HOME SBOX THOMX MINICAV Utilities
THOMX orders THOMX installation THOMX commissioning THOMX control command
  Status of commissioning, report also here plots are reports.  Not logged in ELOG logo
Entry   Power shut down on September 23th, posted by Ronic Chiche at ThomX igloo about mechanics | lasers and optics | vacuum | detectors and electronics | cabling | software | utilities 
    Reply   Power shut down on September 23th, posted by Ronic Chiche at ThomX igloo about mechanics | lasers and optics | vacuum | detectors and electronics | cabling | software | utilities 
       Reply   Power shut down on September 23th, posted by Ronic Chiche at ThomX igloo about mechanics | lasers and optics | vacuum | detectors and electronics | cabling | software | utilities 
          Reply   Power shut down on September 23th, posted by Ronic Chiche at ThomX igloo about mechanics | lasers and optics | vacuum | detectors and electronics | cabling | software | utilities img1.jpg
Message ID: 454     Entry time: Fri Sep 26 11:08:21 2025     In reply to: 453     Reply to this: 455
 Author: Ronic Chiche 
 Status: Fixed 
 Type: info 
 Category: mechanics | lasers and optics | vacuum | detectors and electronics | cabling | software | utilities 
 Location: ThomX igloo 
 Title: Power shut down on September 23th 

this morning, I restarted all the equipments of the FPC.

everything was fine after being able to get back the correct PDH phase between modulation and demodulation...I got 88kW with 33% amplifier ratio after basic alignment and CEP tuning.

the Pico1 server used for the X-ray photodiode TMD.01 doesn't want to start...
I tried with Astor. the server start to run (red => blue => green colors)
but when I start the Jive panel, it gets down again (red color)... to be solved

Ronic Chiche wrote:

to anticipate the power shut down on next tuesday 23/09,
this afternoon, I switched off all the equipments except the oscillator connected on the UPS.

 