  Status of commissioning, report also here plots are reports.  Not logged in ELOG logo
Message ID: 444     Entry time: Tue Jul 15 17:34:13 2025
 Author: Ronic Chiche 
 Status: Under Process 
 Type: info 
 Category: lasers and optics 
 Location: ThomX igloo 
 Title: Stability test Without and with  

The laser starts at 93 KW.

This morning I operated the laser locked with the RF for 1h30 without any delock. All the machine was switch off.

All the system was very stable. Sometimes the 20 Hz perturbation was visible but no delocking.

In the afternoon I switched ON just the kikers and septum (with the Kikers delay of not giving perturbation for the synchro -8.561) and I do the same thing => The situation is exactely the same, all the system is very stable (but 20 Hz perturbations). NO deloking during 1h.

I change the delay between Kikers to -7.561 => exactely the same situation, all is very stable!!!!

In 3h of synchronized operation, NO delock at all with or without Kikers!!!

Conclusion no effect at all when juste pulsed element are switched ON.

Daniele