HOME SBOX THOMX MINICAV Utilities
THOMX orders THOMX installation THOMX commissioning THOMX control command
  Status of commissioning, report also here plots are reports.  Not logged in ELOG logo
Entry   Christmas shutdown, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics | software 
    Reply   Christmas shutdown, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics | software 
Message ID: 307     Entry time: Fri Dec 22 09:46:18 2023     Reply to this: 308
 Author: Ronic Chiche 
 Status: Fixed 
 Type: info 
 Category: lasers and optics | detectors and electronics | software 
 Location: ThomX igloo 
 Title: Christmas shutdown 

this morning, I shut off all the equipements (especially the computer) except the ones powered by the UPS : laser controller, laser peltier controller, laser motors controller.
and I disconnected the cables from the power plugs of the wall (to prevent any possible overvoltage).

Jean-Noël Cayla will need to shut off the electrical shelf (the one powering the UPS) during the afternoon, I will check at this moment if the laser controller is still properly powered thanks to the UPS.

ELOG V3.1.4-395e101