|
this morning, I shut off all the equipements (especially the computer) except the ones powered by the UPS : laser controller, laser peltier controller, laser motors controller.
and I disconnected the cables from the power plugs of the wall (to prevent any possible overvoltage).
Jean-Noël Cayla will need to shut off the electrical shelf (the one powering the UPS) during the afternoon, I will check at this moment if the laser controller is still properly powered thanks to the UPS.
|