  Status of commissioning, report also here plots are reports.  Not logged in ELOG logo
Entry   restarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issue, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics | software Capture.JPGCapture2.JPG
    Reply   restarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issue, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics | software Capture.JPG
       Reply   restarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issue, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics | software Sans_titre.png
          Reply   restarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issue, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics | software Capture.JPG
             Reply   restarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issue, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics | software 
                Reply   restarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issue, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics | software 
                   Reply   restarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issue, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics | software 
                      Reply   restarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issue, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics | software 
                         Reply   restarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issue, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics | software 
                            Reply   restarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issue, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics | software 20240906_161926.jpg
                               Reply   restarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issue, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics | software 
Message ID: 354     Entry time: Fri Aug 30 17:59:01 2024     In reply to: 353     Reply to this: 358
 Author: Ronic Chiche 
 Status: Fixed 
 Type: info 
 Category: lasers and optics | detectors and electronics | software 
 Location: ThomX igloo 
 Title: restarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issue 

amplifier power measurement before the compressor CVBG.
we used a mirror in between the amplifier output and the compressor + a 2-mirror periscope to match the powermeter height.

amp ratio (%)          power (W)

0                               0.7
10                             1.65
20                             13
30                             25
40                             37.7
50                             50.5
60                             62
70                             74
80                             86
90                             99
100                          110

we had an alarm @100% of amplifier ratio => the reason is not clear... maybe it's coming from a discrepency between some internal measurement and the expected value.
we checked the power after the alarm => still OK

conclusion, the amplifier seems to be OK... we need to redo the alignment of the compressor CVBG.
 

Ronic Chiche wrote:

After the summer power shutdown, I restarted all the equipements and got quickly ~80kW for 33% amplifier ratio with CEP optimization and without Alignment optimization.

CEP motor position : -506µm

 

Ronic Chiche wrote:

this morning with Daniele, we are measuring the amplifier power just before the FP-cavity.
Casemate temperature @19.5°C

@0% : 205mW
@10%: 755mW
@20%: 7.44W
@30%: 14.3W
@33%:16.3W
@40% : 20.3W
@50% : 24W
@60% : 26W

=> there is a power issue !!!

the normal casemate temperature should be in between 21 and 22°C.
cf this post (https://elog.lal.in2p3.fr/FPC/THOMX+commissioning/133) to get previous amplifier power.

=> it seems we need to redo the compressor CVBG alignment !
first, we will check the amplifier power before the compressor.

Ronic Chiche wrote:

after doing some alignment (walking procedure on the Y axis), and CEP optimization, I got 83kW for 33% on the laser amplifier with a coupling of ~60%

=> we have to check the input power after the amplifier.

I adjusted the FP and laser cavity motors to have a small 33MHz detuning with the RF reference (~10 Hz of beating @ 33MHz)

pb : I don't see the 500MHz beating signal => to be checked

during the motion of the FP-cavity motors, I observed a systematic delock when moving MOT.06 on P1z and no delock with MOT.03 on P4z when I move by 10 steps.
Kevin checked that both IcePap controller have the same configuration and then, the problem is maybe coming from the rust observed on the mechanic.
 

 

Ronic Chiche wrote:

we had to move the laser cavity motor to find the resonances and change a lot the CEP.

the CEP motor is at -524.1µm

we got ~75kW in the FP cavity without alignment but with CEP optimization.

the coupling (the cyan color) is ~ 62% !

=> we need to do some alignment

Ronic Chiche wrote:

I refilled the chiller and the stabilized temperature is @ 25°C

we started the 3rd stage of the Alphanov amplifier at 30% => PD_OUT is fluctuating around 1-1.4W => it's not related to the real output power !

the photodiode connected to the scope CH2 is around 210mV @ 50ohms

we clearly see some small peak on the transmission signal (scope CH1) => we need to optimize the laser cavity length and the CEP

Ronic Chiche wrote:

temperature in the casemate ~ 19.5°C stable

this morning, I measured the power directly at the output of the fiber coupler (through the output fiber), after the strecher : ~5mW
then, I connected the EOM used for the PDH technic : ~2.5mW
then, I connected the fiber of the EOM to the Alphanov amplifier input fiber.

LAL Alphnov software :
PD_IN           = 3.289mW
PD_PULSE   = 33.372MHz

=> nothing to do ! :-)))

I switched ON the preamplifier (3rd stage @ 0%) => PD_Preamp2 = 152.44mW

 

 

 

 

 

 

 