HOME SBOX THOMX MINICAV Utilities
THOMX orders THOMX installation THOMX commissioning THOMX control command
  Status of commissioning, report also here plots are reports.  Not logged in ELOG logo
Message ID: 152     Entry time: Wed Jun 15 15:18:57 2022
 Author: Ronic Chiche 
 Status: Fixed 
 Type: info 
 Category: lasers and optics 
 Location: ThomX igloo 
 Title: mirrors removing 

This morning with Viktor, we opened the 2 vessels and removed the 4 FP-cavity mirrors.

all the mirrors have been put in plastic boxes with labels to indicate which mirror it is,

and with all the HR coatings face down.

the mirrors are in the PLIC room in the "THOMX MIRRORS" box.

ELOG V3.1.4-395e101