Message ID: 91     Entry time: Fri Feb 14 18:02:37 2020
 Author: Loïc Amoudry 
 Status: Fixed 
 Type: report 
 Category: lasers and optics 
 Location: Optical room 
 Title: Telescope for compressors and ThomX 

CVBGs telescope is done with w ~= 1mm. 

ThomX telescope is done with w ~= 2.3mm in x and y.

Newt step is to lock with these short pulses (measured ~2.5ps with FWHM standard deviation interference method).