Entry   Strecher and fiber injection alignment, posted by Ronic Chiche at ThomX igloo about lasers and optics 
    Reply   Strecher and fiber injection alignment, posted by Ronic Chiche at ThomX igloo about lasers and optics Adjustment_SMS.pdf
       Reply   Strecher and fiber injection alignment, posted by Ronic Chiche at ThomX igloo about lasers and optics 
          Reply   Strecher and fiber injection alignment, posted by Ronic Chiche at ThomX igloo about lasers and optics 
             Reply   Strecher and fiber injection alignment, posted by Ronic Chiche at ThomX igloo about lasers and optics D24-02.xls33MHz_power_spectrum_after_double_patch_strecher_CVBG.png
                Reply   Strecher and fiber injection alignment, posted by Ronic Chiche at ThomX igloo about lasers and optics 
                   Reply   Strecher and fiber injection alignment, posted by Ronic Chiche at ThomX igloo about lasers and optics 
                      Reply   Strecher and fiber injection alignment, posted by Ronic Chiche at ThomX igloo about lasers and optics 
                         Reply   Strecher and fiber injection alignment, posted by Ronic Chiche at ThomX igloo about lasers and optics 
                            Reply   Strecher and fiber injection alignment, posted by Ronic Chiche at ThomX igloo about lasers and optics 
                               Reply   Strecher and fiber injection alignment, posted by Ronic Chiche at ThomX igloo about lasers and optics 
          Reply   Strecher and fiber injection alignment, posted by Ronic Chiche at ThomX igloo about lasers and optics 
Message ID: 162     Entry time: Tue Oct 18 17:51:12 2022     In reply to: 161     Reply to this: 163   164
 Author: Ronic Chiche 
 Status: Fixed 
 Type: info 
 Category: lasers and optics 
 Location: ThomX igloo 
 Title: Strecher and fiber injection alignment 

In preparation for tomorrow morning, I did a test with a 45° mount to have a power pickup inside the injection box.

I used the 133MHz laser.
output power measured with the powermeter : 45mW
output power measured with the powermeter + OD2 : 2mW
output power measured with the 45° mount with BB1-E03 mirror with the powermeter + OD2 : 2mW

as expected the BB1-E03 mirrors have a very good reflectance for AOI=45°
the specs give >99% @ 1030nm for both S and P polarizations.

Ronic Chiche wrote:

This morning with Viktor, we started the alignment of the CVBG and fiber.

we did a better alignment of the 2-pass CVBG.
we are able to the see a spot after PBS (after the 2 CVBG pass) which means the alignment is OK even if it can be improved.

then, we started the fiber injection alignment with the 2 last mirrors (7 & 8 on Alphanov documentation).
we saw that if we unswcrew the fiber to play on the focal position, we are able to improve a lot the power in the fiber.
2-3µW with the fiber screwed => 500µW with the fiber unscrewed.
it means the beam is not enough focused.
I will ask Guillaume Machinet his advice when injecting the 33MHz... do we need to replace the long focal lens just after the Isolator ?
and with which value approximatively ?

we played also with the Schafter+Kirchhoff mount of the fiber colimator (see attached documentation).
we loosen the 2 screws around the eccentric key which adjust the focal position + play on this eccentic key + tighten the 2 screws again.
now, we reached 330µW with the fiber properly screwed.

we have to check the available power before the fiber injection but we have very few place to place the powermeter.
maybe with a small mirror ?

 

Ronic Chiche wrote:

Today, after laser was modelocked, we checked the power inside the fiber coming from the Alphanov Strecher box.
it was almost zero, at the nW level.

after doing some very rough alignment, we clearly saw some power (with the powermeter) correlated with the position of mirrors, when turning the alignment knobs.
this is a first step but the output power in the fiber is still very low, about 20nW !

an additionnal 2mm L-shaped hex key is needed to do some walking alignment on the mounts.

 

 