loop or in piezo scan. |
|
|
367
|
Tue Oct 8 11:59:27 2024 |
Fatematuj Johora | Under Process | report | lasers and optics | Optical room | Characterizing Focus Tunable Lens | Yesterday Ronic and I worked on the high
laser power measurements with the Vertical
set-up of the Focus Tunable Lens. We went |
|
|
366
|
Thu Oct 3 16:38:03 2024 |
Ronic Chiche | Under Process | info | lasers and optics | software | ThomX igloo | Optimizing lock parameters for stable X-ray production | Today with Daniele and Alice, we operated
to cavity.
we obtained 84kW for 33% of amplifier |
|
|
365
|
Tue Sep 17 13:04:32 2024 |
Ronic Chiche | Under Process | info | lasers and optics | software | ThomX igloo | Optimizing lock parameters for stable X-ray production | here are the (good) lock parameters used
this morning.
for the RF/FPC lock, the 33MHz |
|
|
364
|
Tue Sep 17 12:48:13 2024 |
Ronic Chiche | Fixed | info | mechanics | ThomX igloo | Finding correct motors position and parameters to keep the lock during a move | this morning with Daniele, we did a quite
long run with this motor position and it
seems we don't lose the lock too much. |
|
|
363
|
Mon Sep 16 12:03:30 2024 |
Ronic Chiche | Fixed | info | mechanics | ThomX igloo | Finding correct motors position and parameters to keep the lock during a move | this morning, I try
to find a new region for MOT.03 and MOT.06
where we can move them without unlocking |
|
|
362
|
Mon Sep 9 11:00:43 2024 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | software | ThomX igloo | restarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issue | this morning, with Vincent :
- we added the 10Hz trigger to
the CH2 on the remote scope (192.168.229.21) |
|
|
361
|
Fri Sep 6 17:27:20 2024 |
Ronic Chiche | Under Process | issue | mechanics | lasers and optics | detectors and electronics | ThomX igloo | 20Hz oscillation in the locking between Laser and FP-cavity | could it be possible this 20Hz oscillations
comes from anouncements in the bunker, puting
the housing+table in vibration ? |
|
|
360
|
Fri Sep 6 17:21:51 2024 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | software | ThomX igloo | restarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issue | I changed a little bit the locking parameters
(see picture) for the RF/FPC loop and it
locked rapidely. |
|
|
359
|
Fri Sep 6 15:20:20 2024 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | software | ThomX igloo | restarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issue | now, the Ring RF frequency is set to 500.067MHz.
so the CFP/laser frequency should
be 500.067MHz/15 = 33.3378MHz. |
|
|
358
|
Fri Sep 6 12:10:51 2024 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | software | ThomX igloo | restarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issue | after redoing the alignment of the CVBG,
we got back the initial power in the FPC
(87kW) |
|
|
357
|
Fri Sep 6 11:56:53 2024 |
Ronic Chiche | Fixed | issue | lasers and optics | detectors and electronics | ThomX igloo | fixing CVBG issue | this morning with Daniele, we realigned
the amplifier beam axis on the iris position.
it was pretty fast an easy => we |
|
|
356
|
Thu Sep 5 09:53:10 2024 |
Ronic Chiche | Fixed | issue | lasers and optics | detectors and electronics | ThomX igloo | fixing CVBG issue | 1) this morning, I aligned to CFP to get
back 82kW in the cavity for 33% of amplifier
ratio. |
12x |
|
355
|
Thu Sep 5 09:51:22 2024 |
Ronic Chiche | Fixed | issue | lasers and optics | detectors and electronics | ThomX igloo | fixing CVBG issue | the CVBG of the compressor module seems
to have an issue.
here is the plan of the work : |
|
|
354
|
Fri Aug 30 17:59:01 2024 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | software | ThomX igloo | restarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issue | amplifier power measurement before the
compressor CVBG.
we used a mirror in between the amplifier |
|
|
353
|
Fri Aug 30 12:05:38 2024 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | software | ThomX igloo | restarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issue | After the summer power shutdown, I restarted
all the equipements and got quickly ~80kW
for 33% amplifier ratio with CEP optimization |
|
|
352
|
Fri Aug 30 10:50:45 2024 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | software | ThomX igloo | restarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issue | this morning with Daniele, we are measuring
the amplifier power just before the FP-cavity.
Casemate temperature @19.5°C |
|
|
351
|
Tue Aug 27 12:31:19 2024 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | software | ThomX igloo | restarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issue | after doing some alignment (walking procedure
on the Y axis), and CEP optimization, I got
83kW for 33% on the laser amplifier with |
|
|
350
|
Tue Aug 27 11:33:24 2024 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | software | ThomX igloo | restarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issue | we had to move the laser cavity motor to
find the resonances and change a lot the
CEP. |
|
|
349
|
Tue Aug 27 10:19:08 2024 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | software | ThomX igloo | restarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issue | I refilled the chiller and the stabilized
temperature is @ 25°C
we started the 3rd stage of the |
|
|
348
|
Tue Aug 27 09:59:18 2024 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | software | ThomX igloo | restarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issue | temperature in the casemate ~ 19.5°C
stable
this morning, I measured the power |
 |
|
347
|
Tue Jul 23 09:37:24 2024 |
Ronic Chiche | Fixed | issue | lasers and optics | ThomX igloo | Alphanov amplifier issue | picture of the connectors used to carry
signals between the amplifier pump module
and the rack under the table. |
 |
|
346
|
Mon Jul 22 09:54:24 2024 |
Ronic Chiche | Fixed | issue | lasers and optics | ThomX igloo | Alphanov amplifier issue | Guillaume and Julien Bour from Alphanov
will come on wednesday 24/07 to have a first
look and check the amplifier. |
|
|
345
|
Wed Jun 19 09:14:14 2024 |
Ronic Chiche | Fixed | issue | lasers and optics | ThomX igloo | Alphanov amplifier issue | the present situation is :
Guillaume asked me to disconnect
the "Laser head" cable from the |
|
|
344
|
Wed Jun 19 09:07:56 2024 |
Ronic Chiche | Fixed | info | software | ThomX igloo | New password for login on the ThomX computer | the previous password has expired.
the new access from the computer
: |
|
|
343
|
Thu Jun 6 09:17:02 2024 |
Ronic Chiche | Fixed | issue | lasers and optics | ThomX igloo | Alphanov amplifier issue | FYI : to access special menus on the Alphanov
software,
login : "Administrator" |
|
|
342
|
Fri May 31 18:12:59 2024 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | ThomX igloo | FP-cavity lock survey during the Linac section changing operation | today with Daniele, we disconnected the
EOM to increase the injected power of the
amplifier, we were at 4.8mW but we still |
|
|
341
|
Tue May 28 15:05:46 2024 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | ThomX igloo | FP-cavity lock survey during the Linac section changing operation | today, I tried to restart the amplifier
at 0% (without 3rd stage) but it didn't
start... still the same error message. |
|
|
340
|
Tue May 14 10:37:41 2024 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | ThomX igloo | FP-cavity lock survey during the Linac section changing operation | the air temperature is between 21°C
and 22°C.
I tried to lock the cavity but |
|
|
339
|
Tue May 14 09:20:27 2024 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | ThomX igloo | FP-cavity lock survey during the Linac section changing operation | Yesterday, the ThomX water circuit should
have been repared,
and yesterday aftenoon, Daniele restarted |
|
|
338
|
Thu Apr 25 09:09:49 2024 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | ThomX igloo | FP-cavity lock survey during the Linac section changing operation |
this morning, the chiller was in
error and I had to restart it. |
|
|
337
|
Thu Apr 11 09:58:10 2024 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | ThomX igloo | FP-cavity lock survey during the Linac section changing operation | this morning, the computer was restarted
and I had to launch all the applications.
no problem except the powermeter for |
|
|
336
|
Tue Apr 9 09:38:18 2024 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | ThomX igloo | FP-cavity lock survey during the Linac section changing operation | this morning, I had to restart the chiller.
Temp Amp 1 is at 27.5°C after having
started the amplifier at 33% ratio. |
|
|
335
|
Tue Apr 2 09:19:31 2024 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | ThomX igloo | FP-cavity lock survey during the Linac section changing operation | from now on, the transmission factor for
calculating the FP intra cavity power is
1/1.75ppm ~ 570 000 (changed in the Powermeter |
|
|
334
|
Tue Apr 2 08:51:21 2024 |
Ronic Chiche | Fixed | info | lasers and optics | ThomX igloo | New multiplication factor for the Fabry-Perot intra-cavity power | last week, we measured the transmission
of a plan mirror from the same batch than
the ThomX mirrors and we got ~ 1.75ppm instead |
|
|
333
|
Tue Mar 26 10:20:54 2024 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | ThomX igloo | FP-cavity lock survey during the Linac section changing operation | This morning, I locked again the FP-cavity
at more than 50kW with 33% of laser amplifier
ratio. |
|
|
332
|
Tue Mar 19 13:01:22 2024 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | ThomX igloo | FP-cavity lock survey during the Linac section changing operation | This morning with Daniele, we operated
the FP-cavity to be sure there is no issue
due to the Linac section changing operation |
|
|
331
|
Tue Mar 5 11:20:43 2024 |
Ronic Chiche | Fixed | info | software | ThomX igloo | correct parameters for locking the FP-cavity | this morning, I finished the FP-cavity
alignment with the new ring RF frequency.
I get back 50kW @ 33% amplifier ratio. |
|
|
330
|
Mon Mar 4 18:32:21 2024 |
Ronic Chiche | Fixed | info | mechanics | lasers and optics | ThomX igloo | Laser and FP cavities frequency adjustment | This afternoon, I did the 2nd half of the
travel: dF @ 33MHz = 0Hz
=> the Smaract motor position is |
|
|
329
|
Mon Mar 4 12:39:56 2024 |
Ronic Chiche | Fixed | info | mechanics | lasers and optics | ThomX igloo | Laser and FP cavities frequency adjustment | at the beginning of the procedure, the
frequency gap between the new Ring 33MHz
frequency (33.3378MHz) and the laser/FP cavities |
|
|
328
|
Mon Mar 4 09:32:06 2024 |
Ronic Chiche | Fixed | info | software | ThomX igloo | correct parameters for locking the FP-cavity | this morning I solved the problem of the
33MHz frequency beating which should be ~12kHz
between the generator (at the new frequency |
|
|
327
|
Fri Mar 1 18:38:17 2024 |
Ronic Chiche | Fixed | info | software | ThomX igloo | correct parameters for locking the FP-cavity | Today, we restarted the FP-cavity locking,
after 3 weeks without using it.
those 3 weeks have been used to set |
|
|
326
|
Fri Feb 9 18:00:05 2024 |
Ronic Chiche | Under Process | issue | mechanics | lasers and optics | detectors and electronics | ThomX igloo | 20Hz oscillation in the locking between Laser and FP-cavity | measure to be done next week to check the
20Hz noise on the laser amplifier signal:
- install a DET10 in reflection |
|
|
325
|
Fri Feb 9 15:49:39 2024 |
Ronic Chiche | Under Process | issue | mechanics | lasers and optics | detectors and electronics | ThomX igloo | 20Hz oscillation in the locking between Laser and FP-cavity | what does this 10ps phase jitter mean in
term of cavity length variations ?
L = L0 + dL sin(2pi fm t) = L0 |
|
|
324
|
Fri Feb 9 09:50:45 2024 |
Ronic Chiche | Under Process | issue | mechanics | lasers and optics | detectors and electronics | ThomX igloo | 20Hz oscillation in the locking between Laser and FP-cavity | yesterday I did 2 tests to try to understand
the origin of the 20Hz oscillation which
is dominant in the remaining 10-20ps rms |
 |
|
323
|
Wed Feb 7 18:33:42 2024 |
Ronic Chiche | Fixed | info | detectors and electronics | Optical room | lock oscillateur 33MHz - synthé 500MHz | This morning with Daniele, we changed the
laser/RF locking scheme :
1) we use the laser 33MHz internal |
|
|
322
|
Fri Feb 2 11:53:40 2024 |
Ronic Chiche | Fixed | info | mechanics | lasers and optics | ThomX igloo | Laser cavity temperature/pressure sensitivity | this morning, I did a 500MHz beating frequency
(Laser vs RF) drift test with the Smaract
motors configured with "Sensor Mode" |
|
|
321
|
Thu Feb 1 17:23:23 2024 |
Ronic Chiche | Fixed | info | detectors and electronics | ThomX igloo | locking | during the last days we changed the FP-cavity
- RF reference locking system to force the
right bucket: |
 |
|
320
|
Fri Jan 26 13:04:56 2024 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | ThomX igloo | 33MHz (FP-cavity vs RF) phase stability | today, I locked the laser on the
FP-cavity and the FP-cavity on the RF reference
with 47kW inside the FP-cavity. |
|
|
319
|
Fri Jan 26 11:05:27 2024 |
Ronic Chiche | Fixed | info | mechanics | lasers and optics | cabling | ThomX igloo | controller M1 & M4 (plan mirrors) with IcePap controllers | at the begining of each session, it will
be mandatory to avoid any backlash for the
motors : |
|
|
318
|
Thu Jan 25 13:36:35 2024 |
Ronic Chiche | Fixed | info | detectors and electronics | ThomX igloo | First stable X-rays production | this morning, we locked the laser on the
FP-cavity with about 48-49kW stable in the
FP-cavity (for 32% of amplifier ratio). |
|
|
317
|
Thu Jan 25 12:45:41 2024 |
Ronic Chiche | Fixed | info | mechanics | lasers and optics | cabling | ThomX igloo | controller M1 & M4 (plan mirrors) with IcePap controllers | this double motors scheme works good.
if motor P4 is used by increasing
value, the FP-cavityPZT signal (pink signal |
|
|
316
|
Thu Jan 25 10:15:28 2024 |
Ronic Chiche | Fixed | info | mechanics | lasers and optics | cabling | ThomX igloo | controller M1 & M4 (plan mirrors) with IcePap controllers | previously, we have connected motor M4
with an IcePap controller.
see this post : https://elog.lal.in2p3.fr/FPC/THOMX+commissioning/278 |
|
|
315
|
Fri Jan 19 18:05:42 2024 |
Ronic Chiche | Fixed | info | detectors and electronics | ThomX igloo | Adding one photodiode in reflection | this morning, I added a DET36 photodiode
in reflection (I used a thin beam splitter)
to better measure the coupling over the full |
|
|
314
|
Tue Jan 16 12:26:12 2024 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | ThomX igloo | 33MHz (FP-cavity vs RF) phase stability | this morning, with Vincent Chaumat, we
made a beating (phase detection) between
the laser 33MHz and the 33MHz coming from |
|
|
313
|
Tue Jan 16 12:19:35 2024 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | software | ThomX igloo | Restarting equipements after Christmas shutdown | on last friday (12/01/2024), the IcePap
DS issue was solved and I was able to control
the FP-cavity motors properly. |
|
|
312
|
Thu Jan 11 13:42:16 2024 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | software | ThomX igloo | Restarting equipements after Christmas shutdown | this morning, I set the Ring frequency
at 500.25MHz and after switching ON the power
supply of the amplifiers for the RF signal |
|
|
311
|
Wed Jan 10 18:43:03 2024 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | software | ThomX igloo | Restarting equipements after Christmas shutdown | the laser coupled into the amplifier is
still measured at ~3mW at the input, on the
Alphanov software, once the Amp stage are |
|
|
310
|
Wed Jan 10 15:21:46 2024 |
Ronic Chiche | Under Process | info | lasers and optics | ThomX igloo | Variable focal lens validation | we plan to use Electrically Tunable Lenses
EL-10-30-C NIR to build the ThomX telescope
but they need to be compatible with the powerful |
 |
|
309
|
Wed Jan 10 14:52:22 2024 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | software | ThomX igloo | Restarting equipements after Christmas shutdown | this morning, I plugged back the 4 power
cables which supply all the equipments.
all the equipments have restarted |
|
|
308
|
Fri Dec 22 16:13:27 2023 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | software | ThomX igloo | Christmas shutdown | this afternoon, I checked visually what
happens when the AC power of the UPS is broken
down => the laser controller has still |
|
|
307
|
Fri Dec 22 09:46:18 2023 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | software | ThomX igloo | Christmas shutdown | this morning, I shut off all the equipements
(especially the computer) except the ones
powered by the UPS : laser controller, laser |
|
|
306
|
Mon Dec 11 17:21:32 2023 |
Ronic Chiche | Fixed | issue | mechanics | lasers and optics | detectors and electronics | ThomX igloo | Temperature control of the FP-cavity length | today with Fatematuj, we did a long-term
frequency drift measurement between the FP-cavity
loaded with 50kW and the RF reference frequency... |
|
|
305
|
Fri Dec 8 12:21:25 2023 |
Ronic Chiche | Fixed | info | lasers and optics | ThomX igloo | Strecher and fiber injection alignment | today, the Alphanov amplifier stopped because
of the too low injected power : ~2.5mW (measured
by the Alphanov software) |
|
|
304
|
Thu Dec 7 14:59:02 2023 |
Ronic Chiche | Fixed | issue | mechanics | lasers and optics | detectors and electronics | ThomX igloo | Temperature control of the FP-cavity length | on last tuesday, I did a long-term measurement
of the frequency drift when the heating cable
is powered ON at 20V (2x 10V) @ t=0mn. |
|
|
303
|
Thu Dec 7 09:09:27 2023 |
Ronic Chiche | Fixed | info | lasers and optics | ThomX igloo | New mirrors batch informations | the 2 files describe the specfications
for the16 mirrors ordered (4 for ThomX
+ spare, 4 for SBOX + spare) and the measurements |
 |
|
302
|
Mon Dec 4 10:45:50 2023 |
Ronic Chiche | Fixed | issue | mechanics | lasers and optics | detectors and electronics | ThomX igloo | Temperature control of the FP-cavity length | last friday, I locked the cavity and then,
switched ON the heating cable after waiting
the cavity reaches a steady state in frequency |
|
|
301
|
Thu Nov 30 15:53:10 2023 |
Ronic Chiche | Fixed | issue | mechanics | lasers and optics | detectors and electronics | ThomX igloo | Temperature control of the FP-cavity length | this afternoon, I started the heating cable after
the warm-up of the FP-cavity :
14h20 : start to fill 50kW |
|
|
300
|
Thu Nov 30 12:33:08 2023 |
Ronic Chiche | Fixed | info | lasers and optics | ThomX igloo | FP-cavity inside power sensitivity | this morning I monitored the frequency
shift between the FP-cavity frequency (the
laser is locked on it) and the RF reference |
 |
|
299
|
Wed Nov 29 16:39:16 2023 |
Ronic Chiche | Fixed | info | mechanics | lasers and optics | detectors and electronics | ThomX igloo | Long term lock of Laser-FP cavity-RF reference | this afternoon, we did a new long-term
"double lock" run w/o any single
lock loss during 1/2h. |
 |
|
298
|
Wed Nov 29 12:33:33 2023 |
Ronic Chiche | Fixed | info | mechanics | lasers and optics | detectors and electronics | ThomX igloo | Long term lock of Laser-FP cavity-RF reference | today, I did a 20 minutes "double
lock" run w/o any single lock loss.
the attached file shows the recorded |
|
|
297
|
Wed Nov 29 12:20:18 2023 |
Ronic Chiche | Fixed | issue | mechanics | lasers and optics | detectors and electronics | ThomX igloo | Temperature control of the FP-cavity length | today, I removed one of the DC voltage
supply (as with 30V, we are already able
to 30°C on the heating cable). |
|
|
296
|
Wed Nov 29 09:35:10 2023 |
Ronic Chiche | Fixed | info | mechanics | lasers and optics | ThomX igloo | Laser cavity temperature/pressure sensitivity | long-term correlation, over 5-6 days, between
the temperature measured in the bunker, outside
of the housing (blue curve) and the temperature |
|
|
295
|
Tue Nov 28 19:01:19 2023 |
Ronic Chiche | Fixed | info | mechanics | lasers and optics | detectors and electronics | ThomX igloo | Long term lock of Laser-FP cavity-RF reference | today for the first time, we were able
to make a long term lock of all the elements
(Laser on FP cavity and FP-cavity on RF reference) |
|
|
294
|
Tue Nov 28 18:38:16 2023 |
Ronic Chiche | Fixed | issue | mechanics | lasers and optics | detectors and electronics | ThomX igloo | Temperature control of the FP-cavity length | several days ago, we installed a heating
cable around the output flange (close to
the X-hutch) of the FP-cavity vessel. |
|
|
293
|
Tue Nov 28 11:32:17 2023 |
Ronic Chiche | Fixed | info | mechanics | detectors and electronics | ThomX igloo | Smaract motors parameters and controller | current Smaract motors parameters :
- Closed loop Max frequency : 5000
- Signal Amplitude threshold : 2047 |
|
|
292
|
Tue Nov 28 10:24:47 2023 |
Ronic Chiche | Fixed | info | mechanics | lasers and optics | ThomX igloo | Laser cavity temperature/pressure sensitivity | today, I swapped the 500MHz RF reference
oscillator for a Siglent 500MHz DDS oscillator.
see the attached plot : the |
|
|
291
|
Fri Nov 24 18:47:25 2023 |
Ronic Chiche | Fixed | info | mechanics | lasers and optics | ThomX igloo | Laser cavity temperature/pressure sensitivity | the last thing we did with Daniele, is
to start/stop the airflow on top of the housing
(closed) to see a possible pressure effect |
  |
|
290
|
Fri Nov 24 18:16:37 2023 |
Ronic Chiche | Fixed | info | mechanics | lasers and optics | ThomX igloo | Laser cavity temperature/pressure sensitivity | Now, I placed a temperature probe stuck on
the laser housing itself.
fig. 1 |
  |
|
289
|
Fri Nov 24 12:56:39 2023 |
Ronic Chiche | Fixed | info | mechanics | lasers and optics | ThomX igloo | Laser cavity temperature/pressure sensitivity | laser cavity :
when one decreases the laser motor
position, the laser repetition rate |
 |
|
288
|
Thu Nov 23 12:26:26 2023 |
Ronic Chiche | Fixed | issue | lasers and optics | ThomX igloo | Temperature control of the Laser length with the inside Peltier |
bunker temperature @ 22.5°C
today, Sebastien Pitrel improved |
|
|
287
|
Thu Nov 23 12:25:07 2023 |
Ronic Chiche | Fixed | issue | mechanics | lasers and optics | detectors and electronics | ThomX igloo | Temperature control of the FP-cavity length | as the CFP motors displacements induce
a cavity unlock, we try to change the cavity
length by changing the temperature of elment |
|
|
285
|
Fri Nov 17 11:44:35 2023 |
Ronic Chiche | Fixed | info | mechanics | lasers and optics | detectors and electronics | ThomX igloo | Laser / FP-cavity "day by day" locking | temperature @ 21.9°C
48.5kW inside CFP for 30% amplifier
ratio |
|
|
284
|
Thu Nov 16 17:48:29 2023 |
Ronic Chiche | Fixed | info | mechanics | lasers and optics | detectors and electronics | ThomX igloo | Laser / FP-cavity "day by day" locking | temperature @ 22.3°C
today, all the PC applications
were closed except the web browser. |
|
|
283
|
Wed Nov 15 09:36:35 2023 |
Ronic Chiche | Fixed | report | detectors and electronics | ThomX igloo | bunker temperature curve | |
|
|
282
|
Tue Nov 14 11:33:45 2023 |
Ronic Chiche | Fixed | report | mechanics | lasers and optics | ThomX igloo | M4 motor using icepap controller and jive/Atkpanel IHM | one problem is the FP-cavity/laser lock
loss when one moves a FP-cavity motor.
with acceleration = 0.01 units/s² |
|
|
281
|
Tue Nov 14 10:51:57 2023 |
Ronic Chiche | Fixed | info | mechanics | lasers and optics | detectors and electronics | ThomX igloo | Ring frequency / Laser "day by day" locking | temperature stable around 21.7°C
today, the equivalent Smaract position
corresponding to the 500.25MHz ring frequency |
|
|
280
|
Tue Nov 14 10:35:16 2023 |
Ronic Chiche | Fixed | info | mechanics | lasers and optics | detectors and electronics | ThomX igloo | Laser / FP-cavity "day by day" locking | temperature since we moved to temperature
probe (jump at the beginning of the plot)
below the ring on a metallic base. |
|
|
279
|
Fri Nov 10 12:37:42 2023 |
Ronic Chiche | Fixed | info | mechanics | lasers and optics | detectors and electronics | ThomX igloo | Laser / FP-cavity "day by day" locking | as the temperature is back to a normal
value ~ 20.8°C, the injected power to
the amplifier (PD_IN in the Alphanov software) |
|
|
278
|
Fri Nov 10 09:51:22 2023 |
Ronic Chiche | Fixed | report | mechanics | lasers and optics | ThomX igloo | M4 motor using icepap controller and jive/Atkpanel IHM | Kevin moved the M4 mirror controller from
the ISP controller to some ICEPAP controller.
the IHM to access this ICEPAP controller |
|
|
277
|
Fri Nov 10 09:43:26 2023 |
Ronic Chiche | Fixed | info | mechanics | lasers and optics | detectors and electronics | ThomX igloo | Ring frequency / Laser "day by day" locking | temperature stable around 20.8°C
today, the equivalent Smaract position
corresponding to the 500.25MHz ring frequency |
 |
|
276
|
Thu Nov 9 17:02:26 2023 |
Ronic Chiche | Fixed | info | mechanics | lasers and optics | detectors and electronics | ThomX igloo | Laser / FP-cavity "day by day" locking | today, we locked the FP cavity at ~50kW
with 30% laser amplifier ratio (16W) during
almost all the day (from 10am to 4pm) |
|
|
275
|
Thu Nov 9 16:40:16 2023 |
Ronic Chiche | Fixed | info | mechanics | lasers and optics | detectors and electronics | ThomX igloo | Ring frequency / Laser "day by day" locking | today, the equivalent Smaract position
corresponding to the 500.25MHz ring frequency
is +156µm on MCS-1/ch0 (closed loop |
|
|
274
|
Wed Nov 8 18:52:44 2023 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | ThomX igloo | some changes in the feedback scheme | from several weeks, the maximum power stored
in the FP-cavity was ~ 5kW.
today with Daniele, we finished |
 |
|
273
|
Wed Nov 8 17:51:30 2023 |
Ronic Chiche | Fixed | issue | mechanics | lasers and optics | ThomX igloo | !!! strange amplifier beam pointing fluctuations !!! | we confirmed the effect of the bunker temperature
on the laser amplifier "beam pointing"
fluctuations. |
|
|
272
|
Tue Nov 7 14:09:25 2023 |
Ronic Chiche | Fixed | info | lasers and optics | ThomX igloo | Strecher and fiber injection alignment | Today, the power measured at the input
of the amplifier (PD_IN on the LAL amplifier
software) is 2.5mW instead of >3mW generally |
|
|
271
|
Mon Oct 9 13:11:23 2023 |
Daniele Nutarelli | Fixed | info | lasers and optics | ThomX igloo | Tests of pointing stability of the laser CFP | Last monday with Victor we have cheked
the stability of de pointing of the laser
FP. |
 |
|
270
|
Fri Sep 22 11:30:28 2023 |
Daniele Nutarelli | Fixed | report | lasers and optics | Optical room | Laser FP operation | This morning FP Laser was operating well
locked at 30 KWatts in stable vay.
There are some fluctuations due |
|
|
269
|
Thu Sep 21 18:56:56 2023 |
Ronic Chiche | Fixed | issue | mechanics | lasers and optics | ThomX igloo | !!! strange amplifier beam pointing fluctuations !!! | this morning, I locked the cavity to ~25kW
without any problem.
but this afternoon, the reflected |
|
|
268
|
Wed Sep 20 19:17:44 2023 |
Ronic Chiche | Fixed | info | detectors and electronics | Optical room | lock oscillateur 33MHz - synthé 500MHz | after a sudden FP-cavity Finesse increase,
we had to install the Fast Feedback Loop
in order to continue to lock the cavity. |
|
|
267
|
Wed Sep 20 19:12:16 2023 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | ThomX igloo | Fast feedback loop between laser and FP cavity | I copy the post about Fast Feedback loop
: https://elog.lal.in2p3.fr/FPC/THOMX+commissioning/265
This morning, |
|
|
266
|
Wed Sep 20 19:10:16 2023 |
Ronic Chiche | Fixed | issue | mechanics | lasers and optics | detectors and electronics | ThomX igloo | !!! strange FP cavity behavior => impossible to lock !!! | this afternoon, in adjusting the CEP and
improving the parameters of the lock, I was
able to get ~ 47kW stable inside the cavity, |
|
|
265
|
Wed Sep 20 14:16:09 2023 |
Ronic Chiche | Fixed | issue | mechanics | lasers and optics | detectors and electronics | ThomX igloo | !!! strange FP cavity behavior => impossible to lock !!! | This morning,
- I installed the fast feedback
loop. |
 |
|
264
|
Mon Sep 18 17:12:07 2023 |
Ronic Chiche | Fixed | issue | mechanics | lasers and optics | detectors and electronics | ThomX igloo | !!! strange FP cavity behavior => impossible to lock !!! | it could be also an optical unstability,
as when the intra-cavity power increases,
the radius of curvatures of the mirrors increases |
|
|
263
|
Mon Sep 18 12:48:39 2023 |
Ronic Chiche | Fixed | issue | mechanics | lasers and optics | detectors and electronics | ThomX igloo | !!! strange FP cavity behavior => impossible to lock !!! | this morning, we tried:
- to move a bit the arm of the
L-shape off the beam axis (in case of it |
|
|
262
|
Fri Sep 15 19:13:44 2023 |
Ronic Chiche | Fixed | info | lasers and optics | ThomX igloo | drift calculation for the SMA100A | the goal is to estimate what could be the
frequency drift at 500MHz for the SMA100A:
see phase noise datasheet in attachement |
 |
|
261
|
Fri Sep 15 18:56:36 2023 |
Ronic Chiche | Fixed | issue | mechanics | lasers and optics | detectors and electronics | ThomX igloo | !!! strange FP cavity behavior => impossible to lock !!! | suddenly, BEFORE switching the HV amplifier
ON and BEFORE connecting it to the EOM (in
order to explore the HV effect on the EOM |
|
|
260
|
Fri Sep 15 18:27:24 2023 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | ThomX igloo | Fast feedback loop between laser and FP cavity | this afternoon, we tried to better understand
how to drive properly the EOM to kill high
frequency noise. |
|
|
259
|
Fri Sep 15 18:11:07 2023 |
Ronic Chiche | Under Process | issue | mechanics | lasers and optics | detectors and electronics | ThomX igloo | 20Hz oscillation in the locking between Laser and FP-cavity | this afternoon, we did 2 tests to better
understand this 20Hz oscillation:
- we locked the amplified laser |
|
|
258
|
Fri Sep 15 18:00:41 2023 |
Ronic Chiche | Under Process | issue | mechanics | lasers and optics | detectors and electronics | ThomX igloo | 20Hz oscillation in the locking between Laser and FP-cavity | this morning, we tried to find the origin
of the 20Hz oscillation.
- we switched OFF the laser Smaract |
|
|
257
|
Thu Sep 14 19:16:44 2023 |
Ronic Chiche | Fixed | info | detectors and electronics | Optical room | lock oscillateur 33MHz - synthé 500MHz | this afternoon, we were able to lock the
laser on the FP-cavity and the FP-cavity
on the Ring reference oscillator in a same |
|
|
256
|
Wed Sep 13 18:33:50 2023 |
Ronic Chiche | Fixed | info | detectors and electronics | Optical room | lock oscillateur 33MHz - synthé 500MHz | this afternoon, I firstly connected the
HV output of the Laselock to the FP-cavity
PZT : https://elog.lal.in2p3.fr/FPC/THOMX+commissioning/248 |
|
|
248
|
Wed Sep 13 17:57:08 2023 |
Ronic Chiche | Fixed | issue | lasers and optics | detectors and electronics | ThomX igloo | work with HV voltage on the Laselock | This afternoon, I connected the HV output
of the Laselock (instead of the standard
0-10V output) to the FP-cavity PZT to increase |
|
|
255
|
Wed Sep 13 12:24:14 2023 |
Ronic Chiche | Fixed | info | detectors and electronics | Optical room | lock oscillateur 33MHz - synthé 500MHz | this morning, I added a Thorlabs lowpass
filter at 1kHz after the mixer and a resistor
at the Laselock output to the FP-cavity PZT. |
|
|
254
|
Tue Sep 12 17:58:41 2023 |
Ronic Chiche | Fixed | info | detectors and electronics | Optical room | lock oscillateur 33MHz - synthé 500MHz | this afternoon, I tried to lock the FP-cavity
on a local 500MHz synthesizer as a frequency
reference |
|
|
245
|
Tue Sep 12 14:28:36 2023 |
Ronic Chiche | Fixed | info | mechanics | lasers and optics | detectors and electronics | ThomX igloo | Removing high order modes | yesterday with Daniele, we tried again
to move the arm horizontally and vertically
from the "zero position" to have |
|
|
244
|
Fri Sep 8 19:45:56 2023 |
Ronic Chiche | Fixed | info | lasers and optics | ThomX igloo | 33MHz oscillator + Alphanov amplifier lock | redoing the PDH error signal scheme with
discrete components is more flexible and
it is easier to check the signal/noise ratio. |
|
|
253
|
Fri Sep 8 19:35:36 2023 |
Ronic Chiche | Fixed | info | detectors and electronics | Optical room | lock oscillateur 33MHz - synthé 500MHz | this afternoon, I installed the frequency
detection scheme in the bunker :
- I changed the large reflected |
|
|
242
|
Fri Sep 8 18:22:21 2023 |
Ronic Chiche | Fixed | info | mechanics | lasers and optics | detectors and electronics | ThomX igloo | Removing high order modes | here is the picture of the L-shape arm
and the inside of the vessel.
this image corresponds to the "zero" |
|
|
241
|
Fri Sep 8 12:43:04 2023 |
Ronic Chiche | Fixed | info | mechanics | lasers and optics | detectors and electronics | ThomX igloo | Removing high order modes | this morning we locked the laser and the
FP-cavity with ~ 40kW => some HOM appeared
"randomly" depending on the power. |
|
|
240
|
Thu Sep 7 19:23:36 2023 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | ThomX igloo | Fast feedback loop between laser and FP cavity | today, after the several unsuccessful attempt
yesterday to get an improvement in the lock,
we decided to "rebuild" |
 |
|
239
|
Thu Sep 7 18:51:43 2023 |
Ronic Chiche | Fixed | issue | lasers and optics | ThomX igloo | Onefive laser modelock and Smaract CEP controller | today, during an attempt in improving the
CEP with the Smaract controller CH2, we lost
the laser modelock. |
|
|
238
|
Wed Sep 6 20:09:56 2023 |
Ronic Chiche | Fixed | info | lasers and optics | ThomX igloo | Smaract controller remplacement | previously, we were using a spare Smaract
MCS controller to drive the Onefive linear
stages (without -LV -low vibration- |
|
|
237
|
Wed Sep 6 19:57:48 2023 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | ThomX igloo | Fast feedback loop between laser and FP cavity | today, we tried to lock the FP cavity with
the Smaract motors ON (with option -LV).
we know the Smaract controllers produce |
|
|
236
|
Tue Sep 5 18:21:12 2023 |
Ronic Chiche | Fixed | info | lasers and optics | ThomX igloo | FP-cavity FSR shift | today, to match the ring frequency at 500.25MHz
(15th laser harmonic), we did a frequency
shift on the laser using the Smaract motors |
|
|
235
|
Tue Sep 5 18:08:39 2023 |
Ronic Chiche | Fixed | info | lasers and optics | ThomX igloo | Equipments shutdown | on the August 30rd and 31th, a global power
shutdown was forseen for ThomX.
to prevent damage on equipments, |
|
|
234
|
Tue Sep 5 17:59:24 2023 |
Ronic Chiche | Fixed | issue | lasers and optics | detectors and electronics | ThomX igloo | work with HV voltage on the Laselock | Yesterday, I checked the 2 output HV channels
of the LaseLock : they work properly but
the noise is bigger than the low voltage |
|
|
233
|
Wed Aug 2 13:13:52 2023 |
Ronic Chiche | Fixed | issue | lasers and optics | detectors and electronics | ThomX igloo | work with HV voltage on the Laselock | presently, the voltage on the laser PZT
is 0-10V, but during the several runs we
did, this voltage is too low to compensate |
|
|
232
|
Wed Aug 2 13:07:59 2023 |
Ronic Chiche | Not Fixed | issue | detectors and electronics | ThomX igloo | ThomX ring injection kicker noise => USB communication issue with Alphanov amplifier | several times already, when the electrons
ring injection kicker is running @10Hz, we
observed peaks at the same frequency on reflected |
|
|
252
|
Wed Aug 2 11:38:20 2023 |
Ronic Chiche | Fixed | info | detectors and electronics | Optical room | lock oscillateur 33MHz - synthé 500MHz | Today, I connected the BNC-DB9 female prolongator
cable to the FP-cavity PZT cable (DB9-DB9)
and to the channel B of the Laselock. |
 |
|
251
|
Mon Jul 31 19:17:40 2023 |
Ronic Chiche | Fixed | info | detectors and electronics | Optical room | lock oscillateur 33MHz - synthé 500MHz | Today, I installed a DB9-DB9 female-male
cable on the PZT connector of the FP-cavity.
the PZT is connected between pins |
 |
|
250
|
Fri Jul 28 13:19:22 2023 |
Ronic Chiche | Fixed | info | detectors and electronics | Optical room | lock oscillateur 33MHz - synthé 500MHz |
régler le problème
1:
Kevin m'a apporté un déphaseur |
|
|
249
|
Thu Jul 27 18:47:57 2023 |
Ronic Chiche | Fixed | info | detectors and electronics | Optical room | lock oscillateur 33MHz - synthé 500MHz | pour préparer le lock cavité-anneau,
j'ai un setup de lock en salle optique
entre le laser OneFive 133MHz et un synthé |
|
|
227
|
Wed Jul 26 14:49:41 2023 |
Ronic Chiche | Fixed | info | lasers and optics | ThomX igloo | 33MHz oscillator + Alphanov amplifier lock | Today, we locked the cavity with input
power @ 30% for the amp => we got 40kW
with only 30% of coupling (and a bad lock |
|
|
226
|
Wed Jun 28 19:07:42 2023 |
Ronic Chiche | Fixed | issue | lasers and optics | ThomX igloo | Incoming laser beam power issue | today, we observed on the photodiode used
in reflexion of the cavity, that its voltage
level stops increasing after 50% of power |
|
|
225
|
Wed Jun 28 19:01:03 2023 |
Ronic Chiche | Fixed | info | lasers and optics | ThomX igloo | First X rays and FP-cavity mode and electron beam waists size @ IP | on friday 23/06 afternoon, after scanning
the hexapod z-axis, we observed a cut of
the power stored in the FP-cavity (with constant |
 |
|
224
|
Thu Jun 22 20:20:03 2023 |
Ronic Chiche | Fixed | info | lasers and optics | ThomX igloo | 33MHz oscillator + Alphanov amplifier lock | we checked yesterday morning the real input
power @ 30% for the amp => it is 16W in
agreement with the previously measured values |
|
|
223
|
Tue Jun 20 19:08:17 2023 |
Ronic Chiche | Fixed | info | lasers and optics | ThomX igloo | 33MHz oscillator + Alphanov amplifier lock | I checked with the Matlab code below the
CEP detuning effect (2nm sech² spectrum...
not exactly the same as in ThomX) |
|
|
222
|
Tue Jun 20 18:45:10 2023 |
Ronic Chiche | Fixed | info | lasers and optics | ThomX igloo | 33MHz oscillator + Alphanov amplifier lock | this morning, I tested the laser+amplifier
@ 30% lock on the FP cavity with and without
Smaract motors. |
  |
|
221
|
Mon Jun 19 16:08:15 2023 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | cabling | software | ThomX igloo | Cavity Lock - Alphanov Amplifier | The computer is possible to connect from
the control room,
we are able to run remotely the |
|
|
220
|
Fri Jun 9 19:51:43 2023 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | cabling | software | ThomX igloo | Cavity Lock - Alphanov Amplifier | In the morning, we locked on the first
resonance. With an increase on the amplifier
power @ 20-25% and 30%, which reduced the |
 |
|
219
|
Thu Jun 8 11:12:20 2023 |
Ronic Chiche | Fixed | info | lasers and optics | ThomX igloo | 33MHz oscillator + Alphanov amplifier lock | After removing the 2 generators from the
optical table, the lock is much more stable
and now, it is possible to lock on the main |
|
|
218
|
Wed Jun 7 21:46:50 2023 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | cabling | software | ThomX igloo | Cavity Lock - Alphanov Amplifier | Today with Ronic,
starting with major events that
happened (Water circulation + ThomX valves |
   |
|
217
|
Tue Jun 6 15:52:59 2023 |
Ronic Chiche | Fixed | info | lasers and optics | ThomX igloo | 33MHz oscillator + Alphanov amplifier lock | today with Daniele, we locked easily (but
with a noisy lock) on the secundary resonance
and we tried to lock on the main resonance |
 |
|
216
|
Tue Jun 6 01:12:11 2023 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | cabling | software | ThomX igloo | Cavity Lock - Alphanov Amplifier | Today, I installed a power meter at the
transmission point of the 1st spherical mirror
, transmission 3 ppm (direct from cavity |
 |
|
215
|
Fri Jun 2 10:54:25 2023 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | cabling | software | ThomX igloo | Cavity Lock - Alphanov Amplifier | Yesterday, with Ronic we locked ThomX cavity
on the second resonance
Laser : 33.36 MHz , Amplifier : |
13x |
|
214
|
Thu Jun 1 18:15:04 2023 |
Ronic Chiche | Fixed | info | lasers and optics | ThomX igloo | 33MHz oscillator + Alphanov amplifier lock | finding the right modulation/demodulation
PDH phase is very difficult on the main resonance
because the we get non stationnary signals |
|
|
213
|
Thu Jun 1 10:31:45 2023 |
Ronic Chiche | Fixed | info | lasers and optics | ThomX igloo | 33MHz oscillator + Alphanov amplifier lock | the last tries to lock the 33MHz + amplifier
to the 30k Finesse FP-cavity were unsuccessful.
during a laser Frep scan using |
|
|
212
|
Tue May 30 18:32:37 2023 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | cabling | software | ThomX igloo | Cavity Lock - Alphanov Amplifier | This morning, while trying Guillaume solution
of disconnecting the 24 V necessary to the
second and third stage and raise the threshold |
|
|
211
|
Mon May 22 16:07:12 2023 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | ThomX igloo | PW laser Injection into cavity | Today with Ronic and Daniele we attempted
to lock the cavity, but the alphanov amplifier
did not turn on because of an error in MMD3 |
 |
|
210
|
Wed Apr 19 16:41:46 2023 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | ThomX igloo | PW laser Injection into cavity | Added Note: the coupling we get is at low
power, only preamplifier is on (~ 300 mW)
was done at the end due to excitation |
|
|
209
|
Wed Apr 19 16:39:28 2023 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | ThomX igloo | PW laser Injection into cavity |
On Monday with Daniele,
we
did full characterization of amplifier beam
@ 10% amplification, adjusted the telescope |
   |
|
208
|
Thu Apr 13 17:48:49 2023 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | ThomX igloo | PW laser Injection into cavity | Yesterday,
we installed the second
high power reflecting mirrors at the output |
|
|
207
|
Tue Apr 11 16:58:16 2023 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | ThomX igloo | FP Finesse measurement using CW | This morning, with Ronic and Daniele, we
locked the cavity again (The lock was relatively
easy and stable during the reading of the |
  |
|
206
|
Fri Apr 7 15:56:40 2023 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | ThomX igloo | CW FP Cavit lock | This morning with Daniele and Viktor,
- we confirmed the "potato"
mode was well centered on the injected beam |
|
|
205
|
Fri Apr 7 00:26:11 2023 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | ThomX igloo | CW FP Cavit lock | Yesterday morning we locked the cavity
on a strange mode in the cavity (we call
it mode, but not sure what it is ??) |
  |
|
204
|
Tue Apr 4 13:03:23 2023 |
Manar Amer | Fixed | report | lasers and optics | vacuum | detectors and electronics | ThomX igloo | Cavity Alighnment | Today, we prepared lenses for a telescope
for the CW laser injection into the cavity,
yet to be installed |
 |
|
203
|
Tue Mar 28 13:56:52 2023 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | ThomX igloo | Cavity Alighnment | Last week, with Ronic and Victor we aligned
the cavity using CW laser (Koheras)
we have also installed |
9x |
|
202
|
Mon Mar 20 17:55:25 2023 |
Ronic Chiche | Fixed | report | lasers and optics | software | ThomX igloo | Alphanov amplifier beam profile measurement | due to several "case temperature"
issues, I change the "Max case temperature"
in the "general config" of the |
|
|
201
|
Mon Mar 20 17:39:28 2023 |
Ronic Chiche | Fixed | info | utilities | ThomX igloo | Power shut down on Saturday the 18th | Today, I restarted all the equipements
:
Chiller |
|
|
200
|
Mon Mar 20 17:23:09 2023 |
Ronic Chiche | Fixed | info | lasers and optics | Optical room | 33MHz laser SN2439 back to Orsay | As the general local network for the FP-cavity
devices is 192.168.xxx.xxx, I changed the
IP adress of the smaract laser motors (Frep |
 |
|
199
|
Mon Mar 20 09:33:54 2023 |
Ronic Chiche | Fixed | info | utilities | ThomX igloo | Power shut down on Saturday the 18th | All the equipments have been switched off
on Friday 17th due to a power shut down on
Saturday 18th : |
|
|
198
|
Fri Mar 17 18:54:19 2023 |
Manar Amer | Fixed | report | lasers and optics | Optical room | New Mirrors from LMA _ Images | Today we tested a mirror from one patch
image is for the front face of
the mirror |
   |
|
197
|
Wed Mar 15 21:14:51 2023 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | ThomX igloo | Amplifier Beam Profile over time | Information about today's work is added
to logBook !!
|
|
|
196
|
Wed Mar 15 21:13:07 2023 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | ThomX igloo | Amplifier Beam Profile over time | This morning we took data of the beam profile
at 4 different points to see the evolution
of |
10x |
|
195
|
Tue Mar 14 16:54:48 2023 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | ThomX igloo | Amplifier Beam Profile over time | This morning, with Ronic, we opened the
compressor box to observe if there is any
misalignment of the mounts or the CVBG's |
|
|
194
|
Mon Mar 13 16:10:24 2023 |
Ronic Chiche | Fixed | report | lasers and optics | software | ThomX igloo | Alphanov amplifier beam profile measurement | We took reading of the beam profile of
the amplifier without a lens @ 30 cm from
the 2nd wedge for amplification percentages |
|
|
193
|
Mon Mar 13 14:02:59 2023 |
Ronic Chiche | Fixed | info | lasers and optics | ThomX igloo | CW laser installation and cleaning | This morning with Ronic , in preparation
for the mirror installation, we removed additional
mechanics and cables from the table. |
|
|
192
|
Wed Mar 8 15:11:49 2023 |
Ronic Chiche | Fixed | info | lasers and optics | ThomX igloo | CW laser installation and cleaning | This morning with Manar, in order to prepare
the installation of the news FP cavity mirrors,
- we installed the Koheras below |
|
|
191
|
Wed Mar 8 14:49:12 2023 |
Ronic Chiche | Fixed | report | lasers and optics | software | ThomX igloo | Alphanov amplifier beam profile measurement | this morning with Manar,
we checked the Alphanov amplifier
issue : "The laser has been stopped |
|
|
190
|
Mon Feb 27 18:23:13 2023 |
Ronic Chiche | Fixed | report | lasers and optics | software | ThomX igloo | Alphanov amplifier beam profile measurement | This morning with Victor we took a reading
of the beam profile using a 400 mm lens
at 70 % and 100 % amplification. |
|
|
189
|
Thu Feb 23 10:15:30 2023 |
Ronic Chiche | Fixed | report | lasers and optics | software | ThomX igloo | Alphanov amplifier beam profile measurement |
Yesterday,
Guillaume Machinet and Vincent Clet from
Alphanov came to fixe some issues with the |
|
|
188
|
Wed Feb 22 16:11:32 2023 |
Ronic Chiche | Fixed | report | lasers and optics | software | ThomX igloo | Alphanov amplifier beam profile measurement | On Monday 20th of February, Daniele and
Viktor took some beam profile measurement
data @ 50% of power amplification. |
|
|
187
|
Tue Feb 14 12:53:09 2023 |
Ronic Chiche | Fixed | report | lasers and optics | software | ThomX igloo | Alphanov amplifier beam profile measurement | This morning with Daniele, we did a second
measurement of the beam profile using a different
lens of focal 400 mm. |
|
|
186
|
Fri Feb 10 09:54:46 2023 |
Ronic Chiche | Fixed | report | lasers and optics | software | ThomX igloo | Alphanov amplifier beam profile measurement | This morning,
- with the "Alphanov"
software => Central panel => "system" |
|
|
185
|
Wed Feb 8 14:09:50 2023 |
Ronic Chiche | Fixed | report | lasers and optics | software | ThomX igloo | Alphanov amplifier beam profile measurement | With Daniele after, we took a readings
of the beam with a lens of 750 mm.
From the observed data, we can |
|
|
184
|
Wed Feb 8 11:25:50 2023 |
Ronic Chiche | Fixed | report | lasers and optics | software | ThomX igloo | Alphanov amplifier beam profile measurement | we have had this new issue (watchdog alarm
switching off the amplifier) for several
days. |
|
|
183
|
Mon Jan 30 17:40:10 2023 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | ThomX igloo | Alphanov amplifier beam profile Data | This Morning with Victor the amplifier
was turned on @ 20% amplification (output
~ 9 W ) for approximately 3 hours and no |
|
|
182
|
Mon Jan 30 17:28:33 2023 |
Ronic Chiche | Fixed | report | lasers and optics | software | ThomX igloo | Alphanov amplifier beam profile measurement | the laser amplifier worked for some days
but it ended to a "watchdog" alarm
which switches off the amplifier... investigation |
|
|
181
|
Mon Jan 30 17:28:00 2023 |
Ronic Chiche | Fixed | report | lasers and optics | software | ThomX igloo | Alphanov amplifier beam profile measurement | Ronic on Friday operated the Amplifier
from the Alphanov software, switched it off
then turned on the LAL software, |
|
|
180
|
Wed Jan 11 17:38:13 2023 |
Ronic Chiche | Fixed | info | lasers and optics | ThomX igloo | Alphanov amplifier beam profile measurement | this morning with Manar,
- we fixed the chiller problem
(+/-2°C fluctuation around the set temperature |
|
|
179
|
Wed Jan 11 17:31:00 2023 |
Ronic Chiche | Fixed | info | lasers and optics | software | ThomX igloo | Alphanov amplifier beam profile measurement | Today with
Ronic
For |
|
|
178
|
Mon Jan 9 14:03:16 2023 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | ThomX igloo | Alphanov amplifier beam profile Data | Adding the schematic of the measurements.,
the 4°
Beam Deviation, AR Coating ( B coating) |
8x |
|
177
|
Mon Jan 9 12:11:14 2023 |
Ronic Chiche | Fixed | info | lasers and optics | ThomX igloo | Alphanov amplifier beam profile measurement | this morning with Manar,
- we checked first the chiller
problem. |
|
|
176
|
Thu Jan 5 09:58:50 2023 |
Ronic Chiche | Fixed | info | lasers and optics | ThomX igloo | Alphanov amplifier beam profile measurement | yesterday morning with Manar,
1) we fixed the threshold level
of the laser input signal which makes the |
 |
|
175
|
Mon Jan 2 15:21:09 2023 |
Ronic Chiche | Fixed | info | lasers and optics | ThomX igloo | Alphanov amplifier beam profile measurement | today with Manar, we brought everything
to make the profile measurement.
the chiller was in error |
|
|
174
|
Thu Dec 15 11:41:36 2022 |
Ronic Chiche | Fixed | issue | lasers and optics | ThomX igloo | Alphanov amplifier issue | Yesterday, we received the controller back
from Alphanov
and I tested it immediately in the |
|
|
173
|
Tue Dec 6 11:47:36 2022 |
Ronic Chiche | Fixed | issue | lasers and optics | ThomX igloo | Alphanov amplifier issue | Today, I did a Teams meeting with Guillaume.
He didn't see any problem with
the controller. |
|
|
172
|
Thu Dec 1 13:51:05 2022 |
Ronic Chiche | Fixed | issue | lasers and optics | ThomX igloo | Alphanov amplifier issue | The laser amplifier controller has been
sent yesterday and received today by Alphannov.
they should do the assessment quickly... |
|
|
171
|
Wed Nov 9 14:49:52 2022 |
Ronic Chiche | Fixed | issue | lasers and optics | ThomX igloo | Alphanov amplifier issue | I just tested the fuse inside the black
ON/OFF switch on the rear panel => it
is OK ! :-( |
|
|
170
|
Wed Nov 9 13:03:50 2022 |
Ronic Chiche | Fixed | issue | lasers and optics | ThomX igloo | Alphanov amplifier issue | on Monday morning 7/11, we tried to restart
the Alphanov amplifier which was not turned
on since end of april 2022, but it didn't |
|
|
169
|
Wed Nov 9 11:34:54 2022 |
Ronic Chiche | Fixed | info | lasers and optics | ThomX igloo | Strecher and fiber injection alignment | Monday 7/11 morning, the power in the fiber
was still 6.2 mW
|
|
|
168
|
Thu Nov 3 09:09:18 2022 |
Ronic Chiche | Fixed | info | lasers and optics | ThomX igloo | Strecher and fiber injection alignment | this morning : still 6.2 mW at the output
of the fiber.
the powermeter has been removed |
|
|
167
|
Wed Nov 2 11:42:43 2022 |
Ronic Chiche | Fixed | info | lasers and optics | ThomX igloo | Strecher and fiber injection alignment | This morning with Manar, we continued the
strecher CVBG alignment and fiber injection
procedure : |
|
|
166
|
Mon Oct 24 17:35:01 2022 |
Ronic Chiche | Fixed | info | lasers and optics | ThomX igloo | Strecher and fiber injection alignment | Manar + Victor, today in the morning we
aligned the CVBG of the stretcher.
The double path using the mirror |
|
|
165
|
Thu Oct 20 15:01:02 2022 |
Ronic Chiche | Fixed | info | lasers and optics | ThomX igloo | Strecher and fiber injection alignment | I used the 33MHz spectrum measurement :
https://elog.lal.in2p3.fr/FPC/THOMX+commissioning/153
fitted by P=P0*sech²((f-f0)/df) |
 |
|
164
|
Wed Oct 19 15:01:32 2022 |
Ronic Chiche | Fixed | info | lasers and optics | ThomX igloo | Strecher and fiber injection alignment | This morning with Ronic, using a pickup
mirror, we measured the power in different
locations along the path of the stretcher |
|
|
163
|
Wed Oct 19 14:57:43 2022 |
Ronic Chiche | Fixed | info | lasers and optics | ThomX igloo | Strecher and fiber injection alignment | This morning with Manar, we measured the
power at different points:
- direct measurement at the output |
|
|
162
|
Tue Oct 18 17:51:12 2022 |
Ronic Chiche | Fixed | info | lasers and optics | ThomX igloo | Strecher and fiber injection alignment | In preparation for tomorrow morning, I
did a test with a 45° mount to have a
power pickup inside the injection box. |
|
|
161
|
Mon Oct 17 13:58:08 2022 |
Ronic Chiche | Fixed | info | lasers and optics | ThomX igloo | Strecher and fiber injection alignment | This morning with Viktor, we started the
alignment of the CVBG and fiber.
we did a better alignment of the |
|
|
160
|
Thu Oct 13 12:26:07 2022 |
Ronic Chiche | Fixed | info | lasers and optics | ThomX igloo | Strecher and fiber injection alignment | Today, after laser was modelocked, we checked
the power inside the fiber coming from the
Alphanov Strecher box. |
|
|
159
|
Thu Oct 13 12:19:11 2022 |
Ronic Chiche | Fixed | info | lasers and optics | Optical room | 33MHz laser SN2439 back to Orsay | Today, we succeded to make the laser modelock.
the ouptut power is above 35mW (the
powermeter was saturated) |
|
|
158
|
Thu Oct 13 12:12:49 2022 |
Ronic Chiche | Fixed | info | lasers and optics | Optical room | 33MHz laser SN2439 back to Orsay | Yesterday, we put back the 33MHz oscillator
into the casemate with the new Smaract controller.
after switching ON the laser controller, |
|
|
157
|
Fri Oct 7 17:47:39 2022 |
Ronic Chiche | Fixed | info | lasers and optics | Optical room | 33MHz laser SN2439 back to Orsay | Today, we used an "ELI-NP" Smaract
controller made with these 2 references :
MCS-3CC-ETH-TAB (SN 2271) => main |
|
|
156
|
Wed Oct 5 15:51:26 2022 |
Ronic Chiche | Fixed | info | lasers and optics | Optical room | 33MHz laser SN2439 back to Orsay | Yesterday with Aurélien, we try
to make the laser modelock using the Smaract
translation stages embedded inside the laser |
|
|
155
|
Mon Oct 3 18:54:58 2022 |
Ronic Chiche | Fixed | info | lasers and optics | Optical room | 33MHz laser SN2439 back to Orsay | This morning, with Aurélien and
Daniele, we did the swap between the 33MHz
and 133MHz oscillators. |
|
|
154
|
Tue Aug 30 18:31:49 2022 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | Amplifier output power | We checked the Dichroic mirror we have
: it is a DMSP1000 shortpass dichroic mirror
as specified in this post. |
|
|
153
|
Tue Jul 12 15:55:20 2022 |
Ronic Chiche | Fixed | info | lasers and optics | Optical room | 33MHz laser SN2439 back to Orsay | On the 8th of July, the SN2439 33MHz laser
was returned from NKT to our lab, being repaired.
it stayed all the weekend to warm |
|
|
152
|
Wed Jun 15 15:18:57 2022 |
Ronic Chiche | Fixed | info | lasers and optics | ThomX igloo | mirrors removing | This morning with Viktor, we opened the
2 vessels and removed the 4 FP-cavity mirrors.
all the mirrors have been put in |
|
|
151
|
Tue Jun 14 10:43:07 2022 |
Ronic Chiche | Fixed | info | vacuum | ThomX igloo | Vessels vacuum at ambiant pressure | Last Friday and this morning, with Bruno,
we close the ring/cavity valves and put some
dry air in the two vessels through a filter |
|
|
150
|
Tue Apr 26 11:15:23 2022 |
Ronic Chiche | Fixed | issue | lasers and optics | ThomX igloo | Alphanov amplifier compressor's CVBG thermal images | last Friday with Manar, we took some thermal
images of the Alpnavov compressor box.
I post a small document to summarize |
|
|
149
|
Tue Apr 26 11:12:58 2022 |
Ronic Chiche | Fixed | issue | lasers and optics | ThomX igloo | Alphanov amplifier compressor's CVBG thermal images | last Friday with Manar, we took some thermal
images of the Alpnavov compressor box.
I post a small document to summarize |
|
|
148
|
Tue Apr 19 12:15:43 2022 |
Manar Amer | Fixed | report | lasers and optics | ThomX igloo | Alphanov amplifier Beam Profile | For better comparison ,
the measurements done previously
with 2 CVBGs was done at ~ 30 cm and the |
8x |
|
147
|
Fri Apr 15 19:00:20 2022 |
Manar Amer | Fixed | report | lasers and optics | ThomX igloo | Alphanov amplifier Beam Profile | Victor, Ronic, Manar
Today was dedicated to the
study of the CVBG, and it's effect on |
20x |
|
146
|
Fri Apr 8 19:25:16 2022 |
Manar Amer | Fixed | report | lasers and optics | ThomX igloo | Alphanov amplifier Beam Pulse Duration | Pulse Duration FWHM = 12.9 ps
|
|
|
145
|
Fri Apr 8 19:24:32 2022 |
Manar Amer | Fixed | report | lasers and optics | ThomX igloo | Alphanov amplifier Beam Pulse Duration | Measurement of the pulse was done at the
end of the afternoon, Pulse Duration
FWHM = 12.9 ps |
  |
|
144
|
Fri Apr 8 13:34:54 2022 |
Manar Amer | Fixed | report | lasers and optics | ThomX igloo | Alphanov amplifier Beam Pulse Duration | The pulse duration from the amplifier compressor
output will be measured using PulseCheck
autocorelator |
|
|
143
|
Fri Apr 8 13:15:18 2022 |
Ronic Chiche | Fixed | info | lasers and optics | ThomX igloo | First hands on the Alphanov amplifier & software | Software Works well and is operational.
Just closing the log series!!!
|
|
|
142
|
Fri Apr 8 13:12:34 2022 |
Manar Amer | Fixed | report | lasers and optics | ThomX igloo | Alphanov amplifier Beam Profile | This Morning, another reading was taken
for the output of the amplifier after the
compressor using 2 wedge mirrors. |
12x |
|
141
|
Mon Apr 4 14:23:14 2022 |
Manar Amer | Fixed | report | lasers and optics | ThomX igloo | Alphanov amplifier Beam Profile | Adding the readings 20% , 30% ,
40% for output of amplifier after the
compressor |
6x |
|
140
|
Sat Apr 2 00:51:07 2022 |
Manar Amer | Fixed | report | lasers and optics | ThomX igloo | Alphanov amplifier Beam Profile | Readings of the beam shape and fit at the
output of the compressor
differance from |
    |
|
139
|
Sat Apr 2 00:45:25 2022 |
Manar Amer | Fixed | report | lasers and optics | ThomX igloo | Alphanov amplifier Beam Profile | Readings of the beam shape and horizontal
(upper plot) and vertical (lower plot) axis
fit at the direct output of the amplifier. |
9x |
|
138
|
Fri Apr 1 23:59:51 2022 |
Manar Amer | Fixed | report | lasers and optics | ThomX igloo | Alphanov amplifier Beam Profile | Today a second reading of the beam profile
was done , with Victor ,Ronic, Aurlien and
Manar |
|
|
137
|
Wed Mar 23 13:55:11 2022 |
Manar Amer | Fixed | report | lasers and optics | ThomX igloo | Alphanov amplifier Beam Profile | Adding the fitted beam in 1D in Horizontal
and vertical axis.
for 10% to 60% |
6x |
|
136
|
Tue Mar 22 21:20:28 2022 |
Manar Amer | Fixed | report | lasers and optics | ThomX igloo | Alphanov amplifier Beam Profile |
|
|
|
135
|
Tue Mar 22 21:19:48 2022 |
Manar Amer | Fixed | report | lasers and optics | ThomX igloo | Alphanov amplifier Beam Profile | Today: Manar, Ronic and Aurlien started
the study of the beam profile of the alphanov
amplifier at high power. |
8x |
|
134
|
Fri Mar 18 15:04:30 2022 |
Ronic Chiche | Fixed | info | lasers and optics | ThomX igloo | Alphanov amplifier power measurement | answers from Guillaume:
- the chiller temperature has to
be set to 25°C |
|
|
133
|
Fri Mar 18 11:48:14 2022 |
Ronic Chiche | Fixed | info | lasers and optics | ThomX igloo | Alphanov amplifier power measurement | This morning, with Manar and Aurélien,
we measure the power directly at
the output of the Alphanov amplifier with |
|
|
132
|
Mon Mar 14 18:39:40 2022 |
Manar Amer | Fixed | info | mechanics | lasers and optics | detectors and electronics | ThomX igloo | Current Installed Setup | Attached is the current setup in ThomX |
|
|
131
|
Fri Mar 11 17:58:24 2022 |
Ronic Chiche | Fixed | info | lasers and optics | ThomX igloo | First hands on the Alphanov amplifier & software | Additional information related to the injected
power into the amplifier fibers.
power = 4.45 mW (as shown from |
|
|
130
|
Fri Mar 11 17:33:33 2022 |
Ronic Chiche | Fixed | info | lasers and optics | ThomX igloo | First hands on the Alphanov amplifier & software | Aurélien, Manar, and I spent more
than 2h trying to start the software communicating
with the Alphanov amplifier controller. |
|
|
129
|
Fri Mar 11 12:59:35 2022 |
Manar Amer | Fixed | report | lasers and optics | ThomX igloo | Cavity beam Image | Updated beam image after change on the
mode axis.
Taken after P4. |
 |
|
128
|
Fri Mar 11 12:46:58 2022 |
Ronic Chiche | Fixed | info | lasers and optics | ThomX igloo | FP cavity mode axis change and Finesse measurement | this morning with Manar, we did a cavity
mode axis change.
we checked the cavity mode centroid |
|
|
127
|
Fri Feb 4 10:59:56 2022 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | ThomX igloo | Cavity Lock and Finess measurment | one thing which could reduce the Finesse
is the L-shape metal piece if it is slightly
inserted in the FP-cavity mode path. |
 |
|
126
|
Thu Feb 3 19:01:04 2022 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | ThomX igloo | Cavity Lock and Finess measurment |
After changing the way of injecting
modulation for PDH and modulation for FSR |
|
|
125
|
Thu Feb 3 18:59:10 2022 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | ThomX igloo | Cavity Lock and Finess measurment |
to measure the Finesse, instead
of having 2x EOM for the PDH and for the |
|
|
123
|
Thu Feb 3 18:40:04 2022 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | ThomX igloo | FP cavity alignment | The fluctuation problem has been solved.
It was simply the new scheme to inject
2 RF frequencies in a single EOM. |
|
|
121
|
Thu Feb 3 14:11:50 2022 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | ThomX igloo | Cavity Lock and Finess measurment | This morning, me and Ronic managed to obtain
the FSR and image of the finesse which is
to be analyzed. |
6x |
|
120
|
Thu Feb 3 14:10:08 2022 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | ThomX igloo | FP cavity alignment | As it can be seen on the first plot, even
with a good locking (good reduction of "high"
frequencies noise: we had better locking |
|
|
119
|
Thu Feb 3 13:56:24 2022 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | ThomX igloo | FP cavity alignment | Ending alignment series !!
|
|
|
118
|
Wed Feb 2 11:41:01 2022 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | ThomX igloo | FP cavity alignment | Adding Oscilloscope images
delocked + locked intervals
showing the 20% coupling
lock |
  |
|
117
|
Wed Feb 2 11:22:51 2022 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | ThomX igloo | FP cavity alignment | This morning with Manar, we installed the
AOM+RF amplifier and the associated fast
feedback loop. |
|
|
116
|
Tue Feb 1 16:40:06 2022 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | ThomX igloo | FP cavity alignment | This afternoon, I did some alignment of
the injection mirrors with a fast scan on
the LaseLock to get a regular transmission |
|
|
115
|
Tue Feb 1 14:17:02 2022 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | ThomX igloo | FP cavity alignment | Installed and inputs:
CW laser ; power = 101
mW
PDH ;
at output
Low |
 |
|
114
|
Wed Jan 19 09:36:53 2022 |
Manar Amer | Fixed | report | lasers and optics | ThomX igloo | FP cavity alignment | Yesterday, we did the alignment again using
Iris and beam profilers to obtain a more
precise result. |
|
|
113
|
Mon Jan 17 21:22:28 2022 |
Manar Amer | Fixed | report | lasers and optics | ThomX igloo | FP cavity alignment | ***** Continuation of the alignment ----
FP Cavity Open --- ****
The cavity was put under outer |
   |
|
112
|
Mon Jan 17 10:04:14 2022 |
Ronic Chiche | Fixed | info | mechanics | ThomX igloo | Documentation about mechanics on Atrium | https://atrium.in2p3.fr/0dded51a-1cb0-43e6-ae0d-626cd5db7078
a lot of schematics regarding the |
|
|
111
|
Thu Jan 13 17:08:56 2022 |
Ronic Chiche | Fixed | issue | mechanics | lasers and optics | Optical room | Alignment procedure | Picture of the installed mirrors inside
the FP cavity.
To install an Iris instead of a |
|
|
110
|
Tue Jan 11 10:36:35 2022 |
Manar Amer | Fixed | report | lasers and optics | ThomX igloo | FP cavity alignment | The alignment is on hold until next week
17th - 18th Jan
an Alignment attempt will be done |
|
|
109
|
Thu Dec 2 21:31:21 2021 |
Manar Amer | Fixed | report | lasers and optics | ThomX igloo | FP cavity alignment | Note the direction of injection is
M1 - M2 - M3 - M4
|
 |
|
108
|
Fri Nov 26 20:12:10 2021 |
Ronic Chiche | Fixed | report | lasers and optics | ThomX igloo | FP cavity alignment | A continuation of the alignment process
was done, there was change in it due to variation
in temperature, |
|
|
107
|
Thu Nov 4 18:57:16 2021 |
Ronic Chiche | Fixed | info | lasers and optics | ThomX igloo | FP cavity alignment | This afternoon, we continued the alignment
of the red laser.
we did it using the 2 final injection |
|
|
106
|
Thu Nov 4 13:05:49 2021 |
Ronic Chiche | Fixed | info | lasers and optics | ThomX igloo | FP cavity alignment | as the iris used to locate the FP-cavity
axis have been removed before moving the
table inside the Igloo, we have to find again |
|
|
105
|
Fri Dec 18 17:06:53 2020 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | Onefive ouput power and spectrum | 1) Note: The OneFive laser used for
experimenting is the one for the SBox
but, for now only this laser arrived |
|
|
104
|
Fri Dec 18 16:10:04 2020 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | Onefive ouput power and spectrum | After turning on, one can see the 133.33MHz
Onefive output power for ~40min with OD2
filter (~/20). So the real output power is |
   |
|
103
|
Fri Nov 6 14:23:16 2020 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | Beam size and finesse | Measurement behind P4 (planar mirror)
|
|
|
102
|
Tue Oct 27 13:13:50 2020 |
Loïc Amoudry | Fixed | info | lasers and optics | Optical room | Coating reflectivity | Coatings reflectivity curves and datas
for HR Saphir, HR Suprasil and HR ULE. |
6x |
|
101
|
Tue Jul 7 12:49:38 2020 |
Ronic Chiche | Fixed | info | lasers and optics | Optical room | Finesse measurement after the Edge installation | After the Edge installation inside the
cavity, the Finesse has been measured several
times by modulation technique with an average |
|
|
100
|
Tue Jun 16 13:03:52 2020 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | Finesse measurement after confinement | After 3 months without human presence,
finesse has been measured 3 times with
average optimization: |
    |
|
99
|
Fri Feb 28 17:44:12 2020 |
Ronic Chiche | Fixed | report | lasers and optics | Optical room | Pointing stability with CVBG | Yesterday, with Titouan, we made some measurements
on pointing stability of the laser beam after
amplifier and CVBG. |
 |
|
98
|
Fri Feb 28 09:20:37 2020 |
Ronic Chiche | Not Fixed | issue | lasers and optics | Optical room | Amplifier laser diodes issue | This is a long time issue for the ThomX
amplifier : on the 4 pumping diodes available,
the 1st diode has a higher temperature than |
  |
|
97
|
Wed Feb 26 16:48:02 2020 |
Ronic Chiche | Fixed | info | lasers and optics | Optical room | Optical spectrum before and after CVBG | Measurement of the optical spectrum with
Avantes OSA before (1st picture) and after
CVBG (2nd picture) with 2nd stage on the |
 |
|
96
|
Wed Feb 26 11:05:09 2020 |
Ronic Chiche | Fixed | info | lasers and optics | Optical room | Optical spectrum analyzer resolution | Same measurement with Koheras @100mW and
using fiber coupling lenses between Koheras
and Avantes OSA. |
|
|
95
|
Wed Feb 26 10:38:37 2020 |
Ronic Chiche | Fixed | info | lasers and optics | Optical room | Optical spectrum analyzer resolution | The Koheras @0.5mW is directly connected
with fibers FC/APC -> FC/PC to the Avantes
optical spectrum analyzer. |
|
|
94
|
Mon Feb 24 16:28:52 2020 |
Ronic Chiche | Fixed | report | lasers and optics | Optical room | Beam pulse duration | Last Thursday (20th of February), Loïc
and Titouan realigned the stretcher CVBG
to its nominal angle and they used an interferometric |
|
|
93
|
Wed Feb 19 17:21:28 2020 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | Powerup with 2.5ps pulses | A power up has been performed on ThomX
until 65kW intracavity power. We didn't
see any modes but stored power was really |
  |
|
92
|
Tue Feb 18 12:24:00 2020 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | ThomX Locked with CVBGs | ThomX has been locked with a new telescope
while using compression CVBGs.
Coupling is ~50-55% and lock is stable. |
    |
|
91
|
Fri Feb 14 18:02:37 2020 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | Telescope for compressors and ThomX | CVBGs telescope is done with w ~= 1mm.
ThomX telescope is done with w
~= 2.3mm in x and y. |
|
|
90
|
Fri Feb 14 09:26:07 2020 |
Ronic Chiche | Fixed | report | lasers and optics | Optical room | Beam pulse duration | Yesterday, Loïc put the CVBG's
back to their specified angles.
We used an interferometric technique |
|
|
89
|
Wed Feb 12 17:43:43 2020 |
Ronic Chiche | Fixed | report | lasers and optics | Optical room | Beam pulse duration | Yesterday, Loic installed a telescope before
CVBG's to reduce the spot size on CVBG's
and reduced the incident angle 0.5-1° |
|
|
88
|
Fri Feb 7 14:46:55 2020 |
Ronic Chiche | Fixed | report | lasers and optics | Optical room | Beam pulse duration | We installed the 2 CVBG for compression
after the amplifier.
We used an interferometric technique |
 |
|
87
|
Tue Feb 4 14:39:56 2020 |
Loïc Amoudry | Fixed | info | lasers and optics | Optical room | Onefive output power | Onefive output power measured today. 3.52
mW with OD1 filter ==> ~35mW.
|
|
|
86
|
Thu Nov 28 10:40:29 2019 |
Loïc Amoudry | Fixed | info | lasers and optics | Optical room | CVBG reference and Eric Cormier calculation | The Stretcher is the "D 24-02-II",
it must be used in double path before the
amplifier injection. |
  |
|
85
|
Wed Nov 27 13:53:57 2019 |
Loïc Amoudry | Fixed | info | lasers and optics | Optical room | Onefive output power | The pump voltage has been increased few
days ago when looking for a modlock of the
laser. |
|
|
84
|
Tue Nov 26 16:35:39 2019 |
Ronic Chiche | Fixed | issue | lasers and optics | detectors and electronics | Optical room | 30Hz noise issue | The 30 Hz noise issue has been solved !
It came from translation stage
of P1 and/or P4. |
|
|
83
|
Tue Nov 26 16:21:27 2019 |
Loïc Amoudry | Fixed | issue | vacuum | Optical room | Pneumatic valves | The pneumatic valves are now plugged on
the university air network.
The air valve is fully openned for |
|
|
82
|
Tue Nov 26 16:11:52 2019 |
Ronic Chiche | Fixed | issue | mechanics | Optical room | First Lock with 2nd satge of amplifier : Motor issue ? | The 500 ms noise disapeared. We had to
disable the "power save" mode of
the smaract translation stage. AND turn OFF |
|
|
81
|
Fri Nov 22 17:56:56 2019 |
Ronic Chiche | Fixed | issue | lasers and optics | detectors and electronics | Optical room | 30Hz noise issue | since some days, we observe the cavity
is difficult to lock and a strange 30Hz noise
has appeared on the PZT signal which normally |
|
|
80
|
Thu Nov 21 11:37:13 2019 |
Loïc Amoudry | Fixed | info | lasers and optics | Optical room | Onefive Origami 33MHz specs | Beam Size Onefive added
|
 |
|
79
|
Wed Nov 13 15:05:18 2019 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | Amplifier output power |
|
|
|
78
|
Wed Nov 13 14:44:56 2019 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | Amplifier output power | The ouput power of the ThomX amplifier
has been measured as a function of the 3rd
stage pumps current (0A is 1st and 2nd stage |
  |
|
77
|
Wed Nov 6 16:11:12 2019 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | Spherical mirrors at closest position. FSR, finesse and beam size. | The spherical mirrors are at the closest
position to get a FSR ~=33.3435 MHz. Planar
mirrors are at the largest position. |
   |
|
76
|
Tue Oct 22 09:10:45 2019 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | First mode degeneracy on ThomX | Yesterday, we've observed the first
degeneracy on ThomX cavity at ~115 kW stored.
The shape of the stored power on the oscilloscope |
    |
|
75
|
Fri Oct 11 18:49:00 2019 |
Ronic Chiche | Fixed | info | detectors and electronics | Optical room | New locking scheme | Before, the locking scheme was to produce
an error signal with the PDH box, send its
output to the electronic amplifier box and |
|
|
74
|
Fri Oct 11 18:42:32 2019 |
Ronic Chiche | Fixed | issue | lasers and optics | detectors and electronics | Optical room | First Lock with 2nd satge of amplifier : Finesse issue ? | First of all, we used and optical spectrometer
to determine which proportion of pump and
signal is in the injected beam. |
|
|
73
|
Thu Oct 10 18:03:10 2019 |
Ronic Chiche | Fixed | issue | mechanics | Optical room | First Lock with 2nd satge of amplifier : Motor issue ? | Global locking almost clean : tranmission
and reflection are quite noiseless except
the peaks at every 500ms. |
|
|
72
|
Thu Oct 10 17:51:26 2019 |
Ronic Chiche | Fixed | issue | lasers and optics | detectors and electronics | Optical room | First Lock with 2nd satge of amplifier : Finesse issue ? | 1st lock today with the second stage of
the amplifier.
~ 300mW of injected power (but which |
|
|
71
|
Wed Oct 9 11:41:11 2019 |
Loïc Amoudry | Fixed | info | lasers and optics | Optical room | Onefive spectrum and CVBG spectrum | The Onefive spectrum has shifted a little
bit to lower lambda. It's still enough
for the experiment (3mW injection of ampli |
  |
|
70
|
Wed Oct 9 10:16:24 2019 |
Loïc Amoudry | Fixed | info | lasers and optics | Optical room | Fiber injection and onefive output power | Fiber injection is finished with the new
ThomX stretching CVBG in double pass (+50%
injection power compared to K-BOX CVBG in |
|
|
69
|
Wed Oct 9 10:10:01 2019 |
Loïc Amoudry | Fixed | info | lasers and optics | Optical room | Free Spectral Range (FSR) | FSR is 33.347 MHz @1e-8 mbar
|
|
|
68
|
Wed Oct 9 10:08:24 2019 |
Loïc Amoudry | Fixed | info | lasers and optics | Optical room | Improvement holder amplifier fiber | We've added a clamp in the 3rd stage
to prevent the pump fiber from moving and
tilting (it was tilting to the left). |
 |
|
67
|
Thu Oct 3 18:00:10 2019 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | ThomX amplifier M2 | The ThomX M2 has been measured between
1.5-1.6 for x and y |
|
|
66
|
Thu Oct 3 14:00:13 2019 |
Loïc Amoudry | Fixed | issue | cabling | Optical room | Electrical trouble (disjunction) | The circuit breaker on ThomX cavity drops
@1.5-1.8kW when we turn on 1/2nd
stage of the amplifier or 3rd stage of the |
|
|
65
|
Thu Oct 3 13:53:44 2019 |
Loïc Amoudry | Fixed | report | vacuum | Optical room | Cavity under vacuum | The cavity is right now at 6.5e-8 mbar
(turbo pumps on for 1 night and ionic pumps
for 3h), primary pumps and turbo pumps are |
|
|
64
|
Thu Oct 3 13:49:58 2019 |
Loïc Amoudry | Fixed | info | mechanics | Optical room | Pneumatic valves | Frederic and Manu from vacuum group came
this morning to fix again the pneumatic valves
which had a leak again. |
|
|
63
|
Mon Sep 30 11:30:32 2019 |
Ronic Chiche | Fixed | info | lasers and optics | Optical room | Finesse measurement | To complete these observations:
Finesse has been measured
on thursday, right after cleaning the cavity |
|
|
62
|
Mon Sep 30 11:20:48 2019 |
Loïc Amoudry | Fixed | info | lasers and optics | Optical room | Diffusion ULE spherical mirror (S3) vs Fused Silicate injection planar mirror (P1) | Observation made with IR Beam Viewer:
The observation of P1 and S3 simultaneously
while locking shows much higher diffusion |
|
|
61
|
Fri Sep 27 16:17:36 2019 |
Ronic Chiche | Fixed | info | lasers and optics | Optical room | Finesse measurement | After mirrors were going back from LMA
for cleaning and thermal anealing, they have
been installed in FP cavity for Finesse measurement. |
|
|
60
|
Fri Sep 27 10:43:17 2019 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | New Suprasil mirror from LMA | 19/09/2019 : email from Chrisophe Michel
about AR coating of LMA mirrors after reading
that Ta2O5 layers can be damaged in vacuum |
|
|
59
|
Wed Sep 25 15:49:28 2019 |
Ronic Chiche | Fixed | issue | mechanics | detectors and electronics | Optical room | Motor issue | Today again, same problem with axis 9 blocking
the controlling software during the mirror
alignment procedure. |
|
|
58
|
Thu Sep 12 16:19:26 2019 |
Loïc Amoudry | Fixed | report | mechanics | lasers and optics | Optical room | Cavity dust source check | Several experiments have been done in order
to check the potential source of dust in
the ThomX cavity. For each step, we look |
|
|
57
|
Fri Sep 6 14:59:00 2019 |
Loïc Amoudry | Fixed | info | lasers and optics | Optical room | LMA cleaning technique | Christophe MICHEL told us more precise
informations about spin coater cleaning.
They always clean with pur water |
|
|
56
|
Fri Sep 6 14:48:14 2019 |
Loïc Amoudry | Fixed | report | mechanics | vacuum | Optical room | Primary vacuum to check dust | The cavity has been cleaned then put under
primary vacuum (primary pump without vacuum
flow control). Dusts presence was checked |
 |
|
55
|
Tue Sep 3 18:06:29 2019 |
Loïc Amoudry | Fixed | info | lasers and optics | Optical room | Mirrors sent to LMA | Mirrors have been sent today to LMA for
cleaning and maybe annealing (recuit). 3
ULE of ThomX and the fused silicate for injection |
|
|
54
|
Tue Sep 3 18:04:03 2019 |
Ronic Chiche | Fixed | report | lasers and optics | Optical room | Finesse measurement after mirror cleaning using the spin coater | Following finesse measurements (start @10700):
Clean P1 with SC (water) + isoprop
(wipe) finesse @15000 |
|
|
53
|
Tue Sep 3 17:51:04 2019 |
Ronic Chiche | Fixed | issue | mechanics | lasers and optics | vacuum | Optical room | Vessel cleanliness | looking in the vessel of the FP cavity
using a UV lamp shows a lot of dust... more
dust than outside the cavity !!! |
|
|
52
|
Fri Aug 30 17:52:41 2019 |
Ronic Chiche | Fixed | issue | mechanics | detectors and electronics | Optical room | Motor issue | Today, Axis 9 (Z-axis of P1) has blocked
the software which drives all the motors.
impossible to bypass the problem. |
|
|
51
|
Fri Aug 30 17:46:15 2019 |
Ronic Chiche | Fixed | report | lasers and optics | Optical room | Finesse measurement after mirror cleaning using the spin coater | today I cleaned S3 with isopropanol and
then with pure water on spin coater.
Finesse is only 10 700.(coupling 50% |
|
|
50
|
Fri Aug 30 09:44:56 2019 |
Ronic Chiche | Fixed | report | lasers and optics | Optical room | Finesse measurement after mirror cleaning using the spin coater | Last Finesse measurement in air : ~ 17
000 the 20th of may (see logbook)
28th and 29th of august, we cleanned, |
|
|
49
|
Mon Jul 29 17:15:35 2019 |
Loïc Amoudry | Fixed | info | mechanics | lasers and optics | Optical room | Spin coater air supply removed and front panel changed | Spin coater firstly needed vacuum and air
supply. The air supply being useless for
our experiments, it has been disabled. |
   |
|
48
|
Thu Jul 4 18:30:39 2019 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | 2nd stage output power validated | Onefive output power : 28mW
Power before fiber injection :
7.8mW |
|
|
47
|
Thu Jul 4 18:28:55 2019 |
Loïc Amoudry | Fixed | issue | lasers and optics | Optical room | Onefive 33MHz unmodelocked | Oscillator randomly unmodelocked on 3rd
july afternoon (during oscillator power
measurement, maybe a reflection from the |
|
|
46
|
Thu Jul 4 10:17:46 2019 |
Ronic Chiche | Fixed | info | detectors and electronics | Optical room | New design for PDH boxes | A new design has been studied for the 5
PDH boxes to better match the low (33MHz)
repetition rate of the ThomX laser. |
|
|
43
|
Tue Jun 18 20:44:34 2019 |
Huan Wang | Fixed | info | lasers and optics | Optical room | telescope for Koheras | telescope of Koheras is removed, information
record here:
- distance between collimator edge |
|
|
42
|
Wed Jun 12 17:49:20 2019 |
Loïc Amoudry | Fixed | info | lasers and optics | Optical room | Polarization | Polariztion measured with Input vertically/horizontally polarized
(~100% DOLP)
- Transmission (P4) locked on cavity |
  |
|
41
|
Wed Jun 12 12:07:11 2019 |
Loïc Amoudry | Fixed | report | mechanics | lasers and optics | Other | Amplifier mission Bordeaux | M² mesuré à 10W.
M²x = 1.17
M²y = 1.14 |
 |
|
40
|
Tue Jun 11 18:03:10 2019 |
Loïc Amoudry | Fixed | report | mechanics | lasers and optics | Other | Amplifier mission Bordeaux | Voyage Bordeaux au CELIA avec Jérôme
LHERMITE (Loïc et Titoutan)
1er jour (34°) : |
  |
|
39
|
Thu May 23 17:30:03 2019 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | Transmission of Sapphire mirror | See image. |
|
|
38
|
Thu May 23 10:10:56 2019 |
Ronic Chiche | Fixed | report | lasers and optics | Optical room | Finesse measurement by decay time technique | 5 Files attached:
- Note on the technique and results
for the present cavity on 2019, May 21th |
    |
|
37
|
Tue May 21 17:49:30 2019 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | Finesse after cleaning (new suprasil mirror) | 15/05/19-20/05/19:
Cleaning of the mirrors:
Initial finesse 14000 @air |
|
|
36
|
Tue May 21 17:44:46 2019 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | New Suprasil mirror from LMA | 14/05/19:
New Suprasil mirror received. It
will replace the S-BOX suprasil mirror on |
|
|
35
|
Thu Apr 18 16:17:53 2019 |
Loïc Amoudry | Fixed | issue | lasers and optics | Optical room | 33MHz Onefive power overtime decrease | Power of the 33MHz Onfive decreases over
time. Have to pay attention to that.
Note that air dryers have never been |
  |
|
34
|
Thu Apr 18 16:07:23 2019 |
Loïc Amoudry | Fixed | info | lasers and optics | Optical room | Injection of 33MHz Onefive through fiber | Output power of the Onefive, and power
after injection and different components
have been measured. |
    |
|
33
|
Wed Apr 10 13:11:46 2019 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | Mirror's cleaning and finesse | Summary of what have been cleaned
the last week:
P1 with isopropanol, finesse 11000 |
|
|
32
|
Mon Apr 8 11:55:40 2019 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | P4 cleaned and finesse measurement | P4 cleaned with isopropanol.
Finesse measured afterward: ~=13
000 (clear increase) |
|
|
31
|
Mon Apr 8 10:18:31 2019 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | Finesse after 2days | Finesse measured this morning after P1
SUPRASIL being into the cavity for two
days. In order to check if it's getting |
|
|
30
|
Fri Apr 5 11:28:39 2019 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | Finesse with P1 SUPRASIL | P1 SUPRASIL has been installed instead
of P1 Sapphire. It has been cleaned 3 times
on each face with wipe+isopropanol before |
   |
|
29
|
Fri Apr 5 11:18:47 2019 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | Transmission of the mirrors | P1 transmission out of the mount (means
angle of the mirror is not the real angle):
Pin = 3.2 mW |
|
|
28
|
Thu Apr 4 09:42:12 2019 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | Transmission of the mirrors | After verification, transmission of P1
correspond to ~150ppm.
The 1337ppm come from a beam leakage. |
|
|
27
|
Tue Apr 2 18:05:46 2019 |
Loïc Amoudry | Fixed | info | lasers and optics | Optical room | Beam size at closest spherical mirrors position | S3 and S2 @ +1 640 000 and P1 and P4 @
-825 000
Diameter in x: 4.7mm |
|
|
26
|
Tue Apr 2 18:03:31 2019 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | Transmission of the mirrors | We openned the cavity, removed S2 and measured
trans of P1 and same for S2.
Pin ~= 3.91 mW |
|
|
25
|
Tue Apr 2 17:59:18 2019 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | Finesse after removing wires | 19/04/01: We removed the wires from the
beam path in the cavity. Finesse stayed at
3400. FSR: 33.342 MHz. |
|
|
24
|
Fri Mar 29 18:33:15 2019 |
Ronic Chiche | Fixed | issue | mechanics | lasers and optics | Optical room | Alignment procedure | we did again the complete alignment procedure
starting with iris and optimizing injection
motors Ma and Mb, then installing mirror |
|
|
23
|
Thu Mar 28 09:25:58 2019 |
Loïc Amoudry | Fixed | issue | mechanics | Optical room | Motors Z axis reversed | All Z motors (for P1, S2, S3 and P4) have
been initialized again with a proper HOME
command with their own controller with |
|
|
22
|
Tue Mar 26 18:32:40 2019 |
Loïc Amoudry | Fixed | report | mechanics | lasers and optics | cabling | Optical room | Wires in laser path | There was some ceramic wires close to the
beem path right before P4. We moved them
away (we can imagine they could move again |
 |
|
21
|
Tue Mar 26 18:26:32 2019 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | Check of mirrors and coating directions | Direction of HR face of P1 and P4 have
been checked, there was no problem. The mirrors
are in the good direction and the coating |
|
|
20
|
Fri Mar 22 17:53:10 2019 |
Loïc Amoudry | Fixed | report | lasers and optics | vacuum | Optical room | Cavity at atm pressure | Dry air injected into the cavity.
Lock has been proceeded without
any trouble. ~~4000 finesse. Considered to |
|
|
19
|
Tue Mar 19 17:01:52 2019 |
Loïc Amoudry | Fixed | issue | mechanics | Optical room | Motors Z axis reversed | S2 and S3 z-axis are initially at 1/4 (5mm/20mm) of
there range over ~20mm range. This is meant
to be able to spread them up to ~15mm in |
|
|
18
|
Tue Mar 19 16:35:32 2019 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | Beam size and finesse | FSR initiale : 33.34 MHz (S3 = -825000
et S4 = -825000)
Beam size initiale : wx=2.05mm |
|
|
17
|
Tue Feb 19 15:50:08 2019 |
Loïc Amoudry | Fixed | info | mechanics | Optical room | Motors connexions | Motors are connected. The true mirror's
name are P1 for injection mirrors, S2, S3
and P4. (S=spherical, P=planar). |
|
|
16
|
Thu Feb 14 18:20:52 2019 |
Loïc Amoudry | Fixed | report | mechanics | lasers and optics | Optical room | Basic alignment & alignment motors check | 14/02/19: The 4 motors but Mby control
works. Mby motor home does not bring
it to its "middle" position |
|
|
15
|
Fri Feb 1 14:10:25 2019 |
Loïc Amoudry | Fixed | report | lasers and optics | Other | Mirrors sent to LMA | 30/01/19 - As LMA people came, we discussed
about the spots on ThomX mirrors which should
be clean. As mentionned in "SBOX commissioning", |
|
|
14
|
Fri Feb 1 13:39:21 2019 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | Mirrors checked with binocular microscope | 29/01/19 - ThomX mirrors have also been
checked with binocular microscope. They shown
the same spots as S-BOX mirrors. |
 |
|
13
|
Fri Feb 1 13:20:47 2019 |
Loïc Amoudry | Fixed | report | utilities | Optical room | End of cleaning, plastic fixed on cavity | 08/02/19 - End of the cleaning process. |
 |
|
12
|
Wed Jan 16 14:54:14 2019 |
Loïc Amoudry | Fixed | report | lasers and optics | utilities | Optical room | Cleaning outside IP cavity | From 7th january to 11th january.
|
  |
|
11
|
Fri Dec 21 13:55:09 2018 |
Loïc Amoudry | Fixed | info | vacuum | Optical room | End of vacuum test and cavity ready for cleaning | Vacuum tests finished on 19 december
2018.
Spent last two days to discuss |
   |
|
10
|
Mon Nov 26 15:18:49 2018 |
Ronic Chiche | Fixed | info | vacuum | Optical room | Etuvage cavité THOMX | Mail de Bruno Mercier
du 19/11/2018 :
Une première cavité |
|
|
9
|
Mon Oct 22 11:29:41 2018 |
Ronic Chiche | Fixed | info | mechanics | Optical room | Remontage des vérins | Mail de Yann du 8/10/2018 :
Bonjour,
Tous les vérins sont maintenant |
|
|
8
|
Mon Oct 22 11:27:35 2018 |
Ronic Chiche | Fixed | info | mechanics | Optical room | Remontage mécanique | Mail de Yann du 12/10/2018 :
Je vous fais le bilan des actions
effectuées : |
|
|
7
|
Mon Oct 22 11:03:22 2018 |
Ronic Chiche | Fixed | info | vacuum | Optical room | Détection de fuite | Mail de Bruno Mercier du 18/10/2018 :
Un petit CR
de la journée: |
|
|
6
|
Fri Oct 5 10:17:30 2018 |
Ronic Chiche | Fixed | report | mechanics | cabling | Optical room | test des vérins ISP 20mm et 6mm |
|
|
|
5
|
Wed Oct 3 11:28:46 2018 |
Ronic Chiche | Fixed | report | mechanics | cabling | Optical room | test des vérins ISP 20mm et 6mm | Après avoir utilisé la chaine
: driver ISP - cable ISP DB9 - Feedthrough
enceinte DB9-DB9 - cable perlé DB9-SUB-C |
|
|
4
|
Tue Oct 2 18:00:36 2018 |
Ronic Chiche | Fixed | issue | mechanics | cabling | software | Optical room | test des vérins ISP |
|
|
|
3
|
Tue Oct 2 16:23:54 2018 |
Ronic Chiche | Fixed | issue | mechanics | cabling | software | Optical room | test des vérins ISP | * les vérins de 20mm (axe Z) ont
été testés sur table
grace à une rallonge SUB-C - DB9, |
|
|
2
|
Thu Sep 27 15:43:48 2018 |
Ronic Chiche | Fixed | info | lasers and optics | Optical room | Onefive Origami 33MHz specs - Polarisation | one rotate a lambda/2 before a PBS and
meausure the refected power:
Pmax=35.6 mW |
|
|
1
|
Tue Sep 25 19:17:43 2018 |
Loïc Amoudry | Fixed | info | lasers and optics | Optical room | Onefive Origami 33MHz specs | Power during ~20h, power after turn on,
spectrum image and excel datas, polarisation
and pulse length. |
6x |