this morning, I try to find a new region for MOT.03 and MOT.06 where we can move them without unlocking the cavity.
I started from the position:
MOT06 : ~ -785 000
MOT03 : ~ -200 000
and I do -10 000 steps (dz = 10k x 6nm = 60µm) at a time on both motors.
previously a good region for MOT.06 was -900 000 !
I moved also the laser cavity by 40µm to cancel the beating with the RF frequency.
MOT06 : ~ -795 000
MOT03 : ~ -191 000
Max power after optimazing the CEP ~ 65kW => I need to realign => 78kW
I need to increase the D parameter on the PID to compensate the (85kW / 78kW ratio).
I changed the MOT.03 and MOT.06 speed to 30steps/s => it seems a bit better.
but I still see some lock losses during a move.
.... to be continued...
|