Message ID: 448     Entry time: Thu Aug 7 11:14:47 2025
 Author: Ronic Chiche 
 Status: Fixed 
 Type: info 
 Category: lasers and optics | detectors and electronics 
 Location: ThomX igloo 
 Title: Alignment correction during the summer break 

I restarted the FPC system this morning.

after some classic alignement procedure (some LEFT steps on the cavity injection motors X & Y) and CEP tuning,
I got 92kW for 33% amplifier ratio.

the cavity was not particularely misaligned...

then I did a long run at 90kW with both feedbacks ON without any problem.