Entry   33MHz laser SN2439 back to Orsay, posted by Ronic Chiche at Optical room about lasers and optics Capture.PNG
    Reply   33MHz laser SN2439 back to Orsay, posted by Ronic Chiche at Optical room about lasers and optics 
       Reply   33MHz laser SN2439 back to Orsay, posted by Ronic Chiche at Optical room about lasers and optics Stick-Slip_Positioners_Mechanical_and_Electrical_Interface_Data_Sheet.pdf
          Reply   33MHz laser SN2439 back to Orsay, posted by Ronic Chiche at Optical room about lasers and optics 
             Reply   33MHz laser SN2439 back to Orsay, posted by Ronic Chiche at Optical room about lasers and optics 
                Reply   33MHz laser SN2439 back to Orsay, posted by Ronic Chiche at Optical room about lasers and optics IMG_20221013_095839.jpg
                   Reply   33MHz laser SN2439 back to Orsay, posted by Ronic Chiche at Optical room about lasers and optics MCS_Network_Interface_Configuration_Guide-1.pdf20230320_154643[1].jpg
Message ID: 157     Entry time: Fri Oct 7 17:47:39 2022     In reply to: 156     Reply to this: 158
 Author: Ronic Chiche 
 Status: Fixed 
 Type: info 
 Category: lasers and optics 
 Location: Optical room 
 Title: 33MHz laser SN2439 back to Orsay 

Today, we used an "ELI-NP" Smaract controller made with these 2 references :
MCS-3CC-ETH-TAB (SN 2271) => main controller
MCS-3S-EP-SDS15-TAB (SN 2472) => sensor module

with the ethernet parameters:
IP : 10.0.52.226
MASK: 255.255.255.0
GW : 10.0.52.01
PORT : 5001

one has to configure the device into PTC or MCS software as :
network:10.0.52.226:5001

then, one can access the Smaract controller and move both Frep and CEP stages.
we succeded to make the laser modelock again ! :-)
the output power is about 42mW !

Ronic Chiche wrote:

Yesterday with Aurélien, we try to make the laser modelock using the Smaract translation stages embedded inside the laser head.

unfortunately, we got some errors when we try to do the "calibration" and "reference" of both Smaract stages !
we contacted by email M. Nicoul to help us on this topic

Today, we removed the 33MHz and its controller and motors controller from the casemate to install it in the PLIC room.

with the help of M. Nicoul, we did a first check of the PZT capacitance of each stage (~ 60nF)
for channel 0 (Frep), the measured capacitance is 53nF on the laser head
for channel 2 (CEP), the measured capacitance is 63nF on the laser head
between pins 1 and 9 of the DB9 connector.

M. Nicoul says that these values are compatible with the reference values ~ 60nF, then the PZT translation stages are OK.
Then, the controler is maybe damaged.
One has to find a new one to test the stages.

 

Ronic Chiche wrote:

This morning, with Aurélien and Daniele, we did the swap between the 33MHz and 133MHz oscillators.

now, the 33MHz oscillator is on ThomX inside the casemate.
it has been restarted and some laser is going out.
it has been screwed on the metal plate, roughly aligned with the Alphanov "fiber injection and strecher" box.
tomorrow, we will do the fine alignment with this box and check if the laser is properly modelocking.

the 133MHz oscillator is back in the PLIC optical room.
it has been restarted and some laser is going out.
it seems there are no pulses at the output... it seems we have to trigger the modelock.

Ronic Chiche wrote:

On the 8th of July, the SN2439 33MHz laser was returned from NKT to our lab, being repaired.

it stayed all the weekend to warm up in the optical room and has been turned on on Monday.

the mode-locking was not working (28mW output power and a CW line for the optical spectrum), thus I "kicked" the laser with 100µm moves on the motors.

now, the laser is mode-locked with 42mW output power and the expected optical spectrum.
 

 

 

 