  464   Mon Feb 2 15:29:45 2026 Ronic ChicheUnder Processinfolasers and opticsThomX iglooLaser Amplifier used at 70%today, I installed a laser dump just before
the telescope to avoid any high power (50W
instead of 17W usually) issue in the injection
 img1.jpg 
  463   Mon Dec 8 11:17:17 2025 Ronic ChicheUnder Processissuelasers and optics | detectors and electronicsThomX iglooHigh frequency noiseThis morning, I installed a high-voltage
probe (1:1000) on the AC-line to see if one
could detect a correlation between lock losses
 AC-line.png 
  462   Wed Dec 3 16:23:40 2025 Ronic ChicheFixedreportlasers and optics | detectors and electronicsThomX iglooNoise issueyesterday, in the same conditions, we had
so many locking issues... exactly
in the same way than before. :-(
 Screenshot_2025-12-03_15-36-59.png 
  461   Mon Dec 1 18:03:29 2025 Ronic ChicheFixedreportlasers and optics | detectors and electronicsThomX iglooNoise issuesince several days, we see that the locking
is more and more unstable and the lock duration
was sometime less than 20-30 seconds !
 2025-12-01_-_long_run_few_delocks.png 
  460   Tue Oct 28 17:31:47 2025 Ronic ChicheUnder Processissuelasers and optics | detectors and electronicsThomX iglooHigh frequency noisewe did some tests with Marie to make some
vibrations on the door.
below, I exhibit some pictures of
 Accelerometer_on_door_wo_noise.pngAccelerometer_on_door_with_few_noise.pngAccelerometer_on_door_with_few_noise2.png 
  459   Tue Oct 28 10:07:48 2025 Ronic ChicheUnder Processissuelasers and optics | detectors and electronicsThomX iglooHigh frequency noiseAfter this observation, we did a test with
Daniele to try to correlate the road traffic
in front of the Igloo with the lock losses
  
  458   Wed Oct 1 10:14:12 2025 Ronic ChicheUnder Processissuelasers and optics | detectors and electronicsThomX iglooHigh frequency noiseAt the end of the day, we found out what
was the origin of this noise : some road
renovation work with jackhammer and road
  
  457   Tue Sep 30 15:17:30 2025 Ronic ChicheUnder Processissuelasers and optics | detectors and electronicsThomX iglooHigh frequency noiseToday, the lock of the FPC was particularly
bad (maybe the worst ever seen), with a lot
of high frequency noise.
  
  456   Mon Sep 29 10:22:32 2025 Ronic ChicheFixedinfomechanics | lasers and optics | vacuum | detectors and electronics | cabling | software | utilitiesThomX iglooPower shut down on September 23thThis morning I did a phase alignment on
the PDH signal generator (Rigol DG4102)
this procedure ensure that both phases
 img1.jpg 
  455   Fri Sep 26 11:13:35 2025 Ronic ChicheFixedinfomechanics | lasers and optics | vacuum | detectors and electronics | cabling | software | utilitiesThomX iglooPower shut down on September 23ththe 33MHz/500MHz RF frequencies from the
Ring seems different from the previous state
(maybe working at an energy of 50MeV instead
  
  454   Fri Sep 26 11:08:21 2025 Ronic ChicheFixedinfomechanics | lasers and optics | vacuum | detectors and electronics | cabling | software | utilitiesThomX iglooPower shut down on September 23ththis morning, I restarted all the equipments
of the FPC.

everything was fine after being
  
  453   Thu Sep 18 18:29:04 2025 Ronic ChicheFixedinfomechanics | lasers and optics | vacuum | detectors and electronics | cabling | software | utilitiesThomX iglooPower shut down on September 23thto anticipate the power shut down on next
tuesday 23/09,
this afternoon, I switched off all
  
  452   Tue Sep 16 17:41:28 2025 Ronic ChicheFixedinfomechanics | lasers and optics | detectors and electronicsThomX iglooAccelerometer measurementwith Daniele, we placed the accelerometer
on top of the fiber amplifier box which is
inside the housing.
 Capture.JPG 
  451   Tue Sep 16 12:32:52 2025 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX igloopolarization measurement of the FP cavity beamtoday, with Daniele, we did a simple polarization
measurement in transmission of the FP cavity
beam.
  
  450   Thu Aug 28 18:01:46 2025 Ronic ChicheFixedinfodetectors and electronicsThomX iglooPower shut down on August 29thafter alignment, CEP adjustment and optimizing
the PDH phase, I got back ~92kW in the FPC
for 33% amplifier ratio.
  
  449   Wed Aug 27 12:01:41 2025 Ronic ChicheFixedinfodetectors and electronicsThomX iglooPower shut down on August 29thThis morning, all the equipments have been
switched off due to a power shut down
tomorrow morning.
  
  448   Thu Aug 7 11:14:47 2025 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX iglooAlignment correction during the summer breakI restarted the FPC system this morning.

after some classic alignement procedure
(some LEFT steps on the cavity injection
  
  447   Fri Jul 18 15:56:40 2025 Ronic ChicheUnder Processinfolasers and opticsThomX igloolaser operation again with machine OFFThe laser start at 33% with 92 KW optimized
and

P=0.03
  
  446   Fri Jul 18 09:23:40 2025 Ronic ChicheUnder Processinfolasers and opticsThomX iglooXrays experiment with prostateToday we do XRays for experiment.

The laser start to 33% at 93 KW
but Pgain = 0.033
  
  445   Wed Jul 16 17:17:57 2025 Ronic ChicheUnder Processinfolasers and opticsThomX iglooSuite tests stabilitéWe continue to find what gives high freq.
perturbation.

The laser starts at 92 KW it is
  
  444   Tue Jul 15 17:34:13 2025 Ronic ChicheUnder Processinfolasers and opticsThomX iglooStability test Without and with The laser starts at 93 KW.

This morning I operated the laser
locked with the RF for 1h30 without any delock.
  
  443   Fri Jul 11 16:15:12 2025 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX iglooTuning of the slow feeback loop analog BW + fast feedback loop gain + PIDToday with Daniele, we tuned the potentiometer
after the Laselock which drives the analog
BW of the PID on the laser PZT,
  
  442   Thu Jul 10 18:33:48 2025 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX iglooNew recipies with additionnal attenuation before the diffuser and new x3 amplifier on laser PZTWith optical attenuation + x3 amplifier
on laser PZT channel + feedback tuning

Temporary recipie
  
  441   Thu Jul 10 18:02:54 2025 Ronic ChicheFixedinfodetectors and electronicsThomX igloolaser PZT amplifierthis afternoon, I added the Gain = 2.8
amplifier at the output of the Laselock to
drive the laser PZT.
  
  440   Thu Jul 10 15:44:43 2025 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX igloolong run to test the appearance of high frequency noisetoday, long run directly at full power
(33% amplifier ratio) => 98kW in the FPC
at the very begining of the run.
 2025-07-10_-_long_run.png 
  439   Wed Jul 9 18:11:59 2025 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX igloolong run to test the appearance of high frequency noiseToday with Daniele, we did 6 long runs
at different power (23kW, 46kW, 66kW, 73kW,
92kW, 92kW)
 long_run_with_different_FPC_power.png 
  438   Wed Jul 9 17:20:01 2025 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX iglooNew recipies with additionnal attenuation before the diffuserWith optical attenuation
only

For ~ 92kW power in the
  
  437   Wed Jul 9 16:27:18 2025 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX igloooptical attenuator added on the diffuser + new PID parametersToday we did several long runs (~1h each)
at ~23kW, 46kW, 66kW with different PID parameters
which seems better.
  
  436   Wed Jul 9 14:12:54 2025 Ronic ChicheFixedinfolasers and opticsThomX iglooRecipies for different FPC power

For ~ 66kW power in the
FP-cavity:
  
  435   Tue Jul 8 18:48:51 2025 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productionlong run today at relatively
nominal power (~90kW) with double loop
(FPC + RF) between 13:30am and 6:30pm
 2025-07-08_-_long_run.png 
  434   Tue Jul 8 18:45:17 2025 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productionlong run yesterday at relatively low power
(~23kW) with double loop (FPC + RF) between
10am and 6pm
 2025-07-07_-_long_run.png 
  433   Tue Jul 1 17:31:41 2025 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productionWe had a long run without any lock loss
during ~1h with the 23kW recipie in the morning.
during the afternoon, we had some
  
  432   Tue Jul 1 12:13:18 2025 Ronic ChicheFixedinfolasers and opticsThomX iglooRecipies for different FPC powerFor ~ 23kW power in the FP-cavity:


Alplhanov amplifier ratio
: 15%
  
  431   Thu Jun 26 12:37:22 2025 Ronic ChicheFixedinfolasers and opticsThomX iglooRecipies for different FPC powerFor ~ 46kW power in the FP-cavity:


Alplhanov amplifier ratio
: 20%
  
  430   Wed Jun 25 18:48:28 2025 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productionNew locking parameters (I got 98kW for
33% amp ratio) :

Axis 18 position : +0009420
  
  429   Wed Jun 25 09:57:56 2025 Ronic ChicheUnder Processissuemechanics | lasers and optics | vacuum | detectors and electronicsThomX iglooPossible causes for the noise in the FP-cavity system4.3 - Vibrations of the mirror mounts due
to temperature related to cavity power (the
electrons machine is OFF)
 long_run_wihtout_lock_loss.pnglong_run_wihtout_lock_loss_with_optimum_CEP.png 
  428   Wed Jun 25 09:43:36 2025 Ronic ChicheFixedinfolasers and opticsThomX iglooNew power record in ThomX cavityyesterday, we were able to store more than
98kW in the FP cavity, always with the same
parameter : 33% laser amplifier ratio
 img1(3).jpg 
  427   Wed Jun 11 18:59:34 2025 Ronic ChicheUnder Processissuemechanics | lasers and optics | vacuum | detectors and electronicsThomX iglooPossible causes for the noise in the FP-cavity systemlist of possible causes of the high frequency
noise which makes the system loosing the
lock => to be checked.
  
  426   Wed Jun 11 11:35:22 2025 Ronic ChicheFixedinfolasers and optics | detectors and electronics | softwareThomX igloo33MHz phase adjustmentthe 33MHz beating signal (phase) is used
to start and stop automatically the lock
on the 500MHz beating signal.
  
  425   Wed May 14 09:50:52 2025 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productionToday, I removed the NKT oscillator from
the bunker to put it in the PLIC room.

I locked the FP cavity and obtained
  
  424   Tue May 6 10:58:18 2025 Ronic ChicheUnder Processreportlasers and opticsThomX iglooair conditionning in ThomX BunkerI finally got 93-94kW for 33% amp ratio.

I had to move the FP-cavity length
to compensate the temperature change in the
  
  423   Tue May 6 09:29:43 2025 Ronic ChicheUnder Processreportlasers and opticsThomX iglooair conditionning in ThomX Bunkerafter the new temperature setting for the
bunker air cooling (winter to summer transition),
the temperature drop from 24° to 20°C
 Sans_titre.png 
  422   Fri May 2 10:05:43 2025 Ronic ChicheUnder Processreportlasers and opticsThomX iglooair conditionning in ThomX BunkerThe temperature slitly increase in thomx
Bunker from 23° to 24° during the
last day.
 temp.png 
  421   Tue Apr 29 09:26:08 2025 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productiontoday, after 1 week of vacation, I was
able to easily lock the cavity with 92kW
with 33% amp ratio without too much optimizations
  
  420   Mon Mar 31 18:19:30 2025 Ronic ChicheFixedinfolasers and opticsThomX iglooNew power record in ThomX cavitytoday, we were able
to store more than 97kW in the FP cavity,
always with the same parameter : 33% laser
 20250331_181029.jpg 
  419   Mon Mar 31 17:12:56 2025 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productiontoday, the alignment of FP cavity was so
bad that I tuned the 01 mode by error (CEP
and alignment)...  insead of the 00
  
  418   Tue Mar 18 11:45:21 2025 Ronic ChicheFixedinfolasers and opticsThomX iglooNew power record in ThomX cavitytoday, we were able to store more than
95kW in the FP cavity, always with the same
parameter : 33% laser amplifier ratio
 img1(2).jpg 
  417   Tue Mar 18 11:25:07 2025 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productionthis morning, the cavity was pretty misaligned
=> basic alignment in y direction helps
a lot => 93kW for 33% amp ratio.
  
  416   Wed Mar 5 15:08:38 2025 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX iglooElectrons-Photons phase stability measurementthe phase between the 500Mhz ring RF oscillator
and the electrons is measured on a BPM and
is very stable after 2-3ms (<< 6ps,
  
  415   Wed Mar 5 13:17:26 2025 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX iglooElectrons-Photons phase stability measurementwe installed a measurement at the IP with
the BPM for ion cleaning for electrons and
we used a fast photodiode at the output of
 img1(1).jpg 
  414   Tue Mar 4 14:54:31 2025 Ronic ChicheFixedinfomechanics | softwareThomX iglooNew direction for cavity motorsfrom now on, one reverts the FP cavity
motors direction to compensate the long drift
from the begining of the project.
  
  413   Fri Feb 21 19:52:57 2025 Ronic ChicheFixedinfomechanics | lasers and optics | detectors and electronics | softwareThomX iglooGood Xrays production trendthis afternoon, we succeeded to get a quite
long Xray production trend around 15-20 minutes
with a flux above 25k on i1.
 img1(1).jpg 
  412   Fri Feb 21 19:40:50 2025 Ronic ChicheFixedissuesoftwareThomX igloostrange drift (new effect !?!)today, we had a strange effect :
both the laser and the FP cavity were
locked on the RF frequency (500.10045 MHz),
  
  411   Fri Feb 21 10:13:03 2025 Ronic ChicheUnder Processinfomechanics | lasers and optics | detectors and electronicsThomX igloocorrelations between accelerometer and lock losses @ 20Hzfor this 20Hz oscillation, could it be
a natural resonance of the optical table
placed on its feet ?
  
  410   Thu Feb 20 12:36:19 2025 Ronic ChicheFixedinfolasers and opticsThomX iglooNew power record in ThomX cavitytoday, we were able
to store more than 94kW in the FP cavity,
always with the same parameter : 33% laser
 img1.jpg 
  409   Wed Feb 19 10:35:06 2025 Ronic ChicheUnder Processinfomechanics | lasers and optics | detectors and electronicsThomX igloocorrelations between accelerometer and lock losses @ 20HzI installed the accelerometer on the ground
close to one feet of the FP cavity hexapod
(see picture) and restarted the acquisition
 img1.jpgCapture.JPGCapture.JPGCapture.JPG 
  408   Wed Feb 19 09:28:12 2025 Ronic ChicheUnder Processinfomechanics | lasers and optics | detectors and electronicsThomX igloocorrelations between accelerometer and lock losses @ 20Hzlong term pk-pk measurement of the accelerometer
(placed on the optical cavity table, on the
marble part close to the laser oscillator)
 Capture.JPG 
  407   Tue Feb 18 19:33:27 2025 Ronic ChicheUnder Processinfomechanics | lasers and optics | detectors and electronicsThomX igloocorrelations between accelerometer and lock losses @ 20Hzhere is the same kind of measurement (pk-pk
of 1 sec of acquisition) done on the laser
PZT when the FP is at 90kW.
 Capture.JPG 
  406   Tue Feb 18 17:36:25 2025 Ronic ChicheUnder Processinfomechanics | lasers and optics | detectors and electronicsThomX igloocorrelations between accelerometer and lock losses @ 20Hzhere is the acquisition from 10:30am to
5:30pm

11k point in 7h => 1.57k points
 Capture.JPG 
  405   Tue Feb 18 10:40:55 2025 Ronic ChicheUnder Processinfomechanics | lasers and optics | detectors and electronicsThomX igloocorrelations between accelerometer and lock losses @ 20Hzhere is the pk-pk measurement of the accelerometer
during the whole night.
the recording started at 5pm yesterday
 Capture.JPG 
  404   Mon Feb 17 17:37:27 2025 Ronic ChicheUnder Processinfomechanics | lasers and optics | detectors and electronicsThomX igloocorrelations between accelerometer and lock losses @ 20Hzone possible source for this acoustic noise
was the vibrations coming from the water
cooling of the dipoles which is normally
  
  403   Mon Feb 17 12:12:02 2025 Ronic ChicheFixedinfolasers and opticsThomX iglooNew power record in ThomX cavitytoday, we were able to store more than
93kW in the FP cavity, always with the same
parameter : 33% laser amplifier ratio
 img1.jpg 
  402   Mon Feb 17 10:48:00 2025 Ronic ChicheUnder Processinfomechanics | lasers and optics | detectors and electronicsThomX igloocorrelations between accelerometer and lock losses @ 20Hznew plots, with the accelerometer placed
directly on the optical cavity table (on
the marble part), close to the oscillator.
 7x 
  401   Mon Feb 17 09:52:21 2025 Ronic ChicheUnder Processinfomechanics | lasers and optics | detectors and electronicsThomX igloocorrelations between accelerometer and lock losses @ 20Hzthis morning, I did some new plots with
the accelerometer placed on the top of the
case of the OneFive laser.
 6x 
  400   Fri Feb 14 19:08:09 2025 Ronic ChicheUnder Processinfomechanics | lasers and optics | detectors and electronicsThomX igloocorrelations between accelerometer and lock losses @ 20Hzat the end of the day, I moved the accelerometer
from the top of the cavity vessel to the
top case of the Onefive laser.
  
  399   Fri Feb 14 10:58:48 2025 Ronic ChicheUnder Processinfomechanics | lasers and optics | detectors and electronicsThomX igloocorrelations between accelerometer and lock losses @ 20Hzthen, I moved the accelerometer on top
of the "X-hutch side" vessel, placed
directly on the metal top case, inside the
 8x 
  398   Fri Feb 14 10:11:00 2025 Ronic ChicheUnder Processinfomechanics | lasers and optics | detectors and electronicsThomX igloocorrelations between accelerometer and lock losses @ 20Hzthis morning, I did some measurement with
nobody interfering with the tests.

- the "no noise" image
 No_noise.JPGSlaping_door.JPGNoise1.JPGNoise2.JPGNoise3.JPG 
  397   Tue Feb 11 10:55:21 2025 Ronic ChicheUnder Processinfomechanics | lasers and optics | detectors and electronicsThomX igloocorrelations between accelerometer and lock losses @ 20Hztoday I connected a copy of the laser PZT
signal to the 2nd scope CH2 (with AC coupling
to remove the DC offset) to be able to monitor
  
  396   Fri Feb 7 15:35:37 2025 Ronic ChicheUnder Processinfomechanics | lasers and optics | detectors and electronicsThomX igloocorrelations between accelerometer and lock losses @ 20HzI installed an accelerometer setup in the
bunker.
presently, the accelerometer is placed
 Capture1.JPGCapture.JPG 
  395   Thu Feb 6 10:29:36 2025 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productionthis morning, I restarted the lock of the
CFP after almost 2 weeks without operation.
after quick alignment and CEP tuning,
  
  394   Thu Jan 23 17:55:41 2025 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productiontoday we did x-rays => we got 41 000
pA at maximum and 90kW in the FPC for 33%
amplifier ratio.
  
  393   Wed Jan 22 15:32:53 2025 Ronic ChicheFixedinfomechanics | lasers and optics | vacuumThomX igloocorrelations between vacuum gauges and lock losses @ 20Hzthe machine people saw a correlation between
BPM jumps and vacuum gauges peaks related
to breakdowns in the beam pipe.
  
  392   Wed Jan 8 16:08:59 2025 Ronic ChicheUnder Processinfolasers and optics | detectors and electronics | cablingThomX iglooCEM noise measurementsThis afternoon, we started almost all the
parts of the machine with Vincent and Nicolas,
and we didn't see any change in the Loop
  
  391   Wed Jan 8 12:24:48 2025 Ronic ChicheUnder Processinfolasers and optics | detectors and electronics | cablingThomX iglooCEM noise measurementsThe goal of these measurements is to check
if one can find some correlation between
the CFP lock losses observed during a run
 Without_Noise_@_20Hz.pngWith_Noise_@_20Hz.pngDelock_@_20Hz.pngVoice_noise_@400Hz.png 
  390   Tue Jan 7 10:18:08 2025 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productionthis morning, I restarted the cavity after
the Christmas shutdown.
everything went fine.
  
  389   Tue Dec 17 16:28:32 2024 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productionthis morning, Kevin reduced the steering
current in the IcePap controllers of the
FP cavity motors.
  
  388   Thu Dec 12 18:28:02 2024 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productionmajor result of the day: X-ray vertical
scan by moving the hexapod

abscise : hexapod position
 Capture.JPG 
  387   Wed Dec 11 18:51:35 2024 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productionThis morning, I added an amplifier on the
33MHz beating signal in between the mixer+LPF
and the scope/Laselock.
 Capture.JPG 
  386   Wed Dec 4 17:53:49 2024 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productionlast thing we tried :

we removed the threshold on the
FPC/RF error signal.
  
  385   Wed Dec 4 17:11:50 2024 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productionwe observed that :

- the MOT.03 motor always exhibits
some perturbations on the transmitted, reflected
 20241204_125955.jpg 
  384   Wed Dec 4 12:26:03 2024 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productiontoday with Alice, we planned to do a long
run with ~80kW in the FPC to check if the
lock problems are coming from the interaction
  
  383   Tue Nov 26 18:00:14 2024 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productionat the begining of the day, we started
to get ~81kW in the FPC for 33% amplifier
ratio and after ~1h, we got 84kW after CEP
 Capture.JPG 
  382   Fri Nov 22 10:23:33 2024 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productionthe RF frequency changed from 500.1003MHz
to 500.0913MHz => it reduced by 9kHz @
500MHz which is equivalent to 600Hz @ 33MHz
  
  381   Wed Nov 20 18:55:37 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX iglooChecking the amplifier powerthis afternoon, we put back the 1/4 and
1/2 waveplates and after a long alignment/angle
tuning/CEP optimization process, we hardly
  
  380   Wed Nov 20 12:42:11 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX iglooChecking the amplifier powerI put back and aligned the 1/2 waveplate
only and I get 71kW max after its optimization
and optimizing the CEP and alignment (without
  
  379   Wed Nov 20 12:00:47 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX iglooChecking the amplifier powerwe did a long term run (25 mn) with the
powermeter located at the FPC position at
33% amplifier ratio.
  
  378   Wed Nov 20 11:28:01 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX iglooChecking the amplifier powerthis morning, with Daniele, we checked
the amplifier power, right after the CVBG
(the power meter has to be placed on a metal
  
  377   Tue Nov 19 17:37:55 2024 Ronic ChicheUnder Processinfolasers and optics | softwareThomX iglooOptimizing lock parameters for stable X-ray productionthe RF frequency is now 500.1003MHz which
is equivalent (if divided by 15) to 33.34002MHz.

the frequency has to be changed
  
  376   Fri Nov 8 15:23:11 2024 Ronic ChicheUnder Processinfolasers and optics | softwareThomX iglooOptimizing lock parameters for stable X-ray productionthis morning, I did some walking procedure
and CEP alignment to get ~80kW in the FPC
with 33% amplifier ratio.
  
  375   Wed Oct 23 12:23:10 2024 Ronic ChicheUnder Processinfolasers and optics | softwareThomX iglooOptimizing lock parameters for stable X-ray productionthis morning, I did some walking procedure
and I got 82kW in the FPC with 33% amplifier
ratio (after CEP optimization too).
  
  374   Tue Oct 22 18:58:56 2024 Ronic ChicheUnder Processinfolasers and optics | softwareThomX iglooOptimizing lock parameters for stable X-ray productionToday, after setting the locking parameters,
I got 80kW in the FPC for 33% amplifier ratio
after CEP tuning (Smaract CH2 ~ -423.5µm)
  
  373   Tue Oct 22 18:52:40 2024 Ronic ChicheFixedissuelasers and opticsThomX iglooOnefive 33MHz modelock lossFor the modulation/demodulation generator
for the PDH signal,
after a power shutdown, on can :
  
  372   Mon Oct 21 09:20:47 2024 Ronic ChicheFixedissuelasers and opticsThomX iglooOnefive 33MHz modelock lossAfter the new Yvette flooding of the last
week and the consecutive AC-shut down, I
restarted this morning the laser with the
  
  371   Tue Oct 15 09:33:15 2024 Ronic ChicheFixedissuelasers and opticsThomX iglooOnefive 33MHz modelock lossThis morning, I verified the reason why
the seeder frequency was not displayed on
the amplifier software screen:
  
  370   Mon Oct 14 10:21:17 2024 Ronic ChicheFixedissuelasers and opticsThomX iglooOnefive 33MHz modelock lossOn Friday 11th of October, due to the Yvette
flooding, all the AC power of ThomX have
been shut down.
  
  369   Wed Oct 9 18:39:34 2024 Ronic ChicheUnder Processinfolasers and optics | softwareThomX iglooOptimizing lock parameters for stable X-ray productionThis afternoon, we scanned the optical
table vertically with the hexapod in asynchronous
mode to find its optimum position, looking
  
  368   Wed Oct 9 09:56:21 2024 Ronic ChicheUnder Processinfolasers and optics | softwareThomX iglooOptimizing lock parameters for stable X-ray productionThis morning, I wanted to test quickly
if the Smaract motors can be used in open
loop instead of closed loop or in piezo scan.
  
  367   Tue Oct 8 11:59:27 2024 Fatematuj JohoraUnder Processreportlasers and opticsOptical roomCharacterizing Focus Tunable LensYesterday Ronic and I worked on the high
laser power measurements with the Vertical
set-up of the Focus Tunable Lens. We went
 Updates_of_Focus_Tunable_lenses.pdf 
  366   Thu Oct 3 16:38:03 2024 Ronic ChicheUnder Processinfolasers and optics | softwareThomX iglooOptimizing lock parameters for stable X-ray productionToday with Daniele and Alice, we operated
to cavity.
we obtained 84kW for 33% of amplifier
  
  365   Tue Sep 17 13:04:32 2024 Ronic ChicheUnder Processinfolasers and optics | softwareThomX iglooOptimizing lock parameters for stable X-ray productionhere are the (good) lock parameters used
this morning.

for the RF/FPC lock, the 33MHz
 Capture.JPG 
  364   Tue Sep 17 12:48:13 2024 Ronic ChicheFixedinfomechanicsThomX iglooFinding correct motors position and parameters to keep the lock during a movethis morning with Daniele, we did a quite
long run with this motor position and it
seems we don't lose the lock too much.
  
  363   Mon Sep 16 12:03:30 2024 Ronic ChicheFixedinfomechanicsThomX iglooFinding correct motors position and parameters to keep the lock during a movethis morning, I try
to find a new region for MOT.03 and MOT.06
where we can move them without unlocking
  
  362   Mon Sep 9 11:00:43 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronics | softwareThomX igloorestarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issuethis morning, with Vincent :

- we added the 10Hz trigger to
the CH2 on the remote scope (192.168.229.21)
  
  361   Fri Sep 6 17:27:20 2024 Ronic ChicheUnder Processissuemechanics | lasers and optics | detectors and electronicsThomX igloo20Hz oscillation in the locking between Laser and FP-cavitycould it be possible this 20Hz oscillations
comes from anouncements in the bunker, puting
the housing+table in vibration ?
  
  360   Fri Sep 6 17:21:51 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronics | softwareThomX igloorestarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issueI changed a little bit the locking parameters
(see picture) for the RF/FPC loop and it
locked rapidely.
 20240906_161926.jpg 
  359   Fri Sep 6 15:20:20 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronics | softwareThomX igloorestarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issuenow, the Ring RF frequency is set to 500.067MHz.

so the CFP/laser frequency should
be 500.067MHz/15 = 33.3378MHz.
  
  358   Fri Sep 6 12:10:51 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronics | softwareThomX igloorestarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issueafter redoing the alignment of the CVBG,
we got back the initial power in the FPC
(87kW)
  
  357   Fri Sep 6 11:56:53 2024 Ronic ChicheFixedissuelasers and optics | detectors and electronicsThomX igloofixing CVBG issuethis morning with Daniele, we realigned
the amplifier beam axis on the iris position.
it was pretty fast an easy => we
 20240906_151100.jpg 
  356   Thu Sep 5 09:53:10 2024 Ronic ChicheFixedissuelasers and optics | detectors and electronicsThomX igloofixing CVBG issue1) this morning, I aligned to CFP to get
back 82kW in the cavity for 33% of amplifier
ratio.
 12x 
  355   Thu Sep 5 09:51:22 2024 Ronic ChicheFixedissuelasers and optics | detectors and electronicsThomX igloofixing CVBG issuethe CVBG of the compressor module seems
to have an issue.

here is the plan of the work :
  
  354   Fri Aug 30 17:59:01 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronics | softwareThomX igloorestarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issueamplifier power measurement before the
compressor CVBG.
we used a mirror in between the amplifier
  
  353   Fri Aug 30 12:05:38 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronics | softwareThomX igloorestarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issueAfter the summer power shutdown, I restarted
all the equipements and got quickly ~80kW
for 33% amplifier ratio with CEP optimization
  
  352   Fri Aug 30 10:50:45 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronics | softwareThomX igloorestarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issuethis morning with Daniele, we are measuring
the amplifier power just before the FP-cavity.
Casemate temperature @19.5°C
  
  351   Tue Aug 27 12:31:19 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronics | softwareThomX igloorestarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issueafter doing some alignment (walking procedure
on the Y axis), and CEP optimization, I got
83kW for 33% on the laser amplifier with
 Capture.JPG 
  350   Tue Aug 27 11:33:24 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronics | softwareThomX igloorestarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issuewe had to move the laser cavity motor to
find the resonances and change a lot the
CEP.
 Sans_titre.png 
  349   Tue Aug 27 10:19:08 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronics | softwareThomX igloorestarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issueI refilled the chiller and the stabilized
temperature is @ 25°C

we started the 3rd stage of the
 Capture.JPG 
  348   Tue Aug 27 09:59:18 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronics | softwareThomX igloorestarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issuetemperature in the casemate ~ 19.5°C
stable

this morning, I measured the power
 Capture.JPGCapture2.JPG 
  347   Tue Jul 23 09:37:24 2024 Ronic ChicheFixedissuelasers and opticsThomX iglooAlphanov amplifier issuepicture of the connectors used to carry
signals between the amplifier pump module
and the rack under the table.
 connecteur_laser_head_sur_module_pompes_ampli.jpgconnecteur_laser_head_sur_chassis_ampli.jpg 
  346   Mon Jul 22 09:54:24 2024 Ronic ChicheFixedissuelasers and opticsThomX iglooAlphanov amplifier issueGuillaume and Julien Bour from Alphanov
will come on wednesday 24/07 to have a first
look and check the amplifier.
  
  345   Wed Jun 19 09:14:14 2024 Ronic ChicheFixedissuelasers and opticsThomX iglooAlphanov amplifier issuethe present situation is :

Guillaume asked me to disconnect
the "Laser head" cable from the
  
  344   Wed Jun 19 09:07:56 2024 Ronic ChicheFixedinfosoftwareThomX iglooNew password for login on the ThomX computerthe previous password has expired.

the new access from the computer
:
  
  343   Thu Jun 6 09:17:02 2024 Ronic ChicheFixedissuelasers and opticsThomX iglooAlphanov amplifier issueFYI : to access special menus on the Alphanov
software,

login : "Administrator"
  
  342   Fri May 31 18:12:59 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX iglooFP-cavity lock survey during the Linac section changing operationtoday with Daniele, we disconnected the
EOM to increase the injected power of the
amplifier, we were at 4.8mW but we still
  
  341   Tue May 28 15:05:46 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX iglooFP-cavity lock survey during the Linac section changing operationtoday, I tried to restart the amplifier
at 0% (without 3rd stage) but it didn't
start... still the same error message.
  
  340   Tue May 14 10:37:41 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX iglooFP-cavity lock survey during the Linac section changing operationthe air temperature is between 21°C
and 22°C.

I tried to lock the cavity but
 Capture.JPG 
  339   Tue May 14 09:20:27 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX iglooFP-cavity lock survey during the Linac section changing operationYesterday, the ThomX water circuit should
have been repared,
and yesterday aftenoon, Daniele restarted
  
  338   Thu Apr 25 09:09:49 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX iglooFP-cavity lock survey during the Linac section changing operation

this morning, the chiller was in
error and I had to restart it.
  
  337   Thu Apr 11 09:58:10 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX iglooFP-cavity lock survey during the Linac section changing operationthis morning, the computer was restarted
and I had to launch all the applications.
no problem except the powermeter for
 Capture.JPG 
  336   Tue Apr 9 09:38:18 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX iglooFP-cavity lock survey during the Linac section changing operationthis morning, I had to restart the chiller.
Temp Amp 1 is at 27.5°C after having
started the amplifier at 33% ratio.
  
  335   Tue Apr 2 09:19:31 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX iglooFP-cavity lock survey during the Linac section changing operationfrom now on, the transmission factor for
calculating the FP intra cavity power is
1/1.75ppm ~ 570 000 (changed in the Powermeter
  
  334   Tue Apr 2 08:51:21 2024 Ronic ChicheFixedinfolasers and opticsThomX iglooNew multiplication factor for the Fabry-Perot intra-cavity powerlast week, we measured the transmission
of a plan mirror from the same batch than
the ThomX mirrors and we got ~ 1.75ppm instead
  
  333   Tue Mar 26 10:20:54 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX iglooFP-cavity lock survey during the Linac section changing operationThis morning, I locked again the FP-cavity
at more than 50kW with 33% of laser amplifier
ratio.
  
  332   Tue Mar 19 13:01:22 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX iglooFP-cavity lock survey during the Linac section changing operationThis morning with Daniele, we operated
the FP-cavity to be sure there is no issue
due to the Linac section changing operation
  
  331   Tue Mar 5 11:20:43 2024 Ronic ChicheFixedinfosoftwareThomX igloocorrect parameters for locking the FP-cavitythis morning, I finished the FP-cavity
alignment with the new ring RF frequency.
I get back 50kW @ 33% amplifier ratio.
 Correct_lock_parameters.png 
  330   Mon Mar 4 18:32:21 2024 Ronic ChicheFixedinfomechanics | lasers and opticsThomX iglooLaser and FP cavities frequency adjustmentThis afternoon, I did the 2nd half of the
travel: dF @ 33MHz = 0Hz
=> the Smaract motor position is
  
  329   Mon Mar 4 12:39:56 2024 Ronic ChicheFixedinfomechanics | lasers and opticsThomX iglooLaser and FP cavities frequency adjustmentat the beginning of the procedure, the
frequency gap between the new Ring 33MHz
frequency (33.3378MHz) and the laser/FP cavities
  
  328   Mon Mar 4 09:32:06 2024 Ronic ChicheFixedinfosoftwareThomX igloocorrect parameters for locking the FP-cavitythis morning I solved the problem of the
33MHz frequency beating which should be ~12kHz
between the generator (at the new frequency
  
  327   Fri Mar 1 18:38:17 2024 Ronic ChicheFixedinfosoftwareThomX igloocorrect parameters for locking the FP-cavityToday, we restarted the FP-cavity locking,
after 3 weeks without using it.
those 3 weeks have been used to set
 good_parameters.png 
  326   Fri Feb 9 18:00:05 2024 Ronic ChicheUnder Processissuemechanics | lasers and optics | detectors and electronicsThomX igloo20Hz oscillation in the locking between Laser and FP-cavitymeasure to be done next week to check the
20Hz noise on the laser amplifier signal:

- install a DET10 in reflection
  
  325   Fri Feb 9 15:49:39 2024 Ronic ChicheUnder Processissuemechanics | lasers and optics | detectors and electronicsThomX igloo20Hz oscillation in the locking between Laser and FP-cavitywhat does this 10ps phase jitter mean in
term of cavity length variations ?

L = L0 + dL sin(2pi fm t) = L0
  
  324   Fri Feb 9 09:50:45 2024 Ronic ChicheUnder Processissuemechanics | lasers and optics | detectors and electronicsThomX igloo20Hz oscillation in the locking between Laser and FP-cavityyesterday I did 2 tests to try to understand
the origin of the 20Hz oscillation which
is dominant in the remaining 10-20ps rms
 20240208_133745.jpg20240208_140636.jpg 
  323   Wed Feb 7 18:33:42 2024 Ronic ChicheFixedinfodetectors and electronicsOptical roomlock oscillateur 33MHz - synthé 500MHzThis morning with Daniele, we changed the
laser/RF locking scheme :

1) we use the laser 33MHz internal
  
  322   Fri Feb 2 11:53:40 2024 Ronic ChicheFixedinfomechanics | lasers and opticsThomX iglooLaser cavity temperature/pressure sensitivitythis morning, I did a 500MHz beating frequency
(Laser vs RF) drift test with the Smaract
motors configured with "Sensor Mode"
 Capture.JPG 
  321   Thu Feb 1 17:23:23 2024 Ronic ChicheFixedinfodetectors and electronicsThomX igloolockingduring the last days we changed the FP-cavity
- RF reference locking system to force the
right bucket:
 Capture.JPGCapture.JPG 
  320   Fri Jan 26 13:04:56 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX igloo33MHz (FP-cavity vs RF) phase stability today, I locked the laser on the
FP-cavity and the FP-cavity on the RF reference
with 47kW inside the FP-cavity.
  
  319   Fri Jan 26 11:05:27 2024 Ronic ChicheFixedinfomechanics | lasers and optics | cablingThomX igloocontroller M1 & M4 (plan mirrors) with IcePap controllersat the begining of each session, it will
be mandatory to avoid any backlash for the
motors :
  
  318   Thu Jan 25 13:36:35 2024 Ronic ChicheFixedinfodetectors and electronicsThomX iglooFirst stable X-rays productionthis morning, we locked the laser on the
FP-cavity with about 48-49kW stable in the
FP-cavity (for 32% of amplifier ratio).
  
  317   Thu Jan 25 12:45:41 2024 Ronic ChicheFixedinfomechanics | lasers and optics | cablingThomX igloocontroller M1 & M4 (plan mirrors) with IcePap controllersthis double motors scheme works good.

if motor P4 is used by increasing
value, the FP-cavityPZT signal (pink signal
  
  316   Thu Jan 25 10:15:28 2024 Ronic ChicheFixedinfomechanics | lasers and optics | cablingThomX igloocontroller M1 & M4 (plan mirrors) with IcePap controllerspreviously, we have connected motor M4
with an IcePap controller.
see this post : https://elog.lal.in2p3.fr/FPC/THOMX+commissioning/278
  
  315   Fri Jan 19 18:05:42 2024 Ronic ChicheFixedinfodetectors and electronicsThomX iglooAdding one photodiode in reflectionthis morning, I added a DET36 photodiode
in reflection (I used a thin beam splitter)
to better measure the coupling over the full
  
  314   Tue Jan 16 12:26:12 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX igloo33MHz (FP-cavity vs RF) phase stabilitythis morning, with Vincent Chaumat, we
made a beating (phase detection) between
the laser 33MHz and the 33MHz coming from
  
  313   Tue Jan 16 12:19:35 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronics | softwareThomX iglooRestarting equipements after Christmas shutdownon last friday (12/01/2024), the IcePap
DS issue was solved and I was able to control
the FP-cavity motors properly.
  
  312   Thu Jan 11 13:42:16 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronics | softwareThomX iglooRestarting equipements after Christmas shutdownthis morning, I set the Ring frequency
at 500.25MHz and after switching ON the power
supply of the amplifiers for the RF signal
  
  311   Wed Jan 10 18:43:03 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronics | softwareThomX iglooRestarting equipements after Christmas shutdownthe laser coupled into the amplifier is
still measured at ~3mW at the input, on the
Alphanov software, once the Amp stage are
  
  310   Wed Jan 10 15:21:46 2024 Ronic ChicheUnder Processinfolasers and opticsThomX iglooVariable focal lens validationwe plan to use Electrically Tunable Lenses
EL-10-30-C NIR to build the ThomX telescope
but they need to be compatible with the powerful
 Optotune_EL-10-30.pdfJOSAB.8.000337.pdf 
  309   Wed Jan 10 14:52:22 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronics | softwareThomX iglooRestarting equipements after Christmas shutdownthis morning, I plugged back the 4 power
cables which supply all the equipments.

all the equipments have restarted
  
  308   Fri Dec 22 16:13:27 2023 Ronic ChicheFixedinfolasers and optics | detectors and electronics | softwareThomX iglooChristmas shutdownthis afternoon, I checked visually what
happens when the AC power of the UPS is broken
down => the laser controller has still
  
  307   Fri Dec 22 09:46:18 2023 Ronic ChicheFixedinfolasers and optics | detectors and electronics | softwareThomX iglooChristmas shutdownthis morning, I shut off all the equipements
(especially the computer) except the ones
powered by the UPS : laser controller, laser
  
  306   Mon Dec 11 17:21:32 2023 Ronic ChicheFixedissuemechanics | lasers and optics | detectors and electronicsThomX iglooTemperature control of the FP-cavity lengthtoday with Fatematuj, we did a long-term
frequency drift measurement between the FP-cavity
loaded with 50kW and the RF reference frequency...
 frequency_drift.png 
  305   Fri Dec 8 12:21:25 2023 Ronic ChicheFixedinfolasers and opticsThomX iglooStrecher and fiber injection alignmenttoday, the Alphanov amplifier stopped because
of the too low injected power : ~2.5mW (measured
by the Alphanov software)
  
  304   Thu Dec 7 14:59:02 2023 Ronic ChicheFixedissuemechanics | lasers and optics | detectors and electronicsThomX iglooTemperature control of the FP-cavity lengthon last tuesday, I did a long-term measurement
of the frequency drift when the heating cable
is powered ON at 20V (2x 10V) @ t=0mn.
 untitled.png 
  303   Thu Dec 7 09:09:27 2023 Ronic ChicheFixedinfolasers and opticsThomX iglooNew mirrors batch informationsthe 2 files describe the specfications
for the16  mirrors ordered (4 for ThomX
+ spare, 4 for SBOX + spare) and the measurements
 miroirs_puma_2022_thomx_Kbox.docxMiroirs_à_1031_nm-ThomX_-_KBox_Mars_2023.pdf 
  302   Mon Dec 4 10:45:50 2023 Ronic ChicheFixedissuemechanics | lasers and optics | detectors and electronicsThomX iglooTemperature control of the FP-cavity lengthlast friday, I locked the cavity and then,
switched ON the heating cable after waiting
the cavity reaches a steady state in frequency
 2023_12_01_temp_freq.png 
  301   Thu Nov 30 15:53:10 2023 Ronic ChicheFixedissuemechanics | lasers and optics | detectors and electronicsThomX iglooTemperature control of the FP-cavity lengththis afternoon, I started the heating cable after
the warm-up of the FP-cavity :

14h20 : start to fill 50kW
 Screenshot_2023-11-30_15-48-05.png 
  300   Thu Nov 30 12:33:08 2023 Ronic ChicheFixedinfolasers and opticsThomX iglooFP-cavity inside power sensitivitythis morning I monitored the frequency
shift between the FP-cavity frequency (the
laser is locked on it) and the RF reference
 FP-cavity_freq.pngScreenshot_2023-11-30_12-30-23.png 
  299   Wed Nov 29 16:39:16 2023 Ronic ChicheFixedinfomechanics | lasers and optics | detectors and electronicsThomX iglooLong term lock of Laser-FP cavity-RF referencethis afternoon, we did a new long-term
"double lock" run w/o any single
lock loss during 1/2h.
 Screenshot_2023-11-29_15-25-37.pngScreenshot_2023-11-29_15-44-27.png 
  298   Wed Nov 29 12:33:33 2023 Ronic ChicheFixedinfomechanics | lasers and optics | detectors and electronicsThomX iglooLong term lock of Laser-FP cavity-RF referencetoday, I did a 20 minutes "double
lock" run w/o any single lock loss.

the attached file shows the recorded
 Screenshot_2023-11-29_12-04-09.png 
  297   Wed Nov 29 12:20:18 2023 Ronic ChicheFixedissuemechanics | lasers and optics | detectors and electronicsThomX iglooTemperature control of the FP-cavity lengthtoday, I removed one of the DC voltage
supply (as with 30V, we are already able
to 30°C on the heating cable).
  
  296   Wed Nov 29 09:35:10 2023 Ronic ChicheFixedinfomechanics | lasers and opticsThomX iglooLaser cavity temperature/pressure sensitivitylong-term correlation, over 5-6 days, between
the temperature measured in the bunker, outside
of the housing (blue curve) and the temperature
 Screenshot_2023-11-29_09-27-56.png 
  295   Tue Nov 28 19:01:19 2023 Ronic ChicheFixedinfomechanics | lasers and optics | detectors and electronicsThomX iglooLong term lock of Laser-FP cavity-RF referencetoday for the first time, we were able
to make a long term lock of all the elements
(Laser on FP cavity and FP-cavity on RF reference)
  
  294   Tue Nov 28 18:38:16 2023 Ronic ChicheFixedissuemechanics | lasers and optics | detectors and electronicsThomX iglooTemperature control of the FP-cavity lengthseveral days ago, we installed a heating
cable around the output flange (close to
the X-hutch) of the FP-cavity vessel.
  
  293   Tue Nov 28 11:32:17 2023 Ronic ChicheFixedinfomechanics | detectors and electronicsThomX iglooSmaract motors parameters and controllercurrent Smaract motors parameters : 
- Closed loop Max frequency : 5000
- Signal Amplitude threshold : 2047
  
  292   Tue Nov 28 10:24:47 2023 Ronic ChicheFixedinfomechanics | lasers and opticsThomX iglooLaser cavity temperature/pressure sensitivitytoday, I swapped the 500MHz RF reference
oscillator for a Siglent 500MHz DDS oscillator.

see the attached plot : the
 Screenshot_2023-11-28_10-21-33.png 
  291   Fri Nov 24 18:47:25 2023 Ronic ChicheFixedinfomechanics | lasers and opticsThomX iglooLaser cavity temperature/pressure sensitivitythe last thing we did with Daniele, is
to start/stop the airflow on top of the housing
(closed) to see a possible pressure effect
 Screenshot_2023-11-24_18-24-43.pngScreenshot_2023-11-24_17-18-09.pngScreenshot_2023-11-24_18-37-35.png 
  290   Fri Nov 24 18:16:37 2023 Ronic ChicheFixedinfomechanics | lasers and opticsThomX iglooLaser cavity temperature/pressure sensitivityNow, I placed a temperature probe stuck on
the laser housing itself.

fig. 1
 temp_freq.pngScreenshot_2023-11-24_16-47-37.pngScreenshot_2023-11-24_16-48-02.png 
  289   Fri Nov 24 12:56:39 2023 Ronic ChicheFixedinfomechanics | lasers and opticsThomX iglooLaser cavity temperature/pressure sensitivitylaser cavity :

when one decreases the laser motor
position, the laser repetition rate
 Screenshot_2023-11-24_11-44-53.pngprobe_temp.png 
  288   Thu Nov 23 12:26:26 2023 Ronic ChicheFixedissuelasers and opticsThomX iglooTemperature control of the Laser length with the inside Peltier

bunker temperature @ 22.5°C

today, Sebastien Pitrel improved
  
  287   Thu Nov 23 12:25:07 2023 Ronic ChicheFixedissuemechanics | lasers and optics | detectors and electronicsThomX iglooTemperature control of the FP-cavity lengthas the CFP motors displacements induce
a cavity unlock, we try to change the cavity
length by changing the temperature of elment
  
  285   Fri Nov 17 11:44:35 2023 Ronic ChicheFixedinfomechanics | lasers and optics | detectors and electronicsThomX iglooLaser / FP-cavity "day by day" lockingtemperature @ 21.9°C

48.5kW inside CFP for 30% amplifier
ratio
 Screenshot_2023-11-17_11-37-50.png 
  284   Thu Nov 16 17:48:29 2023 Ronic ChicheFixedinfomechanics | lasers and optics | detectors and electronicsThomX iglooLaser / FP-cavity "day by day" lockingtemperature @ 22.3°C

today, all the PC applications
were closed except the web browser.
  
  283   Wed Nov 15 09:36:35 2023 Ronic ChicheFixedreportdetectors and electronicsThomX igloobunker temperature curve   2023-11-10_to_2023-11-15_-_temperature_curve.png 
  282   Tue Nov 14 11:33:45 2023 Ronic ChicheFixedreportmechanics | lasers and opticsThomX iglooM4 motor using icepap controller and jive/Atkpanel IHMone problem is the FP-cavity/laser lock
loss when one moves a FP-cavity motor.

with acceleration = 0.01 units/s²
  
  281   Tue Nov 14 10:51:57 2023 Ronic ChicheFixedinfomechanics | lasers and optics | detectors and electronicsThomX iglooRing frequency / Laser "day by day" lockingtemperature stable around 21.7°C

today, the equivalent Smaract position
corresponding to the 500.25MHz ring frequency
  
  280   Tue Nov 14 10:35:16 2023 Ronic ChicheFixedinfomechanics | lasers and optics | detectors and electronicsThomX iglooLaser / FP-cavity "day by day" lockingtemperature since we moved to temperature
probe (jump at the beginning of the plot)
below the ring on a metallic base.
 courbe_temperature_jeudi9-mardi14.png 
  279   Fri Nov 10 12:37:42 2023 Ronic ChicheFixedinfomechanics | lasers and optics | detectors and electronicsThomX iglooLaser / FP-cavity "day by day" lockingas the temperature is back to a normal
value ~ 20.8°C, the injected power to
the amplifier (PD_IN in the Alphanov software)
  
  278   Fri Nov 10 09:51:22 2023 Ronic ChicheFixedreportmechanics | lasers and opticsThomX iglooM4 motor using icepap controller and jive/Atkpanel IHMKevin moved the M4 mirror controller from
the ISP controller to some ICEPAP controller.

the IHM to access this ICEPAP controller
  
  277   Fri Nov 10 09:43:26 2023 Ronic ChicheFixedinfomechanics | lasers and optics | detectors and electronicsThomX iglooRing frequency / Laser "day by day" lockingtemperature stable around 20.8°C

today, the equivalent Smaract position
corresponding to the 500.25MHz ring frequency
 untitled.jpgCapture1.PNG 
  276   Thu Nov 9 17:02:26 2023 Ronic ChicheFixedinfomechanics | lasers and optics | detectors and electronicsThomX iglooLaser / FP-cavity "day by day" lockingtoday, we locked the FP cavity at ~50kW
with 30% laser amplifier ratio (16W) during
almost all the day (from 10am to 4pm)
  
  275   Thu Nov 9 16:40:16 2023 Ronic ChicheFixedinfomechanics | lasers and optics | detectors and electronicsThomX iglooRing frequency / Laser "day by day" lockingtoday, the equivalent Smaract position
corresponding to the 500.25MHz ring frequency
is +156µm on MCS-1/ch0 (closed loop
  
  274   Wed Nov 8 18:52:44 2023 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX igloosome changes in the feedback schemefrom several weeks, the maximum power stored
in the FP-cavity was ~ 5kW.

today with Daniele, we finished
 Capture.PNG20231108_154711.jpg 
  273   Wed Nov 8 17:51:30 2023 Ronic ChicheFixedissuemechanics | lasers and opticsThomX igloo!!! strange amplifier beam pointing fluctuations !!!we confirmed the effect of the bunker temperature
on the laser amplifier "beam pointing"
fluctuations.
  
  272   Tue Nov 7 14:09:25 2023 Ronic ChicheFixedinfolasers and opticsThomX iglooStrecher and fiber injection alignmentToday, the power measured at the input
of the amplifier (PD_IN on the LAL amplifier
software) is 2.5mW instead of >3mW generally
  
  271   Mon Oct 9 13:11:23 2023 Daniele NutarelliFixedinfolasers and opticsThomX iglooTests of pointing stability of the laser CFPLast monday with Victor we have cheked
the stability of de pointing of the laser
FP.
 IMG_20231003_155009_resized_20231009_103610100.jpgIMG_20231003_155458_resized_20231009_103610449.jpg 
  270   Fri Sep 22 11:30:28 2023 Daniele NutarelliFixedreportlasers and opticsOptical roomLaser FP operationThis morning FP Laser was operating well
locked at 30 KWatts in stable vay.

There are some fluctuations due
 IMG_20230922_105006_resized_20230922_111612040.jpg 
  269   Thu Sep 21 18:56:56 2023 Ronic ChicheFixedissuemechanics | lasers and opticsThomX igloo!!! strange amplifier beam pointing fluctuations !!!this morning, I locked the cavity to ~25kW
without any problem.

but this afternoon, the reflected
  
  268   Wed Sep 20 19:17:44 2023 Ronic ChicheFixedinfodetectors and electronicsOptical roomlock oscillateur 33MHz - synthé 500MHzafter a sudden FP-cavity Finesse increase,
we had to install the Fast Feedback Loop
in order to continue to lock the cavity.
  
  267   Wed Sep 20 19:12:16 2023 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX iglooFast feedback loop between laser and FP cavityI copy the post about Fast Feedback loop
: https://elog.lal.in2p3.fr/FPC/THOMX+commissioning/265

This morning,
  
  266   Wed Sep 20 19:10:16 2023 Ronic ChicheFixedissuemechanics | lasers and optics | detectors and electronicsThomX igloo!!! strange FP cavity behavior => impossible to lock !!!this afternoon, in adjusting the CEP and
improving the parameters of the lock, I was
able to get ~ 47kW stable inside the cavity,
  
  265   Wed Sep 20 14:16:09 2023 Ronic ChicheFixedissuemechanics | lasers and optics | detectors and electronicsThomX igloo!!! strange FP cavity behavior => impossible to lock !!!This morning,

- I installed the fast feedback
loop.
 20230920_131634.jpg20230920_131559.jpg 
  264   Mon Sep 18 17:12:07 2023 Ronic ChicheFixedissuemechanics | lasers and optics | detectors and electronicsThomX igloo!!! strange FP cavity behavior => impossible to lock !!!it could be also an optical unstability,
as when the intra-cavity power increases,
the radius of curvatures of the mirrors increases
  
  263   Mon Sep 18 12:48:39 2023 Ronic ChicheFixedissuemechanics | lasers and optics | detectors and electronicsThomX igloo!!! strange FP cavity behavior => impossible to lock !!!this morning, we tried:

- to move a bit the arm of the
L-shape off the beam axis (in case of it
  
  262   Fri Sep 15 19:13:44 2023 Ronic ChicheFixedinfolasers and opticsThomX igloodrift calculation for the SMA100Athe goal is to estimate what could be the
frequency drift at 500MHz for the SMA100A:
see phase noise datasheet in attachement
 Capture1.PNGCapture2.PNG 
  261   Fri Sep 15 18:56:36 2023 Ronic ChicheFixedissuemechanics | lasers and optics | detectors and electronicsThomX igloo!!! strange FP cavity behavior => impossible to lock !!!suddenly, BEFORE switching the HV amplifier
ON and BEFORE connecting it to the EOM (in
order to explore the HV effect on the EOM
 20230915_172239.jpg 
  260   Fri Sep 15 18:27:24 2023 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX iglooFast feedback loop between laser and FP cavitythis afternoon, we tried to better understand
how to drive properly the EOM to kill high
frequency noise.
  
  259   Fri Sep 15 18:11:07 2023 Ronic ChicheUnder Processissuemechanics | lasers and optics | detectors and electronicsThomX igloo20Hz oscillation in the locking between Laser and FP-cavitythis afternoon, we did 2 tests to better
understand this 20Hz oscillation:

- we locked the amplified laser
  
  258   Fri Sep 15 18:00:41 2023 Ronic ChicheUnder Processissuemechanics | lasers and optics | detectors and electronicsThomX igloo20Hz oscillation in the locking between Laser and FP-cavitythis morning, we tried to find the origin
of the 20Hz oscillation.

- we switched OFF the laser Smaract
  
  257   Thu Sep 14 19:16:44 2023 Ronic ChicheFixedinfodetectors and electronicsOptical roomlock oscillateur 33MHz - synthé 500MHzthis afternoon, we were able to lock the
laser on the FP-cavity and the FP-cavity
on the Ring reference oscillator in a same
  
  256   Wed Sep 13 18:33:50 2023 Ronic ChicheFixedinfodetectors and electronicsOptical roomlock oscillateur 33MHz - synthé 500MHzthis afternoon, I firstly connected the
HV output of the Laselock to the FP-cavity
PZT : https://elog.lal.in2p3.fr/FPC/THOMX+commissioning/248
  
  248   Wed Sep 13 17:57:08 2023 Ronic ChicheFixedissuelasers and optics | detectors and electronicsThomX igloowork with HV voltage on the LaselockThis afternoon, I connected the HV output
of the Laselock (instead of the standard
0-10V output) to the FP-cavity PZT to increase
  
  255   Wed Sep 13 12:24:14 2023 Ronic ChicheFixedinfodetectors and electronicsOptical roomlock oscillateur 33MHz - synthé 500MHzthis morning, I added a Thorlabs lowpass
filter at 1kHz after the mixer and a resistor
at the Laselock output to the FP-cavity PZT.
 20230913_114202.jpg 
  254   Tue Sep 12 17:58:41 2023 Ronic ChicheFixedinfodetectors and electronicsOptical roomlock oscillateur 33MHz - synthé 500MHzthis afternoon, I tried to lock the FP-cavity
on a local 500MHz synthesizer as a frequency
reference
  
  245   Tue Sep 12 14:28:36 2023 Ronic ChicheFixedinfomechanics | lasers and optics | detectors and electronicsThomX iglooRemoving high order modesyesterday with Daniele, we tried again
to move the arm horizontally and vertically
from the "zero position" to have
  
  244   Fri Sep 8 19:45:56 2023 Ronic ChicheFixedinfolasers and opticsThomX igloo33MHz oscillator + Alphanov amplifier lockredoing the PDH error signal scheme with
discrete components is more flexible and
it is easier to check the signal/noise ratio.
  
  253   Fri Sep 8 19:35:36 2023 Ronic ChicheFixedinfodetectors and electronicsOptical roomlock oscillateur 33MHz - synthé 500MHzthis afternoon, I installed the frequency
detection scheme in the bunker :

- I changed the large reflected
 20230908_190054.jpg 
  242   Fri Sep 8 18:22:21 2023 Ronic ChicheFixedinfomechanics | lasers and optics | detectors and electronicsThomX iglooRemoving high order modeshere is the picture of the L-shape arm
and the inside of the vessel.

this image corresponds to the "zero"
 Capture.PNG 
  241   Fri Sep 8 12:43:04 2023 Ronic ChicheFixedinfomechanics | lasers and optics | detectors and electronicsThomX iglooRemoving high order modesthis morning we locked the laser and the
FP-cavity with ~ 40kW => some HOM appeared
"randomly" depending on the power.
  
  240   Thu Sep 7 19:23:36 2023 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX iglooFast feedback loop between laser and FP cavitytoday, after the several unsuccessful attempt
yesterday to get an improvement in the lock,
we decided to "rebuild"
 20230907_182412.jpg20230907_182442.jpg 
  239   Thu Sep 7 18:51:43 2023 Ronic ChicheFixedissuelasers and opticsThomX iglooOnefive laser modelock and Smaract CEP controllertoday, during an attempt in improving the
CEP with the Smaract controller CH2, we lost
the laser modelock.
  
  238   Wed Sep 6 20:09:56 2023 Ronic ChicheFixedinfolasers and opticsThomX iglooSmaract controller remplacementpreviously, we were using a spare Smaract
MCS controller to drive the Onefive linear
stages (without -LV -low vibration-
  
  237   Wed Sep 6 19:57:48 2023 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX iglooFast feedback loop between laser and FP cavitytoday, we tried to lock the FP cavity with
the Smaract motors ON (with option -LV).
we know the Smaract controllers produce
  
  236   Tue Sep 5 18:21:12 2023 Ronic ChicheFixedinfolasers and opticsThomX iglooFP-cavity FSR shifttoday, to match the ring frequency at 500.25MHz
(15th laser harmonic), we did a frequency
shift on the laser using the Smaract motors
 20230905_173506.jpg 
  235   Tue Sep 5 18:08:39 2023 Ronic ChicheFixedinfolasers and opticsThomX iglooEquipments shutdownon the August 30rd and 31th, a global power
shutdown was forseen for ThomX.

to prevent damage on equipments,
  
  234   Tue Sep 5 17:59:24 2023 Ronic ChicheFixedissuelasers and optics | detectors and electronicsThomX igloowork with HV voltage on the LaselockYesterday, I checked the 2 output HV channels
of the LaseLock : they work properly but
the noise is bigger than the low voltage
  
  233   Wed Aug 2 13:13:52 2023 Ronic ChicheFixedissuelasers and optics | detectors and electronicsThomX igloowork with HV voltage on the Laselockpresently, the voltage on the laser PZT
is 0-10V, but during the several runs we
did, this voltage is too low to compensate
  
  232   Wed Aug 2 13:07:59 2023 Ronic ChicheNot Fixedissuedetectors and electronicsThomX iglooThomX ring injection kicker noise => USB communication issue with Alphanov amplifierseveral times already, when the electrons
ring injection kicker is running @10Hz, we
observed peaks at the same frequency on reflected
  
  252   Wed Aug 2 11:38:20 2023 Ronic ChicheFixedinfodetectors and electronicsOptical roomlock oscillateur 33MHz - synthé 500MHzToday, I connected the BNC-DB9 female prolongator
cable to the FP-cavity PZT cable (DB9-DB9)
and to the channel B of the Laselock.
 FP-cavity_PZT_@0V.jpgFP-cavity_PZT_@10V.jpg 
  251   Mon Jul 31 19:17:40 2023 Ronic ChicheFixedinfodetectors and electronicsOptical roomlock oscillateur 33MHz - synthé 500MHzToday, I installed a DB9-DB9 female-male
cable on the PZT connector of the FP-cavity.
the PZT is connected between pins
 CFP_-_piezo_intra_cavité.pdfImage_of_P4_S2_window_open_Oxidization_shown.jpeg 
  250   Fri Jul 28 13:19:22 2023 Ronic ChicheFixedinfodetectors and electronicsOptical roomlock oscillateur 33MHz - synthé 500MHz
régler le problème
1:
Kevin m'a apporté un déphaseur
 lock_anneau-cavite.pdf 
  249   Thu Jul 27 18:47:57 2023 Ronic ChicheFixedinfodetectors and electronicsOptical roomlock oscillateur 33MHz - synthé 500MHzpour préparer le lock cavité-anneau,
j'ai un setup de lock en salle optique
entre le laser OneFive 133MHz et un synthé
  
  227   Wed Jul 26 14:49:41 2023 Ronic ChicheFixedinfolasers and opticsThomX igloo33MHz oscillator + Alphanov amplifier lockToday, we locked the cavity with input
power @ 30% for the amp => we got 40kW
with only 30% of coupling (and a bad lock
  
  226   Wed Jun 28 19:07:42 2023 Ronic ChicheFixedissuelasers and opticsThomX iglooIncoming laser beam power issuetoday, we observed on the photodiode used
in reflexion of the cavity, that its voltage
level stops increasing after 50% of power
 Amp_power_vs_ratio.png 
  225   Wed Jun 28 19:01:03 2023 Ronic ChicheFixedinfolasers and opticsThomX iglooFirst X rays and FP-cavity mode and electron beam waists size @ IPon friday 23/06 afternoon, after scanning
the hexapod z-axis, we observed a cut of
the power stored in the FP-cavity (with constant
 Raw_data.jpganalyse_profil_vert_X-1.pptx 
  224   Thu Jun 22 20:20:03 2023 Ronic ChicheFixedinfolasers and opticsThomX igloo33MHz oscillator + Alphanov amplifier lockwe checked yesterday morning the real input
power @ 30% for the amp => it is 16W in
agreement with the previously measured values
  
  223   Tue Jun 20 19:08:17 2023 Ronic ChicheFixedinfolasers and opticsThomX igloo33MHz oscillator + Alphanov amplifier lockI checked with the Matlab code below the
CEP detuning effect (2nm sech² spectrum...
not exactly the same as in ThomX)
 ThomX_FP_intracavity_signal.m 
  222   Tue Jun 20 18:45:10 2023 Ronic ChicheFixedinfolasers and opticsThomX igloo33MHz oscillator + Alphanov amplifier lockthis morning, I tested the laser+amplifier
@ 30% lock on the FP cavity with and without
Smaract motors.
 PDH_error_signal_with_Smaract_motors_ON-OFF.jpgLock_at_amp_@30%.jpg10kW_in_remote.jpg 
  221   Mon Jun 19 16:08:15 2023 Manar AmerFixedreportlasers and optics | detectors and electronics | cabling | softwareThomX iglooCavity Lock - Alphanov Amplifier The computer is possible to connect from
the control room,

we are able to run remotely the
  
  220   Fri Jun 9 19:51:43 2023 Manar AmerFixedreportlasers and optics | detectors and electronics | cabling | softwareThomX iglooCavity Lock - Alphanov Amplifier In the morning, we locked on the first
resonance. With an increase on the amplifier
power @ 20-25% and 30%, which reduced the
 tek00001_noise_reduced_first_resonance.pngtek00000_cavity_lock_with_noise_from_odcillator_controller.png 
  219   Thu Jun 8 11:12:20 2023 Ronic ChicheFixedinfolasers and opticsThomX igloo33MHz oscillator + Alphanov amplifier lockAfter removing the 2 generators from the
optical table, the lock is much more stable
and now, it is possible to lock on the main
  
  218   Wed Jun 7 21:46:50 2023 Manar AmerFixedreportlasers and optics | detectors and electronics | cabling | softwareThomX iglooCavity Lock - Alphanov Amplifier Today with Ronic,

starting with major events that
happened (Water circulation + ThomX valves
 tek00001.png20230607_183626_Frep_CEP_motors_smartAct.jpg20230607_183641_transmitted_power.jpgtek00002.png 
  217   Tue Jun 6 15:52:59 2023 Ronic ChicheFixedinfolasers and opticsThomX igloo33MHz oscillator + Alphanov amplifier locktoday with Daniele, we locked easily (but
with a noisy lock) on the secundary resonance
and we tried to lock on the main resonance
 M250_Video_Amplifier.pdfM250_manual.pdf 
  216   Tue Jun 6 01:12:11 2023 Manar AmerFixedreportlasers and optics | detectors and electronics | cabling | softwareThomX iglooCavity Lock - Alphanov Amplifier Today, I installed a power meter at the
transmission point of the 1st spherical mirror
, transmission 3 ppm (direct from cavity
 20230605_tek00001_33uW.png20230605_tek00002_82uW.png 
  215   Fri Jun 2 10:54:25 2023 Manar AmerFixedreportlasers and optics | detectors and electronics | cabling | softwareThomX iglooCavity Lock - Alphanov Amplifier Yesterday, with Ronic we locked ThomX cavity
on the second resonance 

Laser : 33.36 MHz , Amplifier :
 13x 
  214   Thu Jun 1 18:15:04 2023 Ronic ChicheFixedinfolasers and opticsThomX igloo33MHz oscillator + Alphanov amplifier lockfinding the right modulation/demodulation
PDH phase is very difficult on the main resonance
because the we get non stationnary signals
  
  213   Thu Jun 1 10:31:45 2023 Ronic ChicheFixedinfolasers and opticsThomX igloo33MHz oscillator + Alphanov amplifier lockthe last tries to lock the 33MHz + amplifier
to the 30k Finesse FP-cavity were unsuccessful.

during a laser Frep scan using
 120705_Displacement_of_cylindrical_piezo_ceramics.xls 
  212   Tue May 30 18:32:37 2023 Manar AmerFixedreportlasers and optics | detectors and electronics | cabling | softwareThomX iglooCavity Lock - Alphanov Amplifier This morning, while trying Guillaume solution
of disconnecting the 24 V necessary to the
second and third stage and raise the threshold
 tek00000.png 
  211   Mon May 22 16:07:12 2023 Manar AmerFixedreportlasers and optics | detectors and electronicsThomX iglooPW laser Injection into cavity Today with Ronic and Daniele we attempted
to lock the cavity, but the alphanov amplifier
did not turn on because of an error in MMD3
 2023-05-22_MMD3_error_on_alarm_window.jpg2023-05-22_alphanov_software.jpg 
  210   Wed Apr 19 16:41:46 2023 Manar AmerFixedreportlasers and optics | detectors and electronicsThomX iglooPW laser Injection into cavity Added Note: the coupling we get is at low
power, only preamplifier is on (~ 300 mW)

was done at the end due to excitation
  
  209   Wed Apr 19 16:39:28 2023 Manar AmerFixedreportlasers and optics | detectors and electronicsThomX iglooPW laser Injection into cavity
On Monday with Daniele,

we
did full characterization of amplifier beam
@ 10% amplification, adjusted the telescope
 20230418_size_of_beam_before_injection_window_at_10percetage_ampli.jpg20230418_coupling_at_the_start_only_alignment_improved1.jpg20230418_zoom_on_Oscilliscope_signal_fundamental_mode.jpg20230418_coupling_after_improving_it_with_regulator_on_attempting_to_lock.jpg 
  208   Thu Apr 13 17:48:49 2023 Manar AmerFixedreportlasers and optics | detectors and electronicsThomX iglooPW laser Injection into cavity Yesterday,


we installed the second
high power reflecting mirrors at the output
 20230412_pulsed_cav_mode.bmp 
  207   Tue Apr 11 16:58:16 2023 Manar AmerFixedreportlasers and optics | detectors and electronicsThomX iglooFP Finesse measurement using CWThis morning, with Ronic and Daniele, we
locked the cavity again (The lock was relatively
easy and stable during the reading of the
 20230411_first_Finesse_reading.JPG20230411_second_Finesse_reading.JPG20230411_Beam_Profile_position_differance_when_changing_FSR.JPG 
  206   Fri Apr 7 15:56:40 2023 Manar AmerFixedreportlasers and optics | detectors and electronicsThomX iglooCW FP Cavit lock This morning with Daniele and Viktor,

- we confirmed the "potato"
mode was well centered on the injected beam
 20230407_103103-2.jpg 
  205   Fri Apr 7 00:26:11 2023 Manar AmerFixedreportlasers and optics | detectors and electronicsThomX iglooCW FP Cavit lock Yesterday morning we locked the cavity
on a strange mode in the cavity (we call
it mode, but not sure what it is ??)
 20230406_setup.jpg20230406_transmission_S2-P4.jpg20230406_Cavity_Lock.jpg 
  204   Tue Apr 4 13:03:23 2023 Manar AmerFixedreportlasers and optics | vacuum | detectors and electronicsThomX iglooCavity Alighnment Today, we prepared lenses for a telescope
for the CW laser injection into the cavity,
yet to be installed
 20230404_P4_Transmission.jpg20230404_vacuum_level.jpg 
  203   Tue Mar 28 13:56:52 2023 Manar AmerFixedreportlasers and optics | detectors and electronicsThomX iglooCavity Alighnment Last week, with Ronic and Victor we aligned
the cavity using CW laser (Koheras)


we have also installed
 9x 
  202   Mon Mar 20 17:55:25 2023 Ronic ChicheFixedreportlasers and optics | softwareThomX iglooAlphanov amplifier beam profile measurementdue to several "case temperature"
issues, I change the "Max case temperature"
in the "general config" of the
  
  201   Mon Mar 20 17:39:28 2023 Ronic ChicheFixedinfoutilitiesThomX iglooPower shut down on Saturday the 18thToday, I restarted all the equipements
:

Chiller                                                
  
  200   Mon Mar 20 17:23:09 2023 Ronic ChicheFixedinfolasers and opticsOptical room33MHz laser SN2439 back to OrsayAs the general local network for the FP-cavity
devices is 192.168.xxx.xxx, I changed the
IP adress of the smaract laser motors (Frep
 MCS_Network_Interface_Configuration_Guide-1.pdf20230320_154643[1].jpg 
  199   Mon Mar 20 09:33:54 2023 Ronic ChicheFixedinfoutilitiesThomX iglooPower shut down on Saturday the 18thAll the equipments have been switched off
on Friday 17th due to a power shut down on
Saturday 18th :
  
  198   Fri Mar 17 18:54:19 2023 Manar AmerFixedreportlasers and opticsOptical roomNew Mirrors from LMA _ ImagesToday we tested a mirror from one patch

image is for the front face of
the mirror
 20230317_Images_of_New_Mirrors-compressed.pptxMirror_Tested.jpgWhatsApp_Image_2023-03-17_at_6.39.44_PM.jpgimage006.jpg 
  197   Wed Mar 15 21:14:51 2023 Manar AmerFixedreportlasers and optics | detectors and electronicsThomX iglooAmplifier Beam Profile over time Information about today's work is added
to logBook !!

  
  196   Wed Mar 15 21:13:07 2023 Manar AmerFixedreportlasers and optics | detectors and electronicsThomX iglooAmplifier Beam Profile over time This morning we took data of the beam profile
at 4 different points to see the evolution
of
 10x 
  195   Tue Mar 14 16:54:48 2023 Manar AmerFixedreportlasers and optics | detectors and electronicsThomX iglooAmplifier Beam Profile over time This morning, with Ronic, we opened the
compressor box to observe if there is any
misalignment of the mounts or the CVBG's
 comparision_Between_Beam_profile_over_time.jpg 
  194   Mon Mar 13 16:10:24 2023 Ronic ChicheFixedreportlasers and optics | softwareThomX iglooAlphanov amplifier beam profile measurementWe took reading of the beam profile of
the amplifier without a lens @ 30 cm from
the 2nd wedge for amplification percentages
 Beam_wavefront_30cm_no_Lens.jpg 
  193   Mon Mar 13 14:02:59 2023 Ronic ChicheFixedinfolasers and opticsThomX iglooCW laser installation and cleaningThis morning with Ronic , in preparation
for the mirror installation, we removed additional
mechanics and cables from the table. 
  
  192   Wed Mar 8 15:11:49 2023 Ronic ChicheFixedinfolasers and opticsThomX iglooCW laser installation and cleaningThis morning with Manar, in order to prepare
the installation of the news FP cavity mirrors,

- we installed the Koheras below
 20230308_121713.jpg 
  191   Wed Mar 8 14:49:12 2023 Ronic ChicheFixedreportlasers and optics | softwareThomX iglooAlphanov amplifier beam profile measurementthis morning with Manar,
we checked the Alphanov amplifier
issue : "The laser has been stopped
 20230308_124313.jpg 
  190   Mon Feb 27 18:23:13 2023 Ronic ChicheFixedreportlasers and optics | softwareThomX iglooAlphanov amplifier beam profile measurementThis morning with Victor we took a reading
of the beam profile using a 400 mm lens
at 70 % and 100 % amplification.
 WhatsApp_Image_2023-02-27_at_6.07.00_PM.jpeg 
  189   Thu Feb 23 10:15:30 2023 Ronic ChicheFixedreportlasers and optics | softwareThomX iglooAlphanov amplifier beam profile measurement
Yesterday,
Guillaume Machinet and Vincent Clet from
Alphanov came to fixe some issues with the
  
  188   Wed Feb 22 16:11:32 2023 Ronic ChicheFixedreportlasers and optics | softwareThomX iglooAlphanov amplifier beam profile measurementOn Monday 20th of February, Daniele and
Viktor took some beam profile measurement
data @ 50% of power amplification.
 Analyse_Données_20_fevrier.pptx 
  187   Tue Feb 14 12:53:09 2023 Ronic ChicheFixedreportlasers and optics | softwareThomX iglooAlphanov amplifier beam profile measurementThis morning with Daniele, we did a second
measurement of the beam profile using a different
lens of focal 400 mm.
  
  186   Fri Feb 10 09:54:46 2023 Ronic ChicheFixedreportlasers and optics | softwareThomX iglooAlphanov amplifier beam profile measurementThis morning,

- with the "Alphanov"
software => Central panel => "system"
  
  185   Wed Feb 8 14:09:50 2023 Ronic ChicheFixedreportlasers and optics | softwareThomX iglooAlphanov amplifier beam profile measurementWith Daniele after, we took a readings
of the beam with a lens of 750 mm.

From the observed data, we can
 20230208_error_watchdog.jpeg 
  184   Wed Feb 8 11:25:50 2023 Ronic ChicheFixedreportlasers and optics | softwareThomX iglooAlphanov amplifier beam profile measurementwe have had this new issue (watchdog alarm
switching off the amplifier) for several
days.
 scope.jpg 
  183   Mon Jan 30 17:40:10 2023 Manar AmerFixedreportlasers and optics | detectors and electronicsThomX iglooAlphanov amplifier beam profile Data This Morning with Victor the amplifier
was turned on @ 20% amplification (output
~ 9 W ) for approximately 3 hours and no
  
  182   Mon Jan 30 17:28:33 2023 Ronic ChicheFixedreportlasers and optics | softwareThomX iglooAlphanov amplifier beam profile measurementthe laser amplifier worked for some days
but it ended to a "watchdog" alarm
which switches off the amplifier... investigation
  
  181   Mon Jan 30 17:28:00 2023 Ronic ChicheFixedreportlasers and optics | softwareThomX iglooAlphanov amplifier beam profile measurementRonic on Friday operated the Amplifier
from the Alphanov software, switched it off
then turned on the LAL software,
  
  180   Wed Jan 11 17:38:13 2023 Ronic ChicheFixedinfolasers and opticsThomX iglooAlphanov amplifier beam profile measurementthis morning with Manar,

- we fixed the chiller problem
(+/-2°C fluctuation around the set temperature
  
  179   Wed Jan 11 17:31:00 2023 Ronic ChicheFixedinfolasers and optics | softwareThomX iglooAlphanov amplifier beam profile measurementToday with
Ronic 

For
 error_signal_Temperature_case_amplifier.jpg 
  178   Mon Jan 9 14:03:16 2023 Manar AmerFixedreportlasers and optics | detectors and electronicsThomX iglooAlphanov amplifier beam profile Data Adding the schematic of the measurements.,

the 4°
Beam Deviation, AR Coating ( B coating)
 8x 
  177   Mon Jan 9 12:11:14 2023 Ronic ChicheFixedinfolasers and opticsThomX iglooAlphanov amplifier beam profile measurementthis morning with Manar,

- we checked first the chiller
problem.
  
  176   Thu Jan 5 09:58:50 2023 Ronic ChicheFixedinfolasers and opticsThomX iglooAlphanov amplifier beam profile measurementyesterday morning with Manar,

1) we fixed the threshold level
of the laser input signal which makes the
 Tutoriel_PD_PULS.pdf2023_Alphanov_Beam_Profile_setup.jpg 
  175   Mon Jan 2 15:21:09 2023 Ronic ChicheFixedinfolasers and opticsThomX iglooAlphanov amplifier beam profile measurementtoday with Manar, we brought everything
to make the profile measurement.

the chiller was in error
  
  174   Thu Dec 15 11:41:36 2022 Ronic ChicheFixedissuelasers and opticsThomX iglooAlphanov amplifier issueYesterday, we received the controller back
from Alphanov
and I tested it immediately in the
  
  173   Tue Dec 6 11:47:36 2022 Ronic ChicheFixedissuelasers and opticsThomX iglooAlphanov amplifier issueToday, I did a Teams meeting with Guillaume.
He didn't see any problem with
the controller.
 Sécurité_et_CC_ampli_Alphanov.pdf 
  172   Thu Dec 1 13:51:05 2022 Ronic ChicheFixedissuelasers and opticsThomX iglooAlphanov amplifier issueThe laser amplifier controller has been
sent yesterday and received today by Alphannov.

they should do the assessment quickly...
  
  171   Wed Nov 9 14:49:52 2022 Ronic ChicheFixedissuelasers and opticsThomX iglooAlphanov amplifier issueI just tested the fuse inside the black
ON/OFF switch on the rear panel => it
is OK ! :-(
  
  170   Wed Nov 9 13:03:50 2022 Ronic ChicheFixedissuelasers and opticsThomX iglooAlphanov amplifier issueon Monday morning 7/11, we tried to restart
the Alphanov amplifier which was not turned
on since end of april 2022, but it didn't
  
  169   Wed Nov 9 11:34:54 2022 Ronic ChicheFixedinfolasers and opticsThomX iglooStrecher and fiber injection alignmentMonday 7/11 morning, the power in the fiber
was still 6.2 mW

  
  168   Thu Nov 3 09:09:18 2022 Ronic ChicheFixedinfolasers and opticsThomX iglooStrecher and fiber injection alignmentthis morning : still 6.2 mW at the output
of the fiber.

the powermeter has been removed
  
  167   Wed Nov 2 11:42:43 2022 Ronic ChicheFixedinfolasers and opticsThomX iglooStrecher and fiber injection alignmentThis morning with Manar, we continued the
strecher CVBG alignment and fiber injection
procedure :
  
  166   Mon Oct 24 17:35:01 2022 Ronic ChicheFixedinfolasers and opticsThomX iglooStrecher and fiber injection alignmentManar + Victor, today in the morning we
aligned the CVBG of the stretcher.

The double path using the mirror
  
  165   Thu Oct 20 15:01:02 2022 Ronic ChicheFixedinfolasers and opticsThomX iglooStrecher and fiber injection alignmentI used the 33MHz spectrum measurement :
https://elog.lal.in2p3.fr/FPC/THOMX+commissioning/153
fitted by P=P0*sech²((f-f0)/df)
 D24-02.xls33MHz_power_spectrum_after_double_patch_strecher_CVBG.png 
  164   Wed Oct 19 15:01:32 2022 Ronic ChicheFixedinfolasers and opticsThomX iglooStrecher and fiber injection alignmentThis morning with Ronic, using a pickup
mirror, we measured the power in different
locations along the path of the stretcher
  
  163   Wed Oct 19 14:57:43 2022 Ronic ChicheFixedinfolasers and opticsThomX iglooStrecher and fiber injection alignmentThis morning with Manar, we measured the
power at different points:
- direct measurement at the output
  
  162   Tue Oct 18 17:51:12 2022 Ronic ChicheFixedinfolasers and opticsThomX iglooStrecher and fiber injection alignmentIn preparation for tomorrow morning, I
did a test with a 45° mount to have a
power pickup inside the injection box.
  
  161   Mon Oct 17 13:58:08 2022 Ronic ChicheFixedinfolasers and opticsThomX iglooStrecher and fiber injection alignmentThis morning with Viktor, we started the
alignment of the CVBG and fiber.

we did a better alignment of the
 Adjustment_SMS.pdf 
  160   Thu Oct 13 12:26:07 2022 Ronic ChicheFixedinfolasers and opticsThomX iglooStrecher and fiber injection alignmentToday, after laser was modelocked, we checked
the power inside the fiber coming from the
Alphanov Strecher box.
  
  159   Thu Oct 13 12:19:11 2022 Ronic ChicheFixedinfolasers and opticsOptical room33MHz laser SN2439 back to OrsayToday, we succeded to make the laser modelock.
the ouptut power is above 35mW (the
powermeter was saturated)
 IMG_20221013_095839.jpg 
  158   Thu Oct 13 12:12:49 2022 Ronic ChicheFixedinfolasers and opticsOptical room33MHz laser SN2439 back to OrsayYesterday, we put back the 33MHz oscillator
into the casemate with the new Smaract controller.
after switching ON the laser controller,
  
  157   Fri Oct 7 17:47:39 2022 Ronic ChicheFixedinfolasers and opticsOptical room33MHz laser SN2439 back to OrsayToday, we used an "ELI-NP" Smaract
controller made with these 2 references :
MCS-3CC-ETH-TAB (SN 2271) => main
  
  156   Wed Oct 5 15:51:26 2022 Ronic ChicheFixedinfolasers and opticsOptical room33MHz laser SN2439 back to OrsayYesterday with Aurélien, we try
to make the laser modelock using the Smaract
translation stages embedded inside the laser
 Stick-Slip_Positioners_Mechanical_and_Electrical_Interface_Data_Sheet.pdf 
  155   Mon Oct 3 18:54:58 2022 Ronic ChicheFixedinfolasers and opticsOptical room33MHz laser SN2439 back to OrsayThis morning, with Aurélien and
Daniele, we did the swap between the 33MHz
and 133MHz oscillators.
  
  154   Tue Aug 30 18:31:49 2022 Loïc AmoudryFixedreportlasers and opticsOptical roomAmplifier output power We checked the Dichroic mirror we have
: it is a DMSP1000 shortpass dichroic mirror
as specified in this post.
  
  153   Tue Jul 12 15:55:20 2022 Ronic ChicheFixedinfolasers and opticsOptical room33MHz laser SN2439 back to OrsayOn the 8th of July, the SN2439 33MHz laser
was returned from NKT to our lab, being repaired.

it stayed all the weekend to warm
 Capture.PNG 
  152   Wed Jun 15 15:18:57 2022 Ronic ChicheFixedinfolasers and opticsThomX igloomirrors removingThis morning with Viktor, we opened the
2 vessels and removed the 4 FP-cavity mirrors.

all the mirrors have been put in
  
  151   Tue Jun 14 10:43:07 2022 Ronic ChicheFixedinfovacuumThomX iglooVessels vacuum at ambiant pressureLast Friday and this morning, with Bruno,
we close the ring/cavity valves and put some
dry air in the two vessels through a filter
  
  150   Tue Apr 26 11:15:23 2022 Ronic ChicheFixedissuelasers and opticsThomX iglooAlphanov amplifier compressor's CVBG thermal imageslast Friday with Manar, we took some thermal
images of the Alpnavov compressor box.

I post a small document to summarize
 Thermal_images.pdf 
  149   Tue Apr 26 11:12:58 2022 Ronic ChicheFixedissuelasers and opticsThomX iglooAlphanov amplifier compressor's CVBG thermal imageslast Friday with Manar, we took some thermal
images of the Alpnavov compressor box.

I post a small document to summarize
 Thermal_images.pdf 
  148   Tue Apr 19 12:15:43 2022 Manar AmerFixedreportlasers and opticsThomX iglooAlphanov amplifier Beam ProfileFor better comparison ,

the measurements done previously
with 2 CVBGs was done at ~ 30 cm and the
 8x 
  147   Fri Apr 15 19:00:20 2022 Manar AmerFixedreportlasers and opticsThomX iglooAlphanov amplifier Beam ProfileVictor, Ronic, Manar

Today  was dedicated to the
study of the CVBG, and it's effect on
 20x 
  146   Fri Apr 8 19:25:16 2022 Manar AmerFixedreportlasers and opticsThomX iglooAlphanov amplifier Beam Pulse DurationPulse Duration FWHM = 12.9 ps




  
  145   Fri Apr 8 19:24:32 2022 Manar AmerFixedreportlasers and opticsThomX iglooAlphanov amplifier Beam Pulse DurationMeasurement of the pulse was done at the
end of the afternoon, Pulse Duration
FWHM = 12.9 ps
 20220401_Alphanov_Pulse_Duration.jpg20220408_AMplifier_133MHz_Pulse_duration.jpg20220408_AMplifier_133MHz_Pulse_duration_better_alignment.jpg 
  144   Fri Apr 8 13:34:54 2022 Manar AmerFixedreportlasers and opticsThomX iglooAlphanov amplifier Beam Pulse DurationThe pulse duration from the amplifier compressor
output will be measured using PulseCheck
autocorelator
 pulse-check_compressed.pdf 
  143   Fri Apr 8 13:15:18 2022 Ronic ChicheFixedinfolasers and opticsThomX iglooFirst hands on the Alphanov amplifier & softwareSoftware Works well and is operational.

Just closing the log series!!!

  
  142   Fri Apr 8 13:12:34 2022 Manar AmerFixedreportlasers and opticsThomX iglooAlphanov amplifier Beam ProfileThis Morning, another reading was taken
for the output of the amplifier after the
compressor using 2 wedge mirrors.
 12x 
  141   Mon Apr 4 14:23:14 2022 Manar AmerFixedreportlasers and opticsThomX iglooAlphanov amplifier Beam ProfileAdding the readings  20% , 30% , 
40%  for output of amplifier after the
compressor
 6x 
  140   Sat Apr 2 00:51:07 2022 Manar AmerFixedreportlasers and opticsThomX iglooAlphanov amplifier Beam ProfileReadings of the beam shape and fit at the
output of the compressor

differance from
 20220401_Alphanov_Beam_setup_after_compressor.jpg20220401_Amplifier_AfterCompressor_50perc_133MHz.bmp20220401_Amplifier_AfterCompressor_60perc_133MHz.bmp20220401_Amplifier_AfterCompressor_50perc_133MHz_BeamFit.png20220401_Amplifier_AfterCompressor_60perc_133MHz_BeamFit.png 
  139   Sat Apr 2 00:45:25 2022 Manar AmerFixedreportlasers and opticsThomX iglooAlphanov amplifier Beam ProfileReadings of the beam shape and horizontal
(upper plot) and vertical (lower plot) axis
fit at the direct output of the amplifier.
 9x 
  138   Fri Apr 1 23:59:51 2022 Manar AmerFixedreportlasers and opticsThomX iglooAlphanov amplifier Beam ProfileToday a second reading of the beam profile
was done , with Victor ,Ronic, Aurlien and
Manar
  
  137   Wed Mar 23 13:55:11 2022 Manar AmerFixedreportlasers and opticsThomX iglooAlphanov amplifier Beam ProfileAdding the fitted beam in 1D in Horizontal
and vertical axis.

for 10%   to  60%
 6x 
  136   Tue Mar 22 21:20:28 2022 Manar AmerFixedreportlasers and opticsThomX iglooAlphanov amplifier Beam Profile 




  
  135   Tue Mar 22 21:19:48 2022 Manar AmerFixedreportlasers and opticsThomX iglooAlphanov amplifier Beam ProfileToday: Manar, Ronic and Aurlien started
the study of the beam profile of the alphanov
amplifier at high power.
 8x 
  134   Fri Mar 18 15:04:30 2022 Ronic ChicheFixedinfolasers and opticsThomX iglooAlphanov amplifier power measurementanswers from Guillaume:

- the chiller temperature has to
be set to 25°C
  
  133   Fri Mar 18 11:48:14 2022 Ronic ChicheFixedinfolasers and opticsThomX iglooAlphanov amplifier power measurementThis morning, with Manar and Aurélien,
we measure the power directly at
the output of the Alphanov amplifier with
 power_after_compressor_vs_current_for_133MHz_laser.png 
  132   Mon Mar 14 18:39:40 2022 Manar AmerFixedinfomechanics | lasers and optics | detectors and electronicsThomX iglooCurrent Installed SetupAttached is the current setup in ThomX  18-02-2022_ThomX_FPCavity_Finesse_Setup.jpg 
  131   Fri Mar 11 17:58:24 2022 Ronic ChicheFixedinfolasers and opticsThomX iglooFirst hands on the Alphanov amplifier & softwareAdditional information related to the injected
power into the amplifier fibers.

power = 4.45 mW (as shown from
  
  130   Fri Mar 11 17:33:33 2022 Ronic ChicheFixedinfolasers and opticsThomX iglooFirst hands on the Alphanov amplifier & softwareAurélien, Manar, and I spent more
than 2h trying to start the software communicating
with the Alphanov amplifier controller.
  
  129   Fri Mar 11 12:59:35 2022 Manar AmerFixedreportlasers and opticsThomX iglooCavity beam Image Updated beam image after change on the
mode axis.

Taken after P4.
 Capture.PNGCapture2.PNG 
  128   Fri Mar 11 12:46:58 2022 Ronic ChicheFixedinfolasers and opticsThomX iglooFP cavity mode axis change and Finesse measurementthis morning with Manar, we did a cavity
mode axis change.

we checked the cavity mode centroid
  
  127   Fri Feb 4 10:59:56 2022 Manar AmerFixedreportlasers and optics | detectors and electronicsThomX iglooCavity Lock and Finess measurment one thing which could reduce the Finesse
is the L-shape metal piece if it is slightly
inserted in the FP-cavity mode path.
 apercu_03.jpgBras_manipulateur.jpg 
  126   Thu Feb 3 19:01:04 2022 Manar AmerFixedreportlasers and optics | detectors and electronicsThomX iglooCavity Lock and Finess measurment

After changing the way of injecting
modulation for PDH and modulation for FSR
 Finesse_Fit.png 
  125   Thu Feb 3 18:59:10 2022 Manar AmerFixedreportlasers and optics | detectors and electronicsThomX iglooCavity Lock and Finess measurment

to measure the Finesse, instead
of having 2x EOM for the PDH and for the
  
  123   Thu Feb 3 18:40:04 2022 Manar AmerFixedreportlasers and optics | detectors and electronicsThomX iglooFP cavity alignment The fluctuation problem has been solved.
It was simply the new scheme to inject
2 RF frequencies in a single EOM.
  
  121   Thu Feb 3 14:11:50 2022 Manar AmerFixedreportlasers and optics | detectors and electronicsThomX iglooCavity Lock and Finess measurment This morning, me and Ronic managed to obtain
the FSR and image of the finesse which is
to be analyzed.
 6x 
  120   Thu Feb 3 14:10:08 2022 Manar AmerFixedreportlasers and optics | detectors and electronicsThomX iglooFP cavity alignment As it can be seen on the first plot, even
with a good locking (good reduction of "high"
frequencies noise: we had better locking
  
  119   Thu Feb 3 13:56:24 2022 Manar AmerFixedreportlasers and optics | detectors and electronicsThomX iglooFP cavity alignment Ending alignment series !!




  
  118   Wed Feb 2 11:41:01 2022 Manar AmerFixedreportlasers and optics | detectors and electronicsThomX iglooFP cavity alignment Adding Oscilloscope images


delocked + locked intervals
showing the 20% coupling
lock
 tek0003.pngtek0006.pngtek0007.png 
  117   Wed Feb 2 11:22:51 2022 Manar AmerFixedreportlasers and optics | detectors and electronicsThomX iglooFP cavity alignment This morning with Manar, we installed the
AOM+RF amplifier and the associated fast
feedback loop.
  
  116   Tue Feb 1 16:40:06 2022 Manar AmerFixedreportlasers and optics | detectors and electronicsThomX iglooFP cavity alignment This afternoon, I did some alignment of
the injection mirrors with a fast scan on
the LaseLock to get a regular transmission
  
  115   Tue Feb 1 14:17:02 2022 Manar AmerFixedreportlasers and optics | detectors and electronicsThomX iglooFP cavity alignment Installed and inputs: 


CW laser ; power = 101
mW
PDH ;

at output

Low
 ThomX_FP_setup_01-02-2022.pngtek0002.png 
  114   Wed Jan 19 09:36:53 2022 Manar AmerFixedreportlasers and opticsThomX iglooFP cavity alignment Yesterday, we did the alignment again using
Iris and beam profilers to obtain a more
precise result.
  
  113   Mon Jan 17 21:22:28 2022 Manar AmerFixedreportlasers and opticsThomX iglooFP cavity alignment ***** Continuation of the alignment ----
FP Cavity Open --- ****

The cavity was put under outer
 Interior_of_cavity_P1_S3_windowOpen.jpgInterior_of_cavity_P1_S3_windowOpen_irrisOnP1.jpgCavityAlignment_cavityOpen_S2_Output.jpgCavityAlignment_cavityOpen_S3_Output.jpeg 
  112   Mon Jan 17 10:04:14 2022 Ronic ChicheFixedinfomechanicsThomX iglooDocumentation about mechanics on Atriumhttps://atrium.in2p3.fr/0dded51a-1cb0-43e6-ae0d-626cd5db7078

a lot of schematics regarding the
  
  111   Thu Jan 13 17:08:56 2022 Ronic ChicheFixedissuemechanics | lasers and opticsOptical roomAlignment procedurePicture of the installed mirrors inside
the FP cavity.

To install an Iris instead of a
 montage.jpg 
  110   Tue Jan 11 10:36:35 2022 Manar AmerFixedreportlasers and opticsThomX iglooFP cavity alignment The alignment is on hold until next week
17th - 18th  Jan

an Alignment attempt will be done
  
  109   Thu Dec 2 21:31:21 2021 Manar AmerFixedreportlasers and opticsThomX iglooFP cavity alignment Note the direction of injection is  
  M1 - M2 - M3 - M4

                                                      
 2021_12_02_M2_Transmission.jpg2021_12_02_M3_transmission_90deg.PNG 
  108   Fri Nov 26 20:12:10 2021 Ronic ChicheFixedreportlasers and opticsThomX iglooFP cavity alignmentA continuation of the alignment process
was done, there was change in it due to variation
in temperature, 
  
  107   Thu Nov 4 18:57:16 2021 Ronic ChicheFixedinfolasers and opticsThomX iglooFP cavity alignmentThis afternoon, we continued the alignment
of the red laser.
we did it using the 2 final injection
  
  106   Thu Nov 4 13:05:49 2021 Ronic ChicheFixedinfolasers and opticsThomX iglooFP cavity alignmentas the iris used to locate the FP-cavity
axis have been removed before moving the
table inside the Igloo, we have to find again
  
  105   Fri Dec 18 17:06:53 2020 Loïc AmoudryFixedreportlasers and opticsOptical roomOnefive ouput power and spectrum1)  Note: The OneFive laser used for
experimenting is the one for the  SBox

but, for now only this laser arrived
  
  104   Fri Dec 18 16:10:04 2020 Loïc AmoudryFixedreportlasers and opticsOptical roomOnefive ouput power and spectrumAfter turning on, one can see the 133.33MHz
Onefive output power for ~40min with OD2
filter (~/20). So the real output power is
 33MHz_output_power.PNG133_spectrum_full.PNG133_spectrum.PNG133_spectrum2.PNG 
  103   Fri Nov 6 14:23:16 2020 Loïc AmoudryFixedreportlasers and opticsOptical roomBeam size and finesseMeasurement behind P4 (planar mirror)




  
  102   Tue Oct 27 13:13:50 2020 Loïc AmoudryFixedinfolasers and opticsOptical roomCoating reflectivityCoatings reflectivity curves and datas
for HR Saphir, HR Suprasil and HR ULE.
 6x 
  101   Tue Jul 7 12:49:38 2020 Ronic ChicheFixedinfolasers and opticsOptical roomFinesse measurement after the Edge installationAfter the Edge installation inside the
cavity, the Finesse has been measured several
times by modulation technique with an average
 untitled.png 
  100   Tue Jun 16 13:03:52 2020 Loïc AmoudryFixedreportlasers and opticsOptical roomFinesse measurement after confinementAfter 3 months without human presence,
finesse has been measured 3 times with
average optimization: 
 sweep_parameters.PNGtek00007.pngtek0009CH1.isftek0010CH1.isftek0011CH1.isf 
  99   Fri Feb 28 17:44:12 2020 Ronic ChicheFixedreportlasers and opticsOptical roomPointing stability with CVBGYesterday, with Titouan, we made some measurements
on pointing stability of the laser beam after
amplifier and CVBG.
 Pointing_stability_without_airflow_and_no_one_walking_around.pngPointing_stability_without_airflow_vs_amplifier_current.png 
  98   Fri Feb 28 09:20:37 2020 Ronic ChicheNot Fixedissuelasers and opticsOptical roomAmplifier laser diodes issueThis is a long time issue for the ThomX
amplifier : on the 4 pumping diodes available,
the 1st diode has a higher temperature than
 Problem_TEC.PNGparam_diode_1.csvparam_diode_2.csv 
  97   Wed Feb 26 16:48:02 2020 Ronic ChicheFixedinfolasers and opticsOptical roomOptical spectrum before and after CVBGMeasurement of the optical spectrum with
Avantes OSA before (1st picture) and after
CVBG (2nd picture) with 2nd stage on the
 OSA_after_amplifier_CFBG_and_before_CVBG.PNGOSA_after_amplifier_CFBG_2_CVBG.PNG 
  96   Wed Feb 26 11:05:09 2020 Ronic ChicheFixedinfolasers and opticsOptical roomOptical spectrum analyzer resolutionSame measurement with Koheras @100mW and
using fiber coupling lenses between Koheras
and Avantes OSA.
 Capture2.PNG 
  95   Wed Feb 26 10:38:37 2020 Ronic ChicheFixedinfolasers and opticsOptical roomOptical spectrum analyzer resolutionThe Koheras @0.5mW is directly connected
with fibers FC/APC -> FC/PC to the Avantes
optical spectrum analyzer.
 Capture.PNG 
  94   Mon Feb 24 16:28:52 2020 Ronic ChicheFixedreportlasers and opticsOptical roomBeam pulse durationLast Thursday (20th of February), Loïc
and Titouan realigned the stretcher CVBG
to its nominal angle and they used an interferometric
 Interferences_pulse_width.png 
  93   Wed Feb 19 17:21:28 2020 Loïc AmoudryFixedreportlasers and opticsOptical roomPowerup with 2.5ps pulsesA power up has been performed on ThomX
until 65kW intracavity power. We didn't
see any modes but stored power was really
 report.PNGtek00004.png4A.PNG 
  92   Tue Feb 18 12:24:00 2020 Loïc AmoudryFixedreportlasers and opticsOptical roomThomX Locked with CVBGsThomX has been locked with a new telescope
while using compression CVBGs.
Coupling is ~50-55% and lock is stable.
 tek00001.pngtek0002CH1.isftek0002CH2.isftek0002CH3.isftek0002CH4.isf 
  91   Fri Feb 14 18:02:37 2020 Loïc AmoudryFixedreportlasers and opticsOptical roomTelescope for compressors and ThomXCVBGs telescope is done with w ~= 1mm. 

ThomX telescope is done with w
~= 2.3mm in x and y.
  
  90   Fri Feb 14 09:26:07 2020 Ronic ChicheFixedreportlasers and opticsOptical roomBeam pulse durationYesterday, Loïc put the CVBG's
back to their specified angles.

We used an interferometric technique
 interferences_pulse_duration.png 
  89   Wed Feb 12 17:43:43 2020 Ronic ChicheFixedreportlasers and opticsOptical roomBeam pulse durationYesterday, Loic installed a telescope before
CVBG's to reduce the spot size on CVBG's
and reduced the incident angle 0.5-1°
 pulse_width.png 
  88   Fri Feb 7 14:46:55 2020 Ronic ChicheFixedreportlasers and opticsOptical roomBeam pulse durationWe installed the 2 CVBG for compression
after the amplifier.
We used an interferometric technique
 interferences.avipulse_duration.png 
  87   Tue Feb 4 14:39:56 2020 Loïc AmoudryFixedinfolasers and opticsOptical roomOnefive output powerOnefive output power measured today. 3.52
mW with OD1 filter ==> ~35mW.

  
  86   Thu Nov 28 10:40:29 2019 Loïc AmoudryFixedinfolasers and opticsOptical roomCVBG reference and Eric Cormier calculationThe Stretcher is the "D 24-02-II",
it must be used in double path before the
amplifier injection.
 compresseurs.jpgEtireur.jpgcalcul_Eric.jpg 
  85   Wed Nov 27 13:53:57 2019 Loïc AmoudryFixedinfolasers and opticsOptical roomOnefive output powerThe pump voltage has been increased few
days ago when looking for a modlock of the
laser.
  
  84   Tue Nov 26 16:35:39 2019 Ronic ChicheFixedissuelasers and optics | detectors and electronicsOptical room30Hz noise issueThe 30 Hz noise issue has been solved !

It came from translation stage
of P1 and/or P4.
  
  83   Tue Nov 26 16:21:27 2019 Loïc AmoudryFixedissuevacuumOptical roomPneumatic valvesThe pneumatic valves are now plugged on
the university air network.
The air valve is fully openned for
  
  82   Tue Nov 26 16:11:52 2019 Ronic ChicheFixedissuemechanicsOptical roomFirst Lock with 2nd satge of amplifier : Motor issue ? The 500 ms noise disapeared. We had to
disable the "power save" mode of
the smaract translation stage. AND turn OFF
  
  81   Fri Nov 22 17:56:56 2019 Ronic ChicheFixedissuelasers and optics | detectors and electronicsOptical room30Hz noise issuesince some days, we observe the cavity
is difficult to lock and a strange 30Hz noise
has appeared on the PZT signal which normally
  
  80   Thu Nov 21 11:37:13 2019 Loïc AmoudryFixedinfolasers and opticsOptical roomOnefive Origami 33MHz specsBeam Size Onefive added




 beam_size.xlsxBeam_size_Onefive_33.rar 
  79   Wed Nov 13 15:05:18 2019 Loïc AmoudryFixedreportlasers and opticsOptical roomAmplifier output power  




 courbedichro.PNG 
  78   Wed Nov 13 14:44:56 2019 Loïc AmoudryFixedreportlasers and opticsOptical roomAmplifier output power The ouput power of the ThomX amplifier
has been measured as a function of the 3rd
stage pumps current (0A is 1st and 2nd stage
 dichroic.PNGcourbe.PNGpower.xlsx 
  77   Wed Nov 6 16:11:12 2019 Loïc AmoudryFixedreportlasers and opticsOptical roomSpherical mirrors at closest position. FSR, finesse and beam size.The spherical mirrors are at the closest
position to get a FSR ~=33.3435 MHz. Planar
mirrors are at the largest position.
 data_finesse.isffit_finesse_17000.pngbeamsize.PNGfit.PNG 
  76   Tue Oct 22 09:10:45 2019 Loïc AmoudryFixedreportlasers and opticsOptical roomFirst mode degeneracy on ThomXYesterday, we've observed the first
degeneracy on ThomX cavity at ~115 kW stored.
The shape of the stored power on the oscilloscope
 degenere.PNGdegenere2.PNGdegenere3.PNGtek0000.png100kWThomX.png 
  75   Fri Oct 11 18:49:00 2019 Ronic ChicheFixedinfodetectors and electronicsOptical roomNew locking schemeBefore, the locking scheme was to produce
an error signal with the PDH box, send its
output to the electronic amplifier box and
  
  74   Fri Oct 11 18:42:32 2019 Ronic ChicheFixedissuelasers and optics | detectors and electronicsOptical roomFirst Lock with 2nd satge of amplifier : Finesse issue ?First of all, we used and optical spectrometer
to determine which proportion of pump and
signal is in the injected beam.
  
  73   Thu Oct 10 18:03:10 2019 Ronic ChicheFixedissuemechanicsOptical roomFirst Lock with 2nd satge of amplifier : Motor issue ? Global locking almost clean : tranmission
and reflection are quite noiseless except
the peaks at every 500ms.
 Image1.png 
  72   Thu Oct 10 17:51:26 2019 Ronic ChicheFixedissuelasers and optics | detectors and electronicsOptical roomFirst Lock with 2nd satge of amplifier : Finesse issue ?1st lock today with the second stage of
the amplifier.
~ 300mW of injected power (but which
  
  71   Wed Oct 9 11:41:11 2019 Loïc AmoudryFixedinfolasers and opticsOptical roomOnefive spectrum and CVBG spectrumThe Onefive spectrum has shifted a little
bit to lower lambda. It's still enough
for the experiment (3mW injection of ampli
 191008_spectrumbeforecvbg.PNG191008_spectrumaftercvbg.PNG191008_beamshapeaftercvbgthomx.PNG 
  70   Wed Oct 9 10:16:24 2019 Loïc AmoudryFixedinfolasers and opticsOptical roomFiber injection and onefive output powerFiber injection is finished with the new
ThomX stretching CVBG in double pass (+50%
injection power compared to K-BOX CVBG in
  
  69   Wed Oct 9 10:10:01 2019 Loïc AmoudryFixedinfolasers and opticsOptical roomFree Spectral Range (FSR)FSR is 33.347 MHz @1e-8 mbar

 
  
  68   Wed Oct 9 10:08:24 2019 Loïc AmoudryFixedinfolasers and opticsOptical roomImprovement holder amplifier fiberWe've added a clamp in the 3rd stage
to prevent the pump fiber from moving and
tilting (it was tilting to the left).
 1.png2.png 
  67   Thu Oct 3 18:00:10 2019 Loïc AmoudryFixedreportlasers and opticsOptical roomThomX amplifier M2The ThomX M2 has been measured between
1.5-1.6 for x and y
 Fit_matlab_M2.PNG 
  66   Thu Oct 3 14:00:13 2019 Loïc AmoudryFixedissuecablingOptical roomElectrical trouble (disjunction)The circuit breaker on ThomX cavity drops
@1.5-1.8kW when we turn on 1/2nd
stage of the amplifier or 3rd stage of the
  
  65   Thu Oct 3 13:53:44 2019 Loïc AmoudryFixedreportvacuumOptical roomCavity under vacuum The cavity is right now at 6.5e-8 mbar
(turbo pumps on for 1 night and ionic pumps
for 3h), primary pumps and turbo pumps are
  
  64   Thu Oct 3 13:49:58 2019 Loïc AmoudryFixedinfomechanicsOptical roomPneumatic valvesFrederic and Manu from vacuum group came
this morning to fix again the pneumatic valves
which had a leak again.
  
  63   Mon Sep 30 11:30:32 2019 Ronic ChicheFixedinfolasers and opticsOptical roomFinesse measurementTo complete these observations:

Finesse has been measured
on thursday, right after cleaning the cavity
  
  62   Mon Sep 30 11:20:48 2019 Loïc AmoudryFixedinfolasers and opticsOptical roomDiffusion ULE spherical mirror (S3) vs Fused Silicate injection planar mirror (P1)Observation made with IR Beam Viewer: 

The observation of P1 and S3 simultaneously
while locking shows much higher diffusion
 diffusion.jpg 
  61   Fri Sep 27 16:17:36 2019 Ronic ChicheFixedinfolasers and opticsOptical roomFinesse measurementAfter mirrors were going back from LMA
for cleaning and thermal anealing, they have
been installed in FP cavity for Finesse measurement.
  
  60   Fri Sep 27 10:43:17 2019 Loïc AmoudryFixedreportlasers and opticsOptical roomNew Suprasil mirror from LMA19/09/2019 : email from Chrisophe Michel
about AR coating of LMA mirrors after reading
that Ta2O5 layers can be damaged in vacuum
  
  59   Wed Sep 25 15:49:28 2019 Ronic ChicheFixedissuemechanics | detectors and electronicsOptical roomMotor issueToday again, same problem with axis 9 blocking
the controlling software during the mirror
alignment procedure.
  
  58   Thu Sep 12 16:19:26 2019 Loïc AmoudryFixedreportmechanics | lasers and opticsOptical roomCavity dust source checkSeveral experiments have been done in order
to check the potential source of dust in
the ThomX cavity. For each step, we look
  
  57   Fri Sep 6 14:59:00 2019 Loïc AmoudryFixedinfolasers and opticsOptical roomLMA cleaning techniqueChristophe MICHEL told us more precise
informations about spin coater cleaning.

They always clean with pur water
  
  56   Fri Sep 6 14:48:14 2019 Loïc AmoudryFixedreportmechanics | vacuumOptical roomPrimary vacuum to check dustThe cavity has been cleaned then put under
primary vacuum (primary pump without vacuum
flow control). Dusts presence was checked
 Image3.jpgImage6.jpg 
  55   Tue Sep 3 18:06:29 2019 Loïc AmoudryFixedinfolasers and opticsOptical roomMirrors sent to LMAMirrors have been sent today to LMA for
cleaning and maybe annealing (recuit). 3
ULE of ThomX and the fused silicate for injection
  
  54   Tue Sep 3 18:04:03 2019 Ronic ChicheFixedreportlasers and opticsOptical roomFinesse measurement after mirror cleaning using the spin coaterFollowing finesse measurements (start @10700): 
Clean P1 with SC (water) + isoprop
(wipe) finesse @15000
  
  53   Tue Sep 3 17:51:04 2019 Ronic ChicheFixedissuemechanics | lasers and optics | vacuumOptical roomVessel cleanlinesslooking in the vessel of the FP cavity
using a UV lamp shows a lot of dust... more
dust than outside the cavity !!!
 IMG_20190903_161910.jpg 
  52   Fri Aug 30 17:52:41 2019 Ronic ChicheFixedissuemechanics | detectors and electronicsOptical roomMotor issueToday, Axis 9 (Z-axis of P1) has blocked
the software which drives all the motors.
impossible to bypass the problem.
  
  51   Fri Aug 30 17:46:15 2019 Ronic ChicheFixedreportlasers and opticsOptical roomFinesse measurement after mirror cleaning using the spin coatertoday I cleaned S3 with isopropanol and
then with pure water on spin coater.
Finesse is only 10 700.(coupling 50%
  
  50   Fri Aug 30 09:44:56 2019 Ronic ChicheFixedreportlasers and opticsOptical roomFinesse measurement after mirror cleaning using the spin coaterLast Finesse measurement in air : ~ 17
000 the 20th of may (see logbook)

28th and 29th of august, we cleanned,
  
  49   Mon Jul 29 17:15:35 2019 Loïc AmoudryFixedinfomechanics | lasers and opticsOptical roomSpin coater air supply removed and front panel changedSpin coater firstly needed vacuum and air
supply. The air supply being useless for
our experiments, it has been disabled.
 1.jpg2.jpg3.jpgfront_panel.png 
  48   Thu Jul 4 18:30:39 2019 Loïc AmoudryFixedreportlasers and opticsOptical room2nd stage output power validated Onefive output power : 28mW
Power before fiber injection :
7.8mW
 190704_2ndstage6A_spectrum.PNG 
  47   Thu Jul 4 18:28:55 2019 Loïc AmoudryFixedissuelasers and opticsOptical roomOnefive 33MHz unmodelockedOscillator randomly unmodelocked on 3rd
july afternoon (during oscillator power
measurement, maybe a reflection from the
  
  46   Thu Jul 4 10:17:46 2019 Ronic ChicheFixedinfodetectors and electronicsOptical roomNew design for PDH boxesA new design has been studied for the 5
PDH boxes to better match the low (33MHz)
repetition rate of the ThomX laser.
 2019-06-14_-_PDH_Maurice_modifié.pdf 
  43   Tue Jun 18 20:44:34 2019 Huan WangFixedinfolasers and opticsOptical roomtelescope for Koherastelescope of Koheras is removed, information
record here:

- distance between collimator edge
 2019.06.18_telescope_of_Koheras.jpg 
  42   Wed Jun 12 17:49:20 2019 Loïc AmoudryFixedinfolasers and opticsOptical roomPolarizationPolariztion measured with Input vertically/horizontally polarized
(~100% DOLP)

- Transmission (P4) locked on cavity
 Polar_horiz_trans_P4.PNGPolar_vert_trans_P4.PNGPolar_vert_input.PNG 
  41   Wed Jun 12 12:07:11 2019 Loïc AmoudryFixedreportmechanics | lasers and opticsOtherAmplifier mission BordeauxM² mesuré à 10W.
M²x = 1.17
M²y = 1.14
 Ampli_ThomX.PNGM2_ThomX.png 
  40   Tue Jun 11 18:03:10 2019 Loïc AmoudryFixedreportmechanics | lasers and opticsOtherAmplifier mission BordeauxVoyage Bordeaux au CELIA avec Jérôme
LHERMITE (Loïc et Titoutan)

1er jour (34°) :
 1st_and_2nd_stage.jpg3rd_stage_pumps.jpg3rd_stage_signal.jpg 
  39   Thu May 23 17:30:03 2019 Loïc AmoudryFixedreportlasers and opticsOptical roomTransmission of Sapphire mirrorSee image.  Sapphire_transmission.PNG 
  38   Thu May 23 10:10:56 2019 Ronic ChicheFixedreportlasers and opticsOptical roomFinesse measurement by decay time technique5 Files attached:

- Note on the technique and results
for the present cavity on 2019, May 21th
 2019-05-21_-_Finesse_measurement_by_decay_time_technique.docxtek0005CH1.isftek0006CH1.isfplotdata.mmyerror.m 
  37   Tue May 21 17:49:30 2019 Loïc AmoudryFixedreportlasers and opticsOptical roomFinesse after cleaning (new suprasil mirror)15/05/19-20/05/19:

Cleaning of the mirrors:

Initial finesse 14000 @air
  
  36   Tue May 21 17:44:46 2019 Loïc AmoudryFixedreportlasers and opticsOptical roomNew Suprasil mirror from LMA14/05/19:

New Suprasil mirror received. It
will replace the S-BOX suprasil mirror on
  
  35   Thu Apr 18 16:17:53 2019 Loïc AmoudryFixedissuelasers and opticsOptical room33MHz Onefive power overtime decreasePower of the 33MHz Onfive decreases over
time. Have to pay attention to that.
Note that air dryers have never been
 180410_power_33mhz_1jours.PNG180925_Power.JPG190416_power_ouput_Onefive.PNG 
  34   Thu Apr 18 16:07:23 2019 Loïc AmoudryFixedinfolasers and opticsOptical roomInjection of 33MHz Onefive through fiberOutput power of the Onefive, and power
after injection and different components
have been measured.
 power_ouput_Onefive.PNGpower_after_injection_and_point9dB_blue_fiber.PNGpower_after_halfwaveplate_and_injection_and_point9dB_blue_fiber.PNGpower_after_halfwaveplate_and_injection_and_point9dB_blue_fiber_and_EOM_NIR-MPX-LN-0dot1.PNGpower_after_halfwaveplate_and_injection_and_point9dB_blue_fiber_and_EOM_NIR-MPX-LN-02.PNG 
  33   Wed Apr 10 13:11:46 2019 Loïc AmoudryFixedreportlasers and opticsOptical roomMirror's cleaning and finesseSummary of what have been cleaned
the last week:

P1 with isopropanol, finesse 11000
  
  32   Mon Apr 8 11:55:40 2019 Loïc AmoudryFixedreportlasers and opticsOptical roomP4 cleaned and finesse measurementP4 cleaned with isopropanol.

Finesse measured afterward: ~=13
000 (clear increase)
  
  31   Mon Apr 8 10:18:31 2019 Loïc AmoudryFixedreportlasers and opticsOptical roomFinesse after 2daysFinesse measured this morning after P1
SUPRASIL being into the cavity for two
days. In order to check if it's getting
  
  30   Fri Apr 5 11:28:39 2019 Loïc AmoudryFixedreportlasers and opticsOptical roomFinesse with P1 SUPRASILP1 SUPRASIL has been installed instead
of P1 Sapphire. It has been cleaned 3 times
on each face with wipe+isopropanol before
 190404_mode_size_with_P1_SUPRASIL.PNG190404_mode_fit_with_P1_SUPRASIL.PNGtek00000.pngtek00002.png 
  29   Fri Apr 5 11:18:47 2019 Loïc AmoudryFixedreportlasers and opticsOptical roomTransmission of the mirrorsP1 transmission out of the mount (means
angle of the mirror is not the real angle):

Pin = 3.2 mW
  
  28   Thu Apr 4 09:42:12 2019 Loïc AmoudryFixedreportlasers and opticsOptical roomTransmission of the mirrorsAfter verification, transmission of P1
correspond to ~150ppm.

The 1337ppm come from a beam leakage.
  
  27   Tue Apr 2 18:05:46 2019 Loïc AmoudryFixedinfolasers and opticsOptical roomBeam size at closest spherical mirrors positionS3 and S2 @ +1 640 000 and P1 and P4 @
-825 000

Diameter in x: 4.7mm
  
  26   Tue Apr 2 18:03:31 2019 Loïc AmoudryFixedreportlasers and opticsOptical roomTransmission of the mirrorsWe openned the cavity, removed S2 and measured
trans of P1 and same for S2.

Pin ~= 3.91 mW
  
  25   Tue Apr 2 17:59:18 2019 Loïc AmoudryFixedreportlasers and opticsOptical roomFinesse after removing wires19/04/01: We removed the wires from the
beam path in the cavity. Finesse stayed at
3400. FSR: 33.342 MHz.
  
  24   Fri Mar 29 18:33:15 2019 Ronic ChicheFixedissuemechanics | lasers and opticsOptical roomAlignment procedurewe did again the complete alignment procedure
starting with iris and optimizing injection
motors Ma and Mb, then installing mirror
  
  23   Thu Mar 28 09:25:58 2019 Loïc AmoudryFixedissuemechanicsOptical roomMotors Z axis reversedAll Z motors (for P1, S2, S3 and P4) have
been initialized again with a proper HOME
command with their own controller  with
  
  22   Tue Mar 26 18:32:40 2019 Loïc AmoudryFixedreportmechanics | lasers and optics | cablingOptical roomWires in laser pathThere was some ceramic wires close to the
beem path right before P4. We moved them
away (we can imagine they could move again
 before.jpgafter_wire_displaced.jpg 
  21   Tue Mar 26 18:26:32 2019 Loïc AmoudryFixedreportlasers and opticsOptical roomCheck of mirrors and coating directionsDirection of HR face of P1 and P4 have
been checked, there was no problem. The mirrors
are in the good direction and the coating
 ThomX_P4.jpg 
  20   Fri Mar 22 17:53:10 2019 Loïc AmoudryFixedreportlasers and optics | vacuumOptical roomCavity at atm pressureDry air injected into the cavity.

Lock has been proceeded without
any trouble. ~~4000 finesse. Considered to
 finessealair.isf 
  19   Tue Mar 19 17:01:52 2019 Loïc AmoudryFixedissuemechanicsOptical roomMotors Z axis reversedS2 and S3 z-axis are initially at 1/4 (5mm/20mm) of
there range over ~20mm range. This is meant
to be able to spread them up to ~15mm in
  
  18   Tue Mar 19 16:35:32 2019 Loïc AmoudryFixedreportlasers and opticsOptical roomBeam size and finesseFSR initiale : 33.34 MHz (S3 = -825000
et S4 = -825000)

Beam size initiale : wx=2.05mm
  
  17   Tue Feb 19 15:50:08 2019 Loïc AmoudryFixedinfomechanicsOptical roomMotors connexionsMotors are connected. The true mirror's
name are P1 for injection mirrors, S2, S3
and P4. (S=spherical, P=planar).
 Validation_moteurs.jpg 
  16   Thu Feb 14 18:20:52 2019 Loïc AmoudryFixedreportmechanics | lasers and opticsOptical roomBasic alignment & alignment motors check14/02/19: The 4 motors but Mby control
works. Mby motor home does not bring
it to its "middle" position
  
  15   Fri Feb 1 14:10:25 2019 Loïc AmoudryFixedreportlasers and opticsOtherMirrors sent to LMA30/01/19 - As LMA people came, we discussed
about the spots on ThomX mirrors which should
be clean. As mentionned in "SBOX commissioning",
  
  14   Fri Feb 1 13:39:21 2019 Loïc AmoudryFixedreportlasers and opticsOptical roomMirrors checked with binocular microscope29/01/19 - ThomX mirrors have also been
checked with binocular microscope. They shown
the same spots as S-BOX mirrors. 
 41_THOMX_SphericalZoom1x.jpg49_THOMX_M1ReflectiveZoom4x.jpg 
  13   Fri Feb 1 13:20:47 2019 Loïc AmoudryFixedreportutilitiesOptical roomEnd of cleaning, plastic fixed on cavity08/02/19 - End of the cleaning process.  covered_by_plastic.pngcovered_by_plastic2.png 
  12   Wed Jan 16 14:54:14 2019 Loïc AmoudryFixedreportlasers and optics | utilitiesOptical roomCleaning outside IP cavityFrom 7th january to 11th january.

 
 Avant_nettoyage.jpgApres_une_semaine_nettoyage_lingettes_et_brosseadents.jpgSans_UV_traces_scotch_nettoyees_apres_baking.jpg 
  11   Fri Dec 21 13:55:09 2018 Loïc AmoudryFixedinfovacuumOptical roomEnd of vacuum test and cavity ready for cleaningVacuum tests finished on 19 december
2018.

Spent last two days to discuss
 IMG_20181221_1110152.jpgIMG_20181221_1119082.jpgIMG_20181221_1113122.jpgIMG_20181221_1124492.jpg 
  10   Mon Nov 26 15:18:49 2018 Ronic ChicheFixedinfovacuumOptical roomEtuvage cavité THOMXMail de Bruno Mercier
du 19/11/2018 :


Une première cavité
  
  9   Mon Oct 22 11:29:41 2018 Ronic ChicheFixedinfomechanicsOptical roomRemontage des vérinsMail de Yann du 8/10/2018 :

Bonjour,
Tous les vérins sont maintenant
  
  8   Mon Oct 22 11:27:35 2018 Ronic ChicheFixedinfomechanicsOptical roomRemontage mécaniqueMail de Yann du 12/10/2018 :

Je vous fais le bilan des actions
effectuées :
  
  7   Mon Oct 22 11:03:22 2018 Ronic ChicheFixedinfovacuumOptical roomDétection de fuiteMail de Bruno Mercier du 18/10/2018 :

Un petit CR
de la journée:
  
  6   Fri Oct 5 10:17:30 2018 Ronic ChicheFixedreportmechanics | cablingOptical roomtest des vérins ISP 20mm et 6mm 




  
  5   Wed Oct 3 11:28:46 2018 Ronic ChicheFixedreportmechanics | cablingOptical roomtest des vérins ISP 20mm et 6mmAprès avoir utilisé la chaine
: driver ISP - cable ISP DB9 - Feedthrough
enceinte DB9-DB9 - cable perlé DB9-SUB-C
  
  4   Tue Oct 2 18:00:36 2018 Ronic ChicheFixedissuemechanics | cabling | softwareOptical roomtest des vérins ISP  




 CABLAGE_VERINS.pdf 
  3   Tue Oct 2 16:23:54 2018 Ronic ChicheFixedissuemechanics | cabling | softwareOptical roomtest des vérins ISP * les vérins de 20mm (axe Z) ont
été testés sur table
grace à une rallonge SUB-C - DB9,
  
  2   Thu Sep 27 15:43:48 2018 Ronic ChicheFixedinfolasers and opticsOptical roomOnefive Origami 33MHz specs - Polarisationone rotate a lambda/2 before a PBS and
meausure the refected power:

Pmax=35.6 mW
 polar_onefive_33MHz_polarisation.jpg 
  1   Tue Sep 25 19:17:43 2018 Loïc AmoudryFixedinfolasers and opticsOptical roomOnefive Origami 33MHz specsPower during ~20h, power after turn on,
spectrum image and excel datas, polarisation
and pulse length.
 6x 