245
|
Wed Sep 10 11:27:45 2025 |
Alice Renaux | Under Process | report | lasers and optics | Optical room | new cavity | The 2-mirrors cavity has 460ppm of transmission
for M1 and 10ppm for M2 which should exhibit
a Finesse around 13400. |
|
|
244
|
Tue Sep 9 21:23:11 2025 |
Alice Renaux | Under Process | report | lasers and optics | Optical room | new cavity | Yesterday, we changed the M1 mirror to
a 161185 Gamma
Factory mirror of transmission 460ppm, the |
|
|
243
|
Thu Sep 4 17:56:50 2025 |
Alice Renaux | Under Process | report | lasers and optics | Optical room | Finesse measurement | (Finesse 2651 is consistent with that obtained
from the mirrors' transmission coefficients,
which is about 3100.) |
|
|
242
|
Thu Sep 4 17:52:03 2025 |
Alice Renaux | Under Process | report | lasers and optics | Optical room | Finesse measurement | Today, with Ronic, we measured the finesse
of the 2-mirror cavity witht the NKT CW laser.
We were able to perfrom the measurement |
|
|
241
|
Thu Sep 4 17:35:50 2025 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | Optical room | Installation of the avalanche photodiode | After installing the 2nd EOM, we had some
trouble to be able to lock again.
One possible reason was the very low |
|
|
240
|
Wed Sep 3 18:10:34 2025 |
Alice Renaux | Under Process | report | lasers and optics | Optical room | Successful lock (finally !) | Today, with Ronic, we managed to get a
successful lock with the NKT laser by setting
up a new PDH box from scratch (photodiode |
|
|
239
|
Thu Aug 28 15:29:00 2025 |
Alice Renaux | Under Process | report | lasers and optics | Optical room | 2-mirror cavity locking | In June, we encountered some problems regarding
the transmission and error signals (see images
here), |
 |
|
238
|
Mon Jun 23 14:38:33 2025 |
Ronic Chiche | Under Process | issue | mechanics | lasers and optics | detectors and electronics | Optical room | first attempt to lock | With Alice, we installed the EOWaves oscillator
to be locked on the FP-cavity (T1 ~ 2500ppm,
T2 ~ 10ppm => F ~ 2500) |
  |
|
237
|
Fri Jun 13 20:10:00 2025 |
Alice Renaux | Fixed | report | lasers and optics | Optical room | Damaged mirrors test | Today with Dorian we tested three mirrors
with which we previously haven't been
able to obtain any resonance or optical beating |
|
|
236
|
Wed May 28 18:27:27 2025 |
Alice Renaux | Under Process | report | lasers and optics | Optical room | 2-mirror cavity full setup | Today with Ronic, we changed the FP cavity's
mirrors to Layertek (Gamma Factory) mirrors
: |
|
|
235
|
Wed May 28 10:55:15 2025 |
Alice Renaux | Under Process | report | lasers and optics | Optical room | 2-mirror cavity alignment | The NKT laser PZT sensitivity is ~0.09pm/V
of wavelength variation, which is equivalent
to ~ 25MHz/V |
|
|
234
|
Tue May 27 18:12:22 2025 |
Alice Renaux | Under Process | report | lasers and optics | Optical room | 2-mirror cavity alignment | Yesterday and today, I replaced the OEWaves
CW laser with the NKT CW laser. Its screen
does not display anything, so it has to be |
|
|
233
|
Fri Mar 21 18:27:36 2025 |
Alice Renaux | Under Process | report | mechanics | lasers and optics | Optical room | 2-mirror cavity alignment | At the beginning of the week, I installed
a half-wave plate, a beamsplitter cube and
a quarter-wave plate, as well as the end-of-cavity |
|
|
232
|
Tue Mar 4 18:51:57 2025 |
Ronic Chiche | Under Process | info | mechanics | lasers and optics | Optical room | Alignment of a 2-mirror FP cavity | today with Alice,
- we measured the height of the
SBOX windows center : 140mm from the optical |
|
|
231
|
Tue Mar 4 18:33:26 2025 |
Ronic Chiche | Fixed | info | utilities | Optical room | optical table cleaning | now, it seems the table is clean enough
(dust meter counts 0 particles) to install
a 2 mirrors FP-cavity. |
|
|
230
|
Mon Dec 16 10:20:56 2024 |
Ronic Chiche | Under Process | issue | lasers and optics | Optical room | CELIA 100W laser amplifier repair | friday morning, we add a zoom call with
Jerome Lhermite about the amplifier repair.
he approximately confirmed the amplifier |
|
|
229
|
Fri Dec 6 16:59:57 2024 |
Ronic Chiche | Fixed | info | utilities | Optical room | optical table cleaning | this afternoon, we checked the dust meter
which is at 0 for 1 and 5µm dust particles
but ~ 2000-3000 for 0.3µm particles. |
|
|
228
|
Tue Dec 3 13:51:52 2024 |
Ronic Chiche | Fixed | info | utilities | Optical room | optical table cleaning | this morning with Alice and Daniele, we
removed all the optics elements and equipments
from the SBOX optical table and started to |
  |
|
227
|
Fri Nov 29 16:50:04 2024 |
Alice Renaux | Under Process | info | lasers and optics | Optical room | Menhir 216MHz laser | The Menhir 216MHz laser has been put back
in place on the cavity table. Its output
power is measured to be 160mW with an attenuator. |
 |
|
226
|
Fri Nov 29 12:06:05 2024 |
Alice Renaux | Fixed | info | lasers and optics | Optical room | Menhir 160MHz laser | The Menhir 160MHz has been put back in
place on the CELIA amplifier setup. Its output
power is measured to be 150-160mW with an |
   |
|
225
|
Wed Oct 2 18:12:54 2024 |
Ronic Chiche | Under Process | issue | lasers and optics | Optical room | CELIA 100W laser amplifier repair | this afternoon, we saw some electric cables
badly connected to their power supply.
we fixed it by soldering them together |
   |
|
224
|
Wed Oct 2 10:12:55 2024 |
Ronic Chiche | Under Process | issue | lasers and optics | Optical room | CELIA 100W laser amplifier repair | this morning with Alice, we sent the Menhir
160MHz injected in a fiber (with 6mW at the
end of a long fiber) into the laser amplifier, |
|
|
223
|
Wed Jun 19 10:38:00 2024 |
Ronic Chiche | Fixed | info | mechanics | lasers and optics | detectors and electronics | Optical room | D-shape mirrors positionning status | summary:
- the motors used to move the D-shape
are the Newport Picomotors 8303-V |
|
|
222
|
Fri May 17 15:02:01 2024 |
Xinyi Lu | Fixed | info | lasers and optics | Optical room | high-power experiments of 2-mirror cavity | Here's a summary of our experiment
last week:
The initial telescope position: |
6x |
|
221
|
Thu May 16 18:51:17 2024 |
Xinyi Lu | Fixed | info | lasers and optics | Optical room | high-power experiments of 2-mirror cavity | here is a Matlab code to try to optimize
the telescope for a hot cavity,
taking into account the thermal lens |
  |
|
220
|
Mon May 6 18:38:18 2024 |
Xinyi Lu | Fixed | info | lasers and optics | Optical room | high-power experiments of 2-mirror cavity | Today, Ronic, Daniele and I redo the high-power
2-mirror cavity experiments, and the results
are shown in the table (Figure 1 and |
   |
|
219
|
Thu Apr 25 22:12:25 2024 |
Xinyi Lu | Fixed | info | lasers and optics | Optical room | 2 mirror cavity high power experiments | Today, Ronic and I recorded some intracavity
power and cavity mode size as shown in Fig.
1. |
   |
|
218
|
Tue Apr 16 18:38:04 2024 |
Xinyi Lu | Fixed | info | lasers and optics | Optical room | Fiber injection, spectrum and connection of 2nd stage amplifier | Today, Daniele and I injected the laser
into the fiber, installed the telescope,
connected the second stage of the amplifier, |
 |
|
217
|
Mon Apr 15 18:19:40 2024 |
Xinyi Lu | Fixed | info | lasers and optics | Optical room | Finesse measurement of 2-mirror cavity | - Today Daniele and I cleaned the spherical
mirror by wiping it with alcohol,
and the finesse increased to 47k |
|
|
216
|
Fri Apr 12 17:18:15 2024 |
Xinyi Lu | Fixed | info | lasers and optics | Optical room | Install 2-mirror cavity | Today Viktor and I completed the installation
of the two-mirror cavity and managed
to lock and measure the finesse. |
  |
|
215
|
Thu Apr 11 19:09:21 2024 |
Xinyi Lu | Fixed | info | lasers and optics | Optical room | Install 2-mirror cavity | Today, Viktor and I started installing
the two-mirror cavity.
- Firstly, we cleaned the environment |
 |
|
214
|
Wed Apr 10 11:35:54 2024 |
Xinyi Lu | Fixed | info | lasers and optics | Optical room | Finesse measurement (35k) | These days, Ronic, Aurélien
and I use OEwaves CW laser to measure the
finesse of SBOX. We made 5 measurements |
 |
|
213
|
Tue Apr 9 08:57:22 2024 |
Xinyi Lu | Fixed | info | lasers and optics | Optical room | Different cavity modes & Pulse width | Additional information:
The pulse duration has been performed
in RF on a UPD-70-IR2-P photodiode from Alphalas |
 |
|
212
|
Mon Apr 8 08:34:54 2024 |
Xinyi Lu | Fixed | info | lasers and optics | Optical room | Different cavity modes & Pulse width | - Last week, we obtained three curves of
the variation of different cavity modes with
power (Fig. 1). By comparing the gain for |
 |
|
211
|
Thu Apr 4 21:48:16 2024 |
Xinyi Lu | Fixed | info | lasers and optics | Optical room | Larger beam size & Spectrum | - We re-measured the gain before moving
the mirror. Gain ~9000 was achieved at 3A,
but as the power increased, the gain dropped |
 |
|
210
|
Wed Apr 3 21:37:07 2024 |
Xinyi Lu | Fixed | info | lasers and optics | Optical room | High power experiments (550kW) | - Today we moved the position of the D-shaped
mirror at 6A. When motor1 (vertical) is 0.2mm
away from the spot, the power in the cavity |
  |
|
209
|
Wed Apr 3 08:53:33 2024 |
Xinyi Lu | Fixed | info | lasers and optics | Optical room | High power experiments (520kW) | Yesterday, Ronic, Xing, Qili and I achieved
a more stable 520kW power at 7.5A (71W injection)
by optimizing the alignment and locking parameters. |
   |
|
208
|
Tue Apr 2 08:39:17 2024 |
Xinyi Lu | Fixed | info | lasers and optics | Optical room | High power experiments (500kW) | Last week, we achieved a stable intracavity
average power of 500kW, limited by amplifier
power. The experimental data are shown |
  |
|
207
|
Fri Mar 29 16:23:34 2024 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | Optical room | 100W CELIA laser amplifier "Power vs Pump current" curve | We measured again the 100W CELIA laser
amplifier with a pump current until 8A.
as the first current pump of the |
|
|
206
|
Thu Mar 28 19:03:55 2024 |
Xinyi Lu | Fixed | info | lasers and optics | Optical room | Amplifier power and mirror transmission | Today, Ronic, Daniele, Aurélien
and I measured the amplifier power and mirror
transmission. |
 |
|
205
|
Wed Mar 27 22:37:02 2024 |
Xinyi Lu | Fixed | info | lasers and optics | Optical room | High power experiments (272kW) | Today, Ronic and I achieved 272kW inside
the cavity at 7.5A. The coupling maintained
60%-70%. |
  |
|
204
|
Wed Mar 27 09:47:37 2024 |
Xinyi Lu | Fixed | info | lasers and optics | Optical room | High power experiments (200kW) | all the injection power in the chart have
not been measured recently but during the
Loic thesis period. |
|
|
203
|
Tue Mar 26 19:36:48 2024 |
Xinyi Lu | Fixed | info | lasers and optics | Optical room | High power experiments (200kW) | These days, Ronic and I achieved 200kW
inside the cavity and 70% coupling efficiency.
- By optimizing the telescope, |
 |
|
202
|
Thu Mar 21 17:32:59 2024 |
Xinyi Lu | Fixed | info | lasers and optics | Optical room | Polarization issue & 50kW with 22W injection | Today, Ronic and I lock the cavity on the
other polarization and achieved 50kW with
22W injection. |
 |
|
201
|
Thu Mar 21 09:26:50 2024 |
Xinyi Lu | Fixed | info | lasers and optics | Optical room | Polarization issue | just to add some details
:
about the S and P polarization |
|
|
200
|
Wed Mar 20 18:22:53 2024 |
Xinyi Lu | Fixed | info | lasers and optics | Optical room | Polarization issue | These days, Ronic, Aurélien, Fatematuj
and I have been doing some tests on polarization
issue, trying to see if it is possible to |
  |
|
199
|
Wed Mar 13 19:44:41 2024 |
Xinyi Lu | Fixed | info | lasers and optics | Optical room | Injection at the amplifier current of 2 A | Today, Ronic and I optimized the locking at
the amplifier current of 2 A and
obtained ~ 21 kW inside |
|
|
198
|
Tue Mar 12 22:13:47 2024 |
Xinyi Lu | Fixed | info | lasers and optics | Optical room | Coupling efficiency improvement | - Today, Ronic and I locked at the amplifier
current of 2 A and obtained ~60% coupling
after optimizing the CEP (see Figure |
|
|
197
|
Fri Mar 8 18:04:43 2024 |
Xinyi Lu | Fixed | info | lasers and optics | Optical room | Coupling efficiency improvement | Today, Ronic and I installed the new telescope
and locked the cavity.
- We locked at the amplifier |
|
|
196
|
Thu Mar 7 18:55:42 2024 |
Xinyi Lu | Fixed | info | lasers and optics | Optical room | Coupling efficiency improvement | - These days, Ronic, Fatematuj and I measured
the beam parameters of the output of the
third-stage amplifier. |
|
|
195
|
Wed Feb 28 17:26:46 2024 |
Ronic Chiche | Fixed | info | lasers and optics | software | Optical room | 100W CELIA laser amplifier "how's to" document | 1st version of the document.
if some information is not correct
or missing, give any comment by replying |
|
|
194
|
Tue Feb 27 17:51:56 2024 |
Xinyi Lu | Fixed | info | lasers and optics | Optical room | Amplified laser injection | In the last two days, Ronic and I connected
the amplifier and locked the cavity.
- We installed an iris on the output |
|
|
193
|
Mon Feb 26 16:53:24 2024 |
Xinyi Lu | Fixed | info | lasers and optics | Optical room | Menhir pulsed laser locking | here is the code to get this last curve
|
|
|
192
|
Mon Feb 26 08:58:33 2024 |
Xinyi Lu | Fixed | info | lasers and optics | Optical room | Menhir pulsed laser locking | Last week, Ronic and I focused on CEP
measurements of the menhir laser.
Measurements without |
 |
|
191
|
Wed Feb 21 18:09:11 2024 |
Xinyi Lu | Fixed | info | lasers and optics | Optical room | Menhir pulsed laser locking | Here is a simulation of the relative FP-cavity
gain vs the CEP for a Finesse of 23000 and
taking into account the Menhir laser optical |
 |
|
190
|
Wed Feb 21 17:33:59 2024 |
Xinyi Lu | Fixed | info | lasers and optics | Optical room | Menhir pulsed laser locking | These days, Ronic, Daniele and I achieved
stable cavity locking with the menhir pulsed
laser. |
  |
|
189
|
Wed Feb 14 17:20:26 2024 |
Xinyi Lu | Fixed | info | lasers and optics | Optical room | Cleaning of Mirrors | - Today, Daniele and I cleaned the
cavity inside, recleaned the M2 and
M4 and their mounts, optimized the locking, |
|
|
188
|
Tue Feb 13 17:33:28 2024 |
Xinyi Lu | Fixed | info | lasers and optics | Optical room | Cleaning of Mirrors | Today, Daniele and I cleaned mirrors one
by one using pure water, alcohol, and the
spin coater. Here are the measurements of |
 |
|
187
|
Mon Feb 12 17:17:04 2024 |
Xinyi Lu | Fixed | info | lasers and optics | Optical room | Cleaning of Mirrors | - Today we cleaned the environment and
put the spin coater and microscope inside
the airflow. |
|
|
186
|
Fri Jan 26 17:33:05 2024 |
Xinyi Lu | Fixed | info | lasers and optics | Optical room | Cleaning of Mirrors | Today Daniele, Ronic and I cleaned the
mirrors and locked the cavity. However, the
finesse was only 13,000 because of the not |
|
|
185
|
Wed Jan 24 20:33:27 2024 |
Xinyi Lu | Fixed | info | lasers and optics | Optical room | Install new mirrors | Yesterday we checked the mirrors with
UV light and there was some dust on the mirrors,
especially M2. |
|
|
184
|
Mon Jan 22 18:18:01 2024 |
Xinyi Lu | Fixed | info | lasers and optics | Optical room | Install new mirrors | - Today, Ronic and I changed the signal
generator to a low-noise one (with a delay
time of only 0.5 us). Then we moved |
|
|
183
|
Thu Jan 18 22:14:03 2024 |
Xinyi Lu | Fixed | info | lasers and optics | Optical room | Install new mirrors | - In the last two days, Ronic and I installed
new mirrors after cleaning the environment,
and locked the cavity. |
  |
|
182
|
Wed Jan 17 21:11:59 2024 |
Xinyi Lu | Fixed | info | lasers and optics | Optical room | Install new mirrors | Today, Ronic and I installed the new mirrors
and got resonance. We can see the oscillations
in this high-finesse case. We haven't |
  |
|
181
|
Tue Jan 16 18:42:42 2024 |
Xinyi Lu | Fixed | info | lasers and optics | Optical room | FSR and Finesse measurement | - Today, Ronic and I measured the finesse
and FSR after optimizing the locking. FSR
was adjusted to 160.27 MHz to match the pulsed |
 |
|
180
|
Mon Jan 15 19:19:00 2024 |
Xinyi Lu | Fixed | info | lasers and optics | Optical room | Coupling efficiency improvement | - We got 30% coupling efficiency by installing
a set of telescopes, adjusting the polarization
and optimizing the alignment. The diameter |
 |
|
179
|
Wed Jan 10 18:35:46 2024 |
Xinyi Lu | Fixed | info | lasers and optics | Optical room | Coupling efficiency improvement | - Recently we have focused on improving
the coupling efficiency. Without the telescope,
the original coupling efficiency was less |
 |
|
178
|
Wed Dec 20 10:45:37 2023 |
Xinyi Lu | Fixed | report | lasers and optics | Optical room | Mounts installation and cavity alignment | - Over the last few days, Viktor, Ronic
and I have reinstalled the mounts and realigned
the cavity with CW laser and old mirrors. |
  |
|
177
|
Thu Dec 14 17:52:53 2023 |
Xinyi Lu | Fixed | report | lasers and optics | Optical room | Mounts installation and cavity alignment | Over the past few days, Viktor, Ronic and
I have continued to align the cavity.
We installed 4 mirrors and monitored the |
 |
|
176
|
Fri Dec 8 18:59:24 2023 |
Xinyi Lu | Fixed | report | lasers and optics | Optical room | Mounts installation and cavity alignment | Over the last two days, Viktor, Ronic and
I have started to install the mirror mounts
and try to align the cavity. |
|
|
175
|
Thu Dec 7 09:30:03 2023 |
Ronic Chiche | Fixed | info | mechanics | lasers and optics | detectors and electronics | software | Optical room | new setup for the 160MHz Menhir oscillator | from the begining of the week, Xinyi, Aurélien,
Viktor and myself started to install a new
setup for the Menhir 160MHz oscillator. |
  |
|
174
|
Thu Dec 7 09:09:27 2023 |
Ronic Chiche | Fixed | info | lasers and optics | ThomX igloo | New mirrors batch informations | the 2 files describe the specfications
for the 16 mirrors ordered (4 for ThomX +
spare, 4 for SBOX + spare) and the measurements |
  |
|
173
|
Fri Jan 6 12:33:18 2023 |
Ronic Chiche | Fixed | info | lasers and optics | Optical room | Laser Menhir reinstallation + CVBG + fiber injection | The lab purchased the Menhir laser @ 216MHz.
it has been sent back to Menhir
photonics for inspection, and then is now |
|
|
172
|
Wed Sep 28 18:43:51 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | M2 ThomX spherical Cleaning | Today, M2 Spherical-3 from ThomX that was
installed inside the SBox was removed, there
was one big dust on the surface of the mirror, |
6x |
|
171
|
Tue Sep 27 19:30:49 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | M1 Gamma Factory | In the morning, Vacuum broken and rotated
M1 ThomX 90 degrees clockwise, locked the
cavity in air and we observe a degeneracy |
  |
|
170
|
Mon Sep 26 16:15:06 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | M1 ThomX used while shifted from damaged spot | On Wednesday 21st , I opened the cavity
did an additional 2 mm shift of the injection
mirror and put it under vacuum again. |
   |
|
169
|
Wed Sep 21 12:10:07 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | M1 ThomX used while shifted from damaged spot | To compare between the 2 images of the
cavity mode:
the mode by itself has |
|
|
168
|
Tue Sep 20 12:50:40 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | M1 ThomX used while shifted from damaged spot | Yesterday , we locked the cavity and we
see a sign of a high finesse on the transmission
signal, but no measurement of Finesse was |
   |
|
167
|
Fri Sep 16 17:47:56 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | Damage on mirror surface | ThomX injection mirror has been cleaned
and placed again inside the optical cavity.
This time to avoid the damaged |
|
|
166
|
Fri Sep 16 15:56:45 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | Damage on mirror surface | a better image of the damaged spot, image
taken with the arrow for the reflective surface
facing the other direction (image shows position) |
   |
|
165
|
Wed Sep 14 17:21:59 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | Power storage In Cavity | We improved the lock using the alignment,
polarization and CEP , the maximum we got
was ~ 12% coupling |
|
|
164
|
Wed Sep 14 16:16:08 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | Power storage In Cavity | The cavity was locked under vacuum, coupling
is approximately < 10%
The lock was relatively easy and |
 |
|
163
|
Tue Sep 13 19:31:14 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | liPower storage In Cavity | After changing the mirror M1 and cleaning
the 2 mirrors
They were placed in the cavity |
|
|
162
|
Tue Sep 13 19:26:27 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | Damage on mirror surface | After discussing, we have decided against
shifting the mirror to avoid the time lost.
We changed the injection mirror |
|
|
161
|
Mon Sep 12 18:50:57 2022 |
Manar Amer | Fixed | issue | lasers and optics | Optical room | Damage on mirror surface | Tomorrow will try to shift the injection
mirror to avoid hitting the damaged spot.
|
|
|
160
|
Mon Sep 12 18:49:42 2022 |
Manar Amer | Fixed | issue | lasers and optics | Optical room | Damage on mirror surface | Following the storage of ~ 50 kW inside
the cavity and a sudden drop in transmitted
power from the cavity |
  |
|
159
|
Mon Sep 12 17:00:35 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | Power storage In Cavity | at max stage we reached at 2.5
A on the diodes we have
8000 gain , coupling ~ |
 |
|
158
|
Mon Sep 12 16:27:14 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | Power storage In Cavity | Power increased in the amplifier
reflective filters added at the
transmission point to be able to have signal |
|
|
157
|
Fri Sep 9 19:03:58 2022 |
Ronic Chiche | Fixed | info | mechanics | lasers and optics | detectors and electronics | Optical room | D-shape mirrors positionning status | The cavity box is vacuum pumped at 6*10^-2
mbar.
|
|
|
156
|
Fri Sep 9 18:35:07 2022 |
Ronic Chiche | Fixed | info | mechanics | lasers and optics | detectors and electronics | Optical room | D-shape mirrors positionning status | This afternoon we opened the cavity and
put the D-shape mirrors at their correct
place, close to the beam. |
|
|
155
|
Fri Sep 9 15:47:46 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | Power storage In Cavity | At transmission power of 42 mW, coupling
60%, we see fundamental mode with a degeneracy
The D-shape motors were moved to |
|
|
154
|
Fri Sep 9 14:44:35 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | Power storage In Cavity | We start of power output from amplifier
of 1W with only the first and second stage
on then we start with the third stage power |
|
|
153
|
Fri Sep 9 12:49:44 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | Locking Amplifier with Cavity | Alignment was improved to ~ 1.2 V on the
photodiode.
Only the second stage was on with |
|
|
152
|
Fri Sep 9 12:45:19 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | Locking Amplifier with Cavity | image of the lock with Coupling of ~ 60%
|
|
|
151
|
Fri Sep 9 11:50:17 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | Locking Amplifier with Cavity | We locked the cavity, and it is stable
using the Transmission,
the high frequency that we thought |
|
|
150
|
Thu Sep 8 18:28:51 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | Locking Amplifier with Cavity | We wanted to increase the power of the
amplifier to measure the transmission output
at M2, |
|
|
149
|
Thu Sep 8 14:58:51 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | Locking Amplifier with Cavity | We managed to lock the cavity by adding
the AOM , but the lock is still difficult
to stabilize. |
|
|
148
|
Thu Sep 8 13:39:03 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | Locking Amplifier with Cavity | We played on the CEP using the USB command
"id0=xxxxx" of the Menhir.
we put id0=48650 and we improved |
|
|
147
|
Thu Sep 8 11:16:40 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | Locking Amplifier with Cavity | Today, we played on the CEP but using the
I-tune input of the Menhir Laser (+/- 5V
maximal range). |
|
|
146
|
Wed Sep 7 18:58:03 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | Locking Amplifier with Cavity | Today we managed to observe the fundamental
mode and stabilize the scan on it until we
improved the alignment enough. |
   |
|
145
|
Wed Sep 7 18:57:20 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | Telescope / amplifier output | We increased the power of the amplifier
up to 10 W to see if there is a change in
the beam shape at the injection point or |
|
|
144
|
Tue Sep 6 17:47:40 2022 |
Ronic Chiche | Fixed | issue | lasers and optics | Optical room | unsuccessful telescope design :-( | we wanted to calculate the right telescope
with 2 spherical lenses.
1) we have the FP cavity mode size |
  |
|
143
|
Mon Sep 5 18:06:53 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | Telescope / amplifier output | Am adjustment on the lenses position to
have a smaller waist.
+ 250 mm @ 88 cm from amplifier |
|
|
142
|
Fri Sep 2 18:10:10 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | Telescope / amplifier output | Note the
correct beam divergence is approximately
~ 2.3 mrad |
 |
|
141
|
Fri Sep 2 17:50:21 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | Telescope / amplifier output | removing the reading which is not correct
(wrong use of software)
redone a reading similar using |
 |
|
140
|
Wed Aug 31 18:14:51 2022 |
Ronic Chiche | Fixed | info | lasers and optics | Optical room | 2nd stage CELIA amplifier | today we did several test with the Dichroic
shortpass mirror (Thorlabs DMSP1000) and
with a 10nm optical filter around 1030nm |
|
|
139
|
Tue Aug 30 17:48:39 2022 |
Ronic Chiche | Fixed | info | lasers and optics | Optical room | 2nd stage CELIA amplifier | today, we measured the 2nd stage CELIA
amplifier pump wavelength : 970-990 nm |
|
|
138
|
Wed Aug 24 10:45:24 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | 2 Mirror Setup @ 216.6 MHz | Adding information about the 2 mirror cavity
setup (plan - spherical)
that is currently installed. |
 |
|
137
|
Wed Aug 24 10:39:58 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | Telescope / amplifier output | Here is a view of beam propagation in the
optical software : GaussianBeam
the red filled shape is the model |
 |
|
136
|
Tue Aug 23 17:37:38 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | Telescope / amplifier output | I placed a periscope to adjust the high
of the beam from the amplifier output from
~ 10 cm from the table to ~ 15 cm |
|
|
135
|
Mon Aug 22 18:39:13 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | Amplifier output Beam Profile | Beam divergence after amplifier 4.46 mrad
|
|
|
134
|
Mon Aug 22 18:38:03 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | Telescope / amplifier output | Beam divergence was measured using a method
called "Focal |
  |
|
133
|
Fri Aug 19 16:36:18 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | Telescope / amplifier output | The previous Sbox telescope was dismantled
and the mechanical components cleaned.
its lenses are still in the mounts, |
|
|
132
|
Fri Aug 19 16:31:11 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | Amplifier output Beam Profile | In preparation to measure the output beam
profile from the amplifier at high power,
I have placed two wedge mirrors just before |
|
|
131
|
Fri Aug 19 16:03:40 2022 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | software | Optical room | CVBG stretching / Fiber Injection | closing series
|
|
|
130
|
Fri Aug 19 16:03:17 2022 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | software | Optical room | Alignment / Table setup | closing series
|
|
|
129
|
Fri Aug 19 16:02:33 2022 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | software | Optical room | CELIA amplifier installation + chiller | Closing series
|
|
|
128
|
Fri Aug 12 17:48:28 2022 |
Ronic Chiche | Fixed | report | lasers and optics | Optical room | "ThomX" CELIA Amplifier commissionning | this afternoon, with Fabian, we did some
measurements on the 3rd stage.
finally we |
|
|
127
|
Fri Aug 12 11:46:17 2022 |
Ronic Chiche | Fixed | info | lasers and optics | Optical room | OEwaves lock and Finesse measurement | this morning, I locked the FP cavity with
the OEwaves CW laser and the "Fred fiber
amplifier" used at 500mA of pump current. |
|
|
126
|
Thu Aug 11 19:27:09 2022 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | Optical room | Koheras CW laser lock on FP cavity | I locked the Koheras CW on the FP cavity
but the lock was pretty noisy and very difficult
to acquire. |
|
|
125
|
Thu Aug 11 12:11:48 2022 |
Ronic Chiche | Fixed | report | lasers and optics | Optical room | "ThomX" CELIA Amplifier commissionning | Beam size at the amplifier output:
to make this measurement, I switched
ON only 1st and 2nd stage. |
 |
|
124
|
Wed Aug 10 12:51:16 2022 |
Ronic Chiche | Fixed | report | lasers and optics | Optical room | "ThomX" CELIA Amplifier commissionning | The "ThomX" CELIA amplifier is
installed on the optical table.
I added all the rubber pieces available |
|
|
123
|
Mon Aug 8 17:58:32 2022 |
Ronic Chiche | Fixed | info | lasers and optics | Optical room | Pulse duration measurement before and after CVBG (as a strecher) | I recorded the pulse shape of the MENHIR
216MHz in its fiber injection setup.
the fiber is then connected to the |
  |
|
122
|
Mon Aug 8 11:11:28 2022 |
Aurélien Martens | Fixed | report | utilities | Optical room | chiller for CELIA amplifier | today, temperature of the chiller has been
set to 23°C.
measured temperature in the chiller |
|
|
121
|
Thu Jul 28 13:52:23 2022 |
Aurélien Martens | Fixed | report | utilities | Optical room | chiller for CELIA amplifier | The chiller of CELIA amplifier has been
moved from the corridor to the changing room
in front of PLIC. |
|
|
120
|
Fri Jul 22 18:25:31 2022 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | software | Optical room | CELIA amplifier installation + chiller | The software to control the CELIA amplifier
is on the laptop that was placed in ThomX
bunker. |
|
|
119
|
Fri Jul 22 18:19:13 2022 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | software | Optical room | CVBG stretching / Fiber Injection | Before injecting into the amplifier, the
pulse needs to be stretched using a CVBG,
type attached. |
7x |
|
118
|
Fri Jul 22 18:00:21 2022 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | software | Optical room | Alignment / Table setup | The current setup of the optical table
attached.
The cavity is aligned and the lock |
 |
|
117
|
Fri Jul 22 17:10:06 2022 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | Optical room | Installation of D-shaped mirror / Alignment | The D-shaped mirrors are installed properly
and not cutting the path of the beam.
The cavity has been aligned again |
|
|
116
|
Fri Jul 22 17:07:32 2022 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | software | Optical room | CELIA amplifier installation + chiller | Amplifier placed next to the pulsed laser
on the table under the airflow
The output is in free space with |
  |
|
115
|
Tue Jul 12 19:07:50 2022 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | software | Optical room | CELIA amplifier installation | The amplifier was installed on the optical
table next to SBox table.
The CVBG that will be used for |
|
|
114
|
Tue Jul 12 18:53:55 2022 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | Optical room | Installation of D-shaped mirror / Alignment | To prepare for the amplifier. I installed
the D-shapped mirrors after cleaning (using
aceton and ethanol) between the cavity 2 |
|
|
113
|
Tue Jul 12 14:41:55 2022 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | Optical room | FSR change & Finesse Measurements | a Finesse of 30k with the present mirrors
:
T1=120 ppm ;A1=(2.6+1) ppm; |
|
|
112
|
Tue Jul 12 10:19:30 2022 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | Optical room | FSR change & Finesse Measurements | Yesterday evening the cavity was Vacuum
pumped up to pressure of 5.5*10^-2 and locked
changed FSR to be 216.662 MHz and |
 |
|
111
|
Tue Jul 12 10:07:05 2022 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | Optical room | FSR change & Finesse Measurements | The FSR of the 2 mirror (plan-spherical)
Cavity was adjusted from 210 MHz to reach
216.643 MHz |
  |
|
110
|
Fri Jul 8 19:37:24 2022 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | Optical room | 2 Mirror Setup @ 216.6 MHz | Update for Finesse measurement, The cavity
was put under vacuum ~ 1.1*10^-1 mbar
and the alignment and coupling |
|
|
109
|
Fri Jul 8 17:48:48 2022 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | Optical room | 2 Mirror Setup @ 216.6 MHz | The cavity was realigned using irises instead
of pinholes, gave a better alignment.
The inside of the box, the spherical |
    |
|
108
|
Fri Jul 8 17:10:44 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | Images of ThomX mirrors | Mirror images in the previous log showing
the metal deposit of the coating of the spherical
mirrors |
|
|
107
|
Fri Jul 8 17:09:26 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | Images of ThomX mirrors | Under the microscope,
the spherical mirrors show the
deposit of metal dots on the reflecting surface |
  |
|
106
|
Wed Jul 6 19:57:17 2022 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | Optical room | 2 Mirror Setup @ 216.6 MHz | The SBox cavity setup was changed to have
only 2 mirrors M1 plane and M2 spherical,
both from ThomX |
    |
|
105
|
Wed Jul 6 18:39:38 2022 |
Manar Amer | Fixed | report | lasers and optics | vacuum | Optical room | SBox Finesse at 216.6625 MHz |
|
|
|
104
|
Wed Jul 6 18:39:25 2022 |
Manar Amer | Fixed | report | lasers and optics | vacuum | Optical room | SBox Finesse at 216.6625 MHz | Max Finesse obtained @ 4 mirror setup was
~ 19 300
With M1 from ThomX , M2/M3/M4 from |
|
|
103
|
Wed Jul 6 18:37:02 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | Divergence of the CW beam after collimator | Closing the series of the telescope for
the beam @ 133.33 MHz
|
|
|
102
|
Wed Jul 6 18:35:38 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | Fundamental Mode TEM00 | Closing series of 00 mode for FSR @ 133.33
MHz
|
|
|
101
|
Wed Jul 6 18:34:12 2022 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | software | Optical room | Cavity Lock | Closing the series for the setup
The cavity was only locked @ 133.33
MHz but the Finesse was not measured |
|
|
100
|
Mon Jun 27 08:52:46 2022 |
Manar Amer | Fixed | report | lasers and optics | vacuum | Optical room | SBox Finesse at 216.6625 MHz | The Sbox currently has the injection from
ThomX installed T ~ 120 ppm , M2 planar from
Sbox spare and M3 / M4 spherical mirrors |
|
|
99
|
Tue Jun 21 23:52:28 2022 |
Manar Amer | Fixed | report | mechanics | lasers and optics | detectors and electronics | Optical room | Menhir Pulsed Laser | The SBox Length (FSR), was changed to match
the repetition rate of the Menhir
pulsed laser Frep = 216.6625 MHz |
  |
|
98
|
Thu Jun 9 19:59:42 2022 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | software | Optical room | Cavity Lock | Cavity locked today under vacuum and no
airflow, it is stable over a long time
the alignment was improved and |
  |
|
97
|
Wed Jun 8 11:31:47 2022 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | software | Optical room | Cavity Lock | Current setup at SBox for locking the cavity
After spacial matching, the coupling
increased to ~ 15 - 20 % |
  |
|
96
|
Wed Jun 8 11:24:35 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | Telescope - Spacial Matching | Divergence of the CW beam out of the collimator
measured after 1 meter to be
2 |
|
|
95
|
Wed Jun 8 11:10:17 2022 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | software | Optical room | Cavity Lock | Start with the cavity lock images attached,
taken from last week, at
start we have a coupling ~ 5% and started |
  |
|
94
|
Wed Jun 8 10:58:15 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | Fundamental Mode TEM00 | Images of the Transmitted beam at M2 mirror
at different days.
The first one was from last week, |
 |
|
93
|
Wed Jun 8 10:47:45 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | SBox Alignment | Closing Series for Alignment.
Beating observed, beam is in the
locking stages |
|
|
92
|
Wed May 25 17:34:29 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | Fundamental Mode TEM00 | Adding images from the transmission after
the spherical mirrors M3 and M4 window for
a resonating mode inside the cavity. |
 |
|
91
|
Tue May 24 22:11:40 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | Fundamental Mode TEM00 | The current setup for the SBox has a beam
viewer and 2 photodiodes placed at reflection
and transmission. |
  |
|
90
|
Tue May 24 22:05:48 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | SBox Alignment | The external and internal alignment was
redone.
External Alignment : the collimator |
7x |
|
89
|
Tue May 24 21:51:01 2022 |
Manar Amer | Fixed | report | lasers and optics | utilities | Optical room | Spincoater - Mirrror cleaning | While repeating the alignment, the mirrors
were cleaned using the spin-coater and placed
again. |
|
|
88
|
Wed May 11 21:10:27 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | SBox Alignment | M2 Sbox changed to spare. Alignment of
M2 was redone.
With the help of Ronic , We observe |
  |
|
87
|
Wed May 11 20:51:28 2022 |
Manar Amer | Fixed | report | lasers and optics | utilities | Optical room | Spincoater - Mirrror cleaning | Following the observation that when rotating
M2 plan mirror of SBox the deformation position
of the mode changes. |
  |
|
86
|
Wed May 11 09:19:48 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | SBox Alignment | Yesterday, to find the source of why the
mode is deformed, I tried to rotate the mirrors
to see if there is a change. |
|
|
85
|
Mon May 9 19:27:35 2022 |
Manar Amer | Fixed | report | lasers and optics | utilities | Optical room | Spincoater - Mirrror cleaning | PowerPoint shows the detailed images of
all the mirrors before and after cleaning.
Images of SBox mirrors and M1 from |
    |
|
84
|
Mon May 9 19:05:35 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | SBox Alignment | Today; replaced the M1 SBox mirror with
M1 from gamma factory , following the previous
alignment. |
   |
|
83
|
Mon May 9 18:36:48 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | SBox Alignment | Last week In FP cavity we had all SBox
mirrors including the damaged M1 mirror.
The beating was observed with just |
 |
|
82
|
Wed Apr 27 22:30:14 2022 |
Manar Amer | Fixed | report | lasers and optics | utilities | Optical room | Spincoater - Mirrror cleaning | Images of the SBox mirrors cleaned at the
same time when the cavity was aligned.
Directly from the spincoater to |
|
|
81
|
Wed Apr 27 22:13:37 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | SBox Alignment | Finished the alignment of the SBox with
M1 of SBox placed, to be changed to gamma
factory mirror later |
 |
|
80
|
Tue Apr 26 20:08:10 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | SBox Alignment |
Adjust the placement of
the Irises (done at the start of the |
9x |
|
79
|
Mon Apr 25 18:02:09 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | SBox Alignment | Remember to update the position of the
reference Irises tomorrow !!!!
|
|
|
78
|
Mon Apr 25 17:58:01 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | SBox Alignment | After pointers and Advice from Aurélien,
improvement of the beam alignment
through M1 and M2 irises was done. |
    |
|
77
|
Mon Apr 25 17:28:29 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | SBox Alignment | SBox alignment, using CW laser Koheras
power 1 mW
|
6x |
|
76
|
Wed Apr 20 19:05:37 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | KBox Alignment | Starting with the alignment of the KBox
using CW Koheras.
The size of the CW output from |
7x |
|
75
|
Wed Apr 13 18:42:50 2022 |
Manar Amer | Fixed | report | lasers and optics | utilities | Optical room | Spincoater - Mirrror cleaning | Used the spincoater and pure water to clean
dielectric mirrors which will be installed
inside the SBox for directing the reflection |
  |
|
74
|
Fri Apr 8 19:27:12 2022 |
Manar Amer | Fixed | issue | detectors and electronics | utilities | Optical room | Clean Airflow Dust measurements | Dust measurement done today on top
of the SBox average 10min
|
|
|
73
|
Mon Apr 4 13:58:23 2022 |
Manar Amer | Fixed | issue | detectors and electronics | utilities | Optical room | Clean Airflow Dust measurements | The dust meter cap was cleaned using Alcohol,
and using the filter white cap the dust count
was (0 Av. 10 min) |
|
|
72
|
Thu Mar 31 13:29:01 2022 |
Manar Amer | Fixed | report | mechanics | lasers and optics | utilities | Optical room | Dust Cleaning of SBox | After an overnight where the cavity box
was left open, a measurement of the Dust
meter was taken: |
 |
|
71
|
Wed Mar 30 18:53:01 2022 |
Manar Amer | Fixed | report | mechanics | lasers and optics | utilities | Optical room | Dust Cleaning of SBox | The inside of the cavity was cleaned today.
It was very dirty and had big dust particles
and fibers inside. |
6x |
|
70
|
Tue Mar 29 16:27:34 2022 |
Manar Amer | Fixed | report | utilities | Optical room | Spincoater - Mirrror cleaning | In preparation for cleaning the mirrors.
The spincoater has been moved with
its bump into the sas of the SBox. |
|
|
69
|
Tue Mar 29 16:23:00 2022 |
Manar Amer | Fixed | report | lasers and optics | cabling | Optical room | Mightylaser Amplifier | Migthylaser amplifier has been moved from
the SBox table to the PLIC table.
|
|
|
68
|
Wed Mar 23 18:17:45 2022 |
Manar Amer | Fixed | report | utilities | Optical room | Dust Cleaning of SBox | The cleaning was done twice with half an
hour interval between the two times
reading on the dust meter was taken |
|
|
67
|
Wed Mar 23 18:11:22 2022 |
Manar Amer | Fixed | report | utilities | Optical room | Dust Cleaning of SBox | An Initial cleaning of the KBoX outside
was done, All the optics and mechanics placed
that were on the table were removed. |
   |
|
66
|
Mon Jul 5 14:46:44 2021 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | Optical room | OEwaves CW Laser - Phase Noise | correction on unit 1030 nm
|
|
|
65
|
Mon Jul 5 14:40:57 2021 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | Optical room | OEwaves CW Laser - Phase Noise | a correction on the wavelength of the laser
it is 1030 um
|
|
|
64
|
Mon Jul 5 14:14:01 2021 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | Optical room | OEwaves CW Laser - Phase Noise |
We started measuring the phase
noise on the OEwaves CW laser.
Class
3b
wavelength 1.5 um
The |
  |
|
63
|
Thu Jun 10 17:55:15 2021 |
Ronic Chiche | Fixed | info | lasers and optics | Optical room | Origami SN2440 133MHz laser tests | Today, we received the Origami SN2440 133MHz
oscillator from repair (NKT mentioned a defective
wire inside the controller....) |
  |
|
62
|
Tue Jan 12 10:44:57 2021 |
Ronic Chiche | Fixed | issue | lasers and optics | Optical room | Origami SN2440 133MHz laser power measurment... and failure | we received from NKT the Origami SN2440
133MHz oscillator from repair on 2020/12/17
and we measured the power trend from |
 |
|
61
|
Tue Jan 5 12:38:04 2021 |
Manar Amer | Fixed | report | lasers and optics | Optical room | Transmission Measurements for the Mirrors. |
Thursday 10 December 2020:
First Test Measurement - Inside Box
The
transmission ( T ) for the mirrors of SBOX |
6x |
|
60
|
Wed Dec 16 12:36:37 2020 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | Mirror's cleaning and microscope imaging | On 10th of december 2020 we cleaned the
SBOX mirrors and took microscope images
(the name of the images indicates what they |
14x |
|
57
|
Thu Feb 6 16:58:57 2020 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | Power up to 48kW crater effect again | As we said, after glow discharge and spin
coater we recovered a low power finesse ~23000
(aligning away from the M1 crater). |
  |
|
56
|
Thu Feb 6 11:01:08 2020 |
Ronic Chiche | Fixed | report | lasers and optics | Optical room | analysis of stored and reflected power | with this Finesse around 22-23k, the technique
comparing TRANSMISSION and REFLECTION signals
doesn't work, even in taking into account |
|
|
55
|
Wed Feb 5 16:46:01 2020 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | SBOX mirrors cleaned | Today we put the cavity to vacuum (~ 0.1
mBar) and we measured again the Finesse with
Koheras and modulation technique. |
|
|
54
|
Wed Feb 5 14:47:16 2020 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | SBOX mirrors cleaned | Yesterday, after installation and alignment
of mirrors and cavity, the Finesse has been
measured with cavity at air pressure, with |
|
|
53
|
Wed Jan 29 19:04:38 2020 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | SBOX mirrors cleaned | Today, SBOX mirrors have been cleaned with
spin coater on HR face and isoprop on back
face. They show similar spots as before. |
|
|
52
|
Wed Jan 29 19:00:02 2020 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | Glow discharge cleaner on SBOX mirrors | The glow discharge cleaner has been tested
on the SBOX mirrors.
I've put them 1 by 1. Each |
|
|
51
|
Fri Jan 24 17:58:45 2020 |
Loïc Amoudry | Fixed | info | lasers and optics | Optical room | CFBG removed from ThomX CELIA amplifier | The CFBG has been removed successfully
and the amplifier is closed now.
The soldering machine had a calibration |
|
|
50
|
Fri Jan 24 17:56:11 2020 |
Loïc Amoudry | Fixed | info | lasers and optics | Optical room | AFM analysis of M2 | We had enough time to proceed a quick scan
of M2 which has also a hole but not centered
on the mirror. |
|
|
49
|
Fri Jan 24 17:52:14 2020 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | AFM analysis of M1 | AFM has been proceeded on M1 and M2.
The pdf shows the first images
taken with the PLIC room Leica microscope |
|
|
48
|
Fri Jan 24 16:16:24 2020 |
Ronic Chiche | Fixed | report | lasers and optics | Optical room | analysis of stored and reflected power | A chart which summarizes
the data we have or we can estimate.
|
 |
|
47
|
Fri Jan 10 18:51:23 2020 |
Ronic Chiche | Fixed | report | lasers and optics | Optical room | analysis of stored and reflected power | the 10th of January, we increased the power
of the amplifier to study the cavity transmitted
and reflected power signals. |
6x |
|
46
|
Thu Jan 9 16:54:05 2020 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | Microscope and cleaning of SBOX mirrors | The mirrors went in the cavity the 28th
of november (We did several power up
to 30kW stored and only one to 40kW then |
|
|
45
|
Thu Dec 19 16:23:39 2019 |
Ronic Chiche | Fixed | info | lasers and optics | Optical room | Cavity beam axis moving with power | how the cavity beam axis is moving during
a lock when the cavity is hot ?
could it explain a part of the Transmission |
9x |
|
44
|
Thu Dec 19 16:03:17 2019 |
Ronic Chiche | Fixed | info | lasers and optics | Optical room | Beam size behind M2 | Yesterday, we tried to better adapt positions
of the telescope lenses, dynamically, during
the lock, to improve the matching between |
|
|
42
|
Thu Dec 19 09:21:45 2019 |
Ronic Chiche | Fixed | info | lasers and optics | Optical room | Optical amplifier polarization state | polarization state of the cavity at higher
power : 20kW, 30kW and 33kW (slight
CEP and alignment optimization) : |
  |
|
41
|
Tue Dec 17 17:58:12 2019 |
Ronic Chiche | Fixed | info | lasers and optics | Optical room | Beam size behind M2 | the telescope matchs the cold cavity beam,
so it is normal to have a power decrease
on the transmission photodiode when the cavity |
|
|
40
|
Tue Dec 17 17:54:38 2019 |
Ronic Chiche | Fixed | info | lasers and optics | Optical room | Optical amplifier polarization state | The
polarimeter was giving a strange 50% of DOP
of the light coming from the cavity. |
|
|
39
|
Tue Dec 17 12:16:54 2019 |
Ronic Chiche | Fixed | info | lasers and optics | Optical room | Optical amplifier polarization state | We placed a PBS + 2 photodiodes (PhD1,
PhD2) at the output of the amplifier to check
how the polarization of the amplifier changes |
 |
|
38
|
Tue Dec 17 10:56:08 2019 |
Ronic Chiche | Fixed | report | lasers and optics | Optical room | first data with 3A on the 3rd stage | 2 pictures :
typical beam with HOM
typical beam after moving the D-shape |
 |
|
37
|
Tue Dec 17 10:46:24 2019 |
Ronic Chiche | Fixed | info | lasers and optics | Optical room | Beam size behind M2 | Beam diameter behind M2 :
- 2nd stage @ 6A - 1kW inside cavity
sx = 2120 µm |
 |
|
36
|
Fri Dec 13 18:28:00 2019 |
Ronic Chiche | Fixed | report | lasers and optics | Optical room | first data with 3A on the 3rd stage | Today, at 3A on the 3rd stage, we saw some
HOM effects.
the transmissions is about 100mW which |
 |
|
35
|
Fri Dec 13 15:56:22 2019 |
Ronic Chiche | Fixed | issue | lasers and optics | Optical room | 2nd stage amplifier issue | 2nd stage output power was going down.
We checked the pump diode technical data
sheet and the operating temperature is [25°C:35°C]. |
|
|
34
|
Thu Dec 12 11:49:05 2019 |
Ronic Chiche | Fixed | issue | lasers and optics | Optical room | 2nd stage amplifier issue | Last time, we switched ON directly the
2nd stage at 6A without increasing/decrinsing
slowly the current. |
|
|
33
|
Wed Dec 11 17:13:02 2019 |
Ronic Chiche | Fixed | issue | lasers and optics | Optical room | 2nd stage amplifier issue | the 2nd stage amplifier needed several
hours (4-5h) to reach its nominal power (we
look at photodiode level on a scope), instead |
|
|
32
|
Tue Dec 10 09:36:56 2019 |
Ronic Chiche | Fixed | info | lasers and optics | Optical room | FSR and Finesse measurement | Yesterday the cavity has been aligned and
locked with the CW Koheras laser.
the FSR has been measured by modulation |
|
|
31
|
Fri Dec 6 11:54:58 2019 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | Mirror's installed | The initial 400kW SBOX mirrors which have
been cleaned ont 28th of november have been
installed this morning on the SBOX. |
|
|
30
|
Fri Dec 6 11:53:53 2019 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | Mirror's cleaning | XPS has been proceeded on the 400kW SBOX
mirrors M3 and M4 (the initial cavity spherical
mirrors) in frebruary 2019. Deposited a lot |
 |
|
29
|
Wed Nov 13 13:15:53 2019 |
Loïc Amoudry | Fixed | report | lasers and optics | Other | AFM+ InfraRed spectroscopy (IR spectro) has been performed | AFM+ InfraRed spectroscopy (IR spectro)
has been performed on 400kW S-BOX mirrors.
Seems that XPS made M3 and M4 dirty, |
|
|
59
|
Mon Jun 24 16:15:08 2019 |
Huan Wang | Fixed | info | lasers and optics | Optical room | amplifier | I just had a phone call with Jérome
and he told me 2 things :
* Be carefull ! the MightyLaser |
|
|
58
|
Wed Jun 19 18:54:00 2019 |
Huan Wang | Fixed | info | lasers and optics | Optical room | amplifier | Onefive output power is 24mW now, and 2.41mW(after
EOM) injected into fiber,
a injection power monitor |
|
|
28
|
Fri Feb 1 14:04:27 2019 |
Loïc Amoudry | Fixed | info | lasers and optics | Other | Meeting with LMA people, AFM | 30/01/19 - The following powerpoint
shows the results discussed with LMA people.
What came out from the discussion |
|
|
27
|
Fri Feb 1 13:45:19 2019 |
Loïc Amoudry | Fixed | report | lasers and optics | Other | AFM performed on S-BOX mirrors | 29/02/19 - AFM has shown that spots
on mirror's surfaces are bumps and not
holes. |
 |
|
26
|
Thu Jan 24 17:49:54 2019 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | Impacts on mirror's surface | All the mirrors show impacts on there surface
(some of them do not show deposit). Does
it come from experiments or fabrication ? |
|
|
25
|
Thu Jan 24 17:44:21 2019 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | Deposit on S-box mirrors after return from LMA | Cleaning on dirty surface shows something
is deposited on the surface. Cleaning displaces
and removes part of the deposit. |
 |
|
24
|
Fri Dec 21 13:42:43 2018 |
Loïc Amoudry | Fixed | info | lasers and optics | Optical room | Mirrors features, come back from LMA | Mirrors arrived today from LMA. Their features
are damaged.
Photos avant ou après nettoyage, |
  |
|
23
|
Thu Nov 15 13:02:44 2018 |
Loïc Amoudry | Fixed | info | lasers and optics | Optical room | Mirrors cleaning | The new mirrors didn't give expected
results. Then the 4 old mirrors have been
sent to LMA on 12/11/18 for a cleaning and |
|
|
22
|
Mon Nov 5 13:11:08 2018 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | First run with spare mirrors |
I (A)
|
 |
|
21
|
Wed Oct 31 14:06:17 2018 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | M1 transmission measurement | At different positions, transmission give
194, 193, 208, 200 ppm?
|
|
|
20
|
Wed Oct 31 14:04:50 2018 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | M4 transmission measurement |
Loïc |
|
|
19
|
Wed Oct 31 14:03:22 2018 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | M4 transmission measurement | The kept transmission for M4 is
2.17 ppm. Which is the value
measured after alignement (center of the |
|
|
18
|
Wed Oct 31 13:51:17 2018 |
Loïc Amoudry | Fixed | info | lasers and optics | Optical room | Change of the 3 ULE mirrors by 3 spare ULE mirrors | First finesse measurement 20 266, FSR 133.351
MHz under vacuum |
 |
|
17
|
Wed Oct 31 13:48:58 2018 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | M1 transmission measurement | Center of M1:
I |
|
|
16
|
Wed Oct 31 13:44:22 2018 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | Finesse vs power by difference between main and second resonance | Measurement on 25/10/2018
|
|
|
15
|
Wed Oct 31 13:43:28 2018 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | Finesse vs power by difference between main and second resonance | Measurement on 24/10/18
|
|
|
14
|
Wed Oct 31 13:43:03 2018 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | Polarization frequency | Measurement on 30/10/18.
|
|
|
13
|
Wed Oct 31 13:42:22 2018 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | Polarization frequency | Check of the frequency of the onefive locked
on each polarization of the cavity (tilt
a waveplate by 45°). |
|
|
12
|
Wed Oct 31 11:36:30 2018 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | Finesse vs power by difference between main and second resonance | Measurements show that ratio decrease versus
power. BUT, the second resonance measurement
induce lower power in the cavity so the ratio |
 |
|
11
|
Wed Oct 31 11:27:49 2018 |
Loïc Amoudry | Fixed | report | mechanics | lasers and optics | Optical room | Power measurement with D-shape | Measurements of lot of points with D-shape
mirrors well positionned.
Power not optimized to the best |
|
|
10
|
Fri Oct 19 11:46:21 2018 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | Beam size vs D-shape position | Matlab code for size vs position and power
:
clear all |
|
|
9
|
Fri Oct 19 11:23:27 2018 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | Beam size vs D-shape position | Measurement done on 18/10/18.
At high power, the shape of the
0.0 mode does not change. The D-shape only |
|
|
8
|
Fri Oct 19 11:13:40 2018 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | Transmission vs D-shape position at different powe | Measurements have been done on 18/10/18.
Datas are on excel file, also matlab
file. |
  |
|
7
|
Thu Oct 18 09:42:39 2018 |
Loïc Amoudry | Fixed | report | mechanics | lasers and optics | Optical room | Motors for D-shaped mirrors | Motors have been installed on 16/10/18.
No problem with them.
Effect of the motors tested on |
    |
|
6
|
Tue Oct 9 10:19:29 2018 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | Record power-up | Measurement made on 03/10/18 (nothing has
been done since there).
Stable power in the cavity of 225 |
|
|
5
|
Tue Oct 9 10:15:17 2018 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | Polarization optimization | Optimization of the polarization has been
made the 03/10/18. Checked in reflection
of the cavity in reflection&transmission |
|
|
4
|
Mon Oct 1 15:19:48 2018 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | Phase measurement with HASO | with just intensity, the coupling is 98%,
and with phase, x direction coupling is 95%,
y direction 97%, so the telescope is good. |
|
|
3
|
Mon Oct 1 14:27:35 2018 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | Phase measurement with HASO | * Loic has to fix the number of files (3)
regarding the number of measurements (2)
* splitted Intensity and phase |
8x |
|
2
|
Mon Oct 1 11:30:39 2018 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | Phase measurement with HASO | 2 measurement.
First one locked, in transmission
of M2 with 2nd stage 0A.Total 89 cm from |
  |
|
1
|
Wed Sep 26 18:12:44 2018 |
Loïc Amoudry | Fixed | info | lasers and optics | Optical room | Cavity polarization states (Koheras), Finesse of 2 polarization states | Measurments of Finesse with the 2 polarization
states, let's call them H (higher) and
L (lower): 24500 for the H and 23500 for |
   |