HOME SBOX THOMX MINICAV Utilities
THOMX orders THOMX installation THOMX commissioning THOMX control command
  Status of commissioning, report also here plots are reports.  Not logged in ELOG logo
Message ID: 65     Entry time: Thu Oct 3 13:53:44 2019
 Author: Loïc Amoudry 
 Status: Fixed 
 Type: report 
 Category: vacuum 
 Location: Optical room 
 Title: Cavity under vacuum  

The cavity is right now at 6.5e-8 mbar (turbo pumps on for 1 night and ionic pumps for 3h), primary pumps and turbo pumps are cut, ionic pump are on and the pressure level is still going down. 
Therefore there aren't any big leak in the cavity and we can expect a final vacuum level close to e-9 mbar.

ELOG V3.1.4-395e101