Entry   Power shut down on Saturday the 18th, posted by Ronic Chiche at ThomX igloo about utilities 
    Reply   Power shut down on Saturday the 18th, posted by Ronic Chiche at ThomX igloo about utilities 
Message ID: 201     Entry time: Mon Mar 20 17:39:28 2023     In reply to: 199
 Author: Ronic Chiche 
 Status: Fixed 
 Type: info 
 Category: utilities 
 Location: ThomX igloo 
 Title: Power shut down on Saturday the 18th 

Today, I restarted all the equipements :

Chiller                                                 : ok, temperature converged quickly to the set temperature : 25°C
Cavity mirrors motors controller         : I had to configure the general network as 192.168.xxx.xxx in order to operate the software designed by Didier Jehanno
Computer                                           : ok, now, it IP address is 192.168.1.1
Laser amplifier controller                    : I had a LOT of issues in restarting the LAL software. I had to restart several times the amplifier controller in order to access it by software. I quickly check the power increase to 50% after it has been correctly seeded
CW oscillator                                     : ok, Koheras restarted without any issue.
OneFive oscillator                             : the power ON was ok but it did not modelock. I tried several gently knocks on the case but without success (one clearly see the effect on the scope, the oscillator "tries" to modelock).
                                                            fortunately, after about 1h, the oscillator modelocked alone (check with Buddy fiber photodiode + scope).... the power is the same as before. the Alphanov software measures 5.4mW (it was 5.5 mW the 2/1/2023)

Smaract controller for OneFive        : ok, I changed its IP address to 192.168.1.10. I tested the PC control in moving forth and back the "CEP" motor by 1mm... the OneFive was still modelocked.
 

Ronic Chiche wrote:

All the equipments have been switched off on Friday 17th due to a power shut down on Saturday 18th :
CW and Onefive oscillators, computers, laser amplifier, cavity mirror motors, chiller, etc...

 