HOME SBOX THOMX MINICAV Utilities
THOMX orders THOMX installation THOMX commissioning THOMX control command
  Status of commissioning, report also here plots are reports.  Not logged in ELOG logo
Entry   Restarting equipements after Christmas shutdown, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics | software 
    Reply   Restarting equipements after Christmas shutdown, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics | software 
       Reply   Restarting equipements after Christmas shutdown, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics | software 
          Reply   Restarting equipements after Christmas shutdown, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics | software 
Message ID: 313     Entry time: Tue Jan 16 12:19:35 2024     In reply to: 312
 Author: Ronic Chiche 
 Status: Fixed 
 Type: info 
 Category: lasers and optics | detectors and electronics | software 
 Location: ThomX igloo 
 Title: Restarting equipements after Christmas shutdown 

on last friday (12/01/2024), the IcePap DS issue was solved and I was able to control the FP-cavity motors properly.
I was able to quickly lock either the laser on the FP-cavity and the FP-cavity on the RF reference as before.

then, we can close these posts on restarting the equipments after the Christmas shutdown

Ronic Chiche wrote:

this morning, I set the Ring frequency at 500.25MHz and after switching ON the power supply of the amplifiers for the RF signal coming from the laser,
I saw the beating frequency  (between ring RF and laser harmonic frerquencies at 500.25MHz) that I canceled, playing with the Smaract motor.

Now, I need to adjust the FP-cavity length to follow the laser cavity length but the IcePap DS (controlling the FP-cavity motor) freezes too often and it is almost impossible to make the adjustment.
Kevin sent a GLPI ticket to try to solve this problem.... waiting for IT answer...

Ronic Chiche wrote:

the laser coupled into the amplifier is still measured at ~3mW at the input, on the Alphanov software, once the Amp stage are started at 0% of power ratio.

this afternoon, Kevin restarted the 3rd safety system of ThomX to grant the opening of the beam shutter => now the shutter can be opened.

after adjusting the phase for the PDH system, I was able to find back the laser/CFP lock.

after some minimal alignement, one gets back 50kW for 30.5% of laser amplifier ratio, as before the Christmas shutdown.

I didn't try to lock the FP cavity on the 500MHz RF reference clock as I'm not sure if it has been set to 500.25MHz (as before shutdown) or at 500.1MHz (the future RF frequency) which is very far and will require to move the FP cavity on a long rage.
=> I will ask to Vincent Chaumat to confirm the present RF frequency.

Ronic Chiche wrote:

this morning, I plugged back the 4 power cables which supply all the equipments.

all the equipments have restarted without problem, but the shutter of the laser amplifier needs a ThomX safety system grant to let the beam propagate to the cavity...
and then continue the commissioning of the restart after Christmas shutdown.

 

 

 