HOME SBOX THOMX MINICAV Utilities
THOMX orders THOMX installation THOMX commissioning THOMX control command
  Status of commissioning, report also here plots are reports.  Not logged in ELOG logo
Message ID: 334     Entry time: Tue Apr 2 08:51:21 2024
 Author: Ronic Chiche 
 Status: Fixed 
 Type: info 
 Category: lasers and optics 
 Location: ThomX igloo 
 Title: New multiplication factor for the Fabry-Perot intra-cavity power 

last week, we measured the transmission of a plan mirror from the same batch than the ThomX mirrors and we got ~ 1.75ppm instead of 3ppm which was the calculated value by the LMA.

previously, we put 1/3ppm = 333 333 as multiplication factor.
from today, we will put 1/1.75ppm ~ 570 000 as multiplication factor.

then, previously we got 50kW, now we should get 85.5kW instead in the same conditions.