  245   Wed Sep 10 11:27:45 2025 Alice RenauxUnder Processreportlasers and opticsOptical roomnew cavityThe 2-mirrors cavity has 460ppm of transmission
for M1 and 10ppm for M2 which should exhibit
a Finesse around 13400.
 Finesse.png 
  244   Tue Sep 9 21:23:11 2025 Alice RenauxUnder Processreportlasers and opticsOptical roomnew cavityYesterday, we changed the M1 mirror to
a 161185 Gamma
Factory mirror of transmission 460ppm, the
  
  243   Thu Sep 4 17:56:50 2025 Alice RenauxUnder Processreportlasers and opticsOptical roomFinesse measurement(Finesse 2651 is consistent with that obtained
from the mirrors' transmission coefficients,
which is about 3100.)
  
  242   Thu Sep 4 17:52:03 2025 Alice RenauxUnder Processreportlasers and opticsOptical roomFinesse measurementToday, with Ronic, we measured the finesse
of the 2-mirror cavity witht the NKT CW laser.

We were able to perfrom the measurement
 Figure_3.png 
  241   Thu Sep 4 17:35:50 2025 Ronic ChicheFixedinfolasers and optics | detectors and electronicsOptical roomInstallation of the avalanche photodiodeAfter installing the 2nd EOM, we had some
trouble to be able to lock again.
One possible reason was the very low
  
  240   Wed Sep 3 18:10:34 2025 Alice RenauxUnder Processreportlasers and opticsOptical roomSuccessful lock (finally !)Today, with Ronic, we managed to get a
successful lock with the NKT laser by setting
up a new PDH box from scratch (photodiode
 IMG_20250903_113758.jpg 
  239   Thu Aug 28 15:29:00 2025 Alice RenauxUnder Processreportlasers and opticsOptical room2-mirror cavity lockingIn June, we encountered some problems regarding
the transmission and error signals (see images
here),
 Figure_1.pngFigure_2.png 
  238   Mon Jun 23 14:38:33 2025 Ronic ChicheUnder Processissuemechanics | lasers and optics | detectors and electronicsOptical roomfirst attempt to lockWith Alice, we installed the EOWaves oscillator
to be locked on the FP-cavity (T1 ~ 2500ppm,
T2 ~ 10ppm => F ~ 2500)
 20250623_123816.jpg20250623_123833.jpg20250623_123908.jpg 
  237   Fri Jun 13 20:10:00 2025 Alice RenauxFixedreportlasers and opticsOptical roomDamaged mirrors testToday with Dorian we tested three mirrors
with which we previously haven't been
able to obtain any resonance or optical beating
  
  236   Wed May 28 18:27:27 2025 Alice RenauxUnder Processreportlasers and opticsOptical room2-mirror cavity full setupToday with Ronic, we changed the FP cavity's
mirrors to Layertek (Gamma Factory) mirrors
:
  
  235   Wed May 28 10:55:15 2025 Alice RenauxUnder Processreportlasers and opticsOptical room2-mirror cavity alignmentThe NKT laser PZT sensitivity is ~0.09pm/V
of wavelength variation, which is equivalent
to ~ 25MHz/V
 Sans_titre.jpg 
  234   Tue May 27 18:12:22 2025 Alice RenauxUnder Processreportlasers and opticsOptical room2-mirror cavity alignmentYesterday and today, I replaced the OEWaves
CW laser with the NKT CW laser. Its screen
does not display anything, so it has to be
 IMG20250527160111.jpg 
  233   Fri Mar 21 18:27:36 2025 Alice RenauxUnder Processreportmechanics | lasers and opticsOptical room2-mirror cavity alignmentAt the beginning of the week, I installed
a half-wave plate, a beamsplitter cube and
a quarter-wave plate, as well as the end-of-cavity
 2-mirror_cavity_alignment.zip 
  232   Tue Mar 4 18:51:57 2025 Ronic ChicheUnder Processinfomechanics | lasers and opticsOptical roomAlignment of a 2-mirror FP cavitytoday with Alice,

- we measured the height of the
SBOX windows center : 140mm from the optical
  
  231   Tue Mar 4 18:33:26 2025 Ronic ChicheFixedinfoutilitiesOptical roomoptical table cleaningnow, it seems the table is clean enough
(dust meter counts 0 particles) to install
a 2 mirrors FP-cavity.
  
  230   Mon Dec 16 10:20:56 2024 Ronic ChicheUnder Processissuelasers and opticsOptical roomCELIA 100W laser amplifier repair friday morning, we add a zoom call with
Jerome Lhermite about the amplifier repair.
he approximately confirmed the amplifier
 Sans_titre.png 
  229   Fri Dec 6 16:59:57 2024 Ronic ChicheFixedinfoutilitiesOptical roomoptical table cleaningthis afternoon, we checked the dust meter
which is at 0 for 1 and 5µm dust particles
but ~ 2000-3000 for 0.3µm particles.
  
  228   Tue Dec 3 13:51:52 2024 Ronic ChicheFixedinfoutilitiesOptical roomoptical table cleaningthis morning with Alice and Daniele, we
removed all the optics elements and equipments
from the SBOX optical table and started to
 Oxydation.jpg20241203_113105.jpg20241203_125359.jpg 
  227   Fri Nov 29 16:50:04 2024 Alice RenauxUnder Processinfolasers and opticsOptical roomMenhir 216MHz laserThe Menhir 216MHz laser has been put back
in place on the cavity table. Its output
power is measured to be 160mW with an attenuator.
 spectre.xlsxspectre.png 
  226   Fri Nov 29 12:06:05 2024 Alice RenauxFixedinfolasers and opticsOptical roomMenhir 160MHz laserThe Menhir 160MHz has been put back in
place on the CELIA amplifier setup. Its output
power is measured to be 150-160mW with an
 spectre_avant_cvbg.xlsxspectre_apres_cvbg.xlsxspectre_avant_cvbg.pngspectre_apres_cvbg.png 
  225   Wed Oct 2 18:12:54 2024 Ronic ChicheUnder Processissuelasers and opticsOptical roomCELIA 100W laser amplifier repair this afternoon, we saw some electric cables
badly connected to their power supply.
we fixed it by soldering them together
 IMG20241002144351.jpgIMG20241002144936.jpg20241002_161657.jpgClipboard_10-02-2024_01.jpg 
  224   Wed Oct 2 10:12:55 2024 Ronic ChicheUnder Processissuelasers and opticsOptical roomCELIA 100W laser amplifier repair this morning with Alice, we sent the Menhir
160MHz injected in a fiber (with 6mW at the
end of a long fiber) into the laser amplifier,
  
  223   Wed Jun 19 10:38:00 2024 Ronic ChicheFixedinfomechanics | lasers and optics | detectors and electronicsOptical roomD-shape mirrors positionning statussummary:

- the motors used to move the D-shape
are the Newport Picomotors 8303-V
  
  222   Fri May 17 15:02:01 2024 Xinyi LuFixedinfolasers and opticsOptical roomhigh-power experiments of 2-mirror cavityHere's a summary of our experiment
last week:

The initial telescope position:
 6x 
  221   Thu May 16 18:51:17 2024 Xinyi LuFixedinfolasers and opticsOptical roomhigh-power experiments of 2-mirror cavityhere is a Matlab code to try to optimize
the telescope for a hot cavity,
taking into account the thermal lens
 telescope_optimization_for_700kW.pdf2_Mirrors_-_216MHz_-_700kW_cavity_setup.xmlcavity_2M_dynamic_thermal_effect.m 
  220   Mon May 6 18:38:18 2024 Xinyi LuFixedinfolasers and opticsOptical roomhigh-power experiments of 2-mirror cavityToday, Ronic, Daniele and I redo the high-power
2-mirror cavity experiments, and the results
are shown in the table (Figure 1 and
 record_20240506.pngrecord20240506.xlsxScreenshot_2024-05-06_11_145855-500kW.pngScreenshot_2024-05-06_1_112931-14kW.png 
  219   Thu Apr 25 22:12:25 2024 Xinyi LuFixedinfolasers and opticsOptical room2 mirror cavity high power experimentsToday, Ronic and I recorded some intracavity
power and cavity mode size as shown in Fig.
1.
 record_20240425.pngScreenshot_2024-04-25_4_155354-155kw.pngScreenshot_2024-04-25_1_154630-155kw.png60kW_highordermode2.jpg 
  218   Tue Apr 16 18:38:04 2024 Xinyi LuFixedinfolasers and opticsOptical roomFiber injection, spectrum and connection of 2nd stage amplifierToday, Daniele and I injected the laser
into the fiber, installed the telescope,
connected the second stage of the amplifier,
 CVBG_inject_to_fiber.pngtelescope.png 
  217   Mon Apr 15 18:19:40 2024 Xinyi LuFixedinfolasers and opticsOptical roomFinesse measurement of 2-mirror cavity- Today Daniele and I cleaned the spherical
mirror by wiping it with alcohol,
and the finesse increased to 47k
 finesse_45k.png 
  216   Fri Apr 12 17:18:15 2024 Xinyi LuFixedinfolasers and opticsOptical roomInstall 2-mirror cavityToday Viktor and I completed the installation
of the two-mirror cavity and managed
to lock and measure the finesse.
 finesse_2mirror.pngScreenshot_2024-04-12_170357.pngScreenshot_2024-04-12_145025.png 
  215   Thu Apr 11 19:09:21 2024 Xinyi LuFixedinfolasers and opticsOptical roomInstall 2-mirror cavityToday, Viktor and I started installing
the two-mirror cavity.
- Firstly, we cleaned the environment
 2_mirror_setup.pngmirrors.png 
  214   Wed Apr 10 11:35:54 2024 Xinyi LuFixedinfolasers and opticsOptical roomFinesse measurement (35k)These days, Ronic, Aurélien
and I use OEwaves CW laser to measure the
finesse of SBOX. We made 5 measurements
 5_measurements_of_finesse.pngfit.png 
  213   Tue Apr 9 08:57:22 2024 Xinyi LuFixedinfolasers and opticsOptical roomDifferent cavity modes & Pulse widthAdditional information:

The pulse duration has been performed
in RF on a UPD-70-IR2-P photodiode from Alphalas
 t_cvbg.pngt_amp.png 
  212   Mon Apr 8 08:34:54 2024 Xinyi LuFixedinfolasers and opticsOptical roomDifferent cavity modes & Pulse width- Last week, we obtained three curves of
the variation of different cavity modes with
power (Fig. 1). By comparing the gain for
 cavitymode_vs_power_f.pngdifferent_cavity_mode_data.xlsx 
  211   Thu Apr 4 21:48:16 2024 Xinyi LuFixedinfolasers and opticsOptical roomLarger beam size & Spectrum- We re-measured the gain before moving
the mirror. Gain ~9000 was achieved at 3A,
but as the power increased, the gain dropped
 cavitymode_vs_power_bigger.jpgspectrum.png 
  210   Wed Apr 3 21:37:07 2024 Xinyi LuFixedinfolasers and opticsOptical roomHigh power experiments (550kW)- Today we moved the position of the D-shaped
mirror at 6A. When motor1 (vertical) is 0.2mm
away from the spot, the power in the cavity
 record.pngpower_vs_time_550.jpg1A.JPG 
  209   Wed Apr 3 08:53:33 2024 Xinyi LuFixedinfolasers and opticsOptical roomHigh power experiments (520kW)Yesterday, Ronic, Xing, Qili and I achieved
a more stable 520kW power at 7.5A (71W injection)
by optimizing the alignment and locking parameters.
 power_vs_time.pngcavitymode_vs_power_1.pngrecord.pnginjection_power_vs_intra_power.png 
  208   Tue Apr 2 08:39:17 2024 Xinyi LuFixedinfolasers and opticsOptical roomHigh power experiments (500kW)Last week, we achieved a stable intracavity
average power of 500kW, limited by amplifier
power. The experimental data are shown
 record.pngpower_vs_time.pngcavitymode_vs_power.png 
  207   Fri Mar 29 16:23:34 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronicsOptical room100W CELIA laser amplifier "Power vs Pump current" curveWe measured again the 100W CELIA laser
amplifier with a pump current until 8A.

as the first current pump of the
 CELIA_100W_amplifier_Power_vs_Current.png 
  206   Thu Mar 28 19:03:55 2024 Xinyi LuFixedinfolasers and opticsOptical roomAmplifier power and mirror transmissionToday, Ronic, Daniele, Aurélien
and I measured the amplifier power and mirror
transmission.
 3rd_amp_power.pngTransmission_measurement.png 
  205   Wed Mar 27 22:37:02 2024 Xinyi LuFixedinfolasers and opticsOptical roomHigh power experiments (272kW)Today, Ronic and I achieved 272kW inside
the cavity at 7.5A. The coupling maintained
60%-70%.
 Screenshot_2024-03-27_7_270kW_7.5A.png210_kW_power_at_5A_injection.png272.3kW_at_7.5A.jpg 
  204   Wed Mar 27 09:47:37 2024 Xinyi LuFixedinfolasers and opticsOptical roomHigh power experiments (200kW)all the injection power in the chart have
not been measured recently but during the
Loic thesis period.
  
  203   Tue Mar 26 19:36:48 2024 Xinyi LuFixedinfolasers and opticsOptical roomHigh power experiments (200kW)These days, Ronic and I achieved 200kW
inside the cavity and 70% coupling efficiency.

- By optimizing the telescope,
 202kW_power_at_8A_injection.pngStrange_drops.jpg 
  202   Thu Mar 21 17:32:59 2024 Xinyi LuFixedinfolasers and opticsOptical roomPolarization issue & 50kW with 22W injectionToday, Ronic and I lock the cavity on the
other polarization and achieved 50kW with
22W injection.
 50kW_with_22W_injection.png50_kW_power_at_3A_injection.png 
  201   Thu Mar 21 09:26:50 2024 Xinyi LuFixedinfolasers and opticsOptical roomPolarization issuejust to add some details
:

about the S and P polarization
  
  200   Wed Mar 20 18:22:53 2024 Xinyi LuFixedinfolasers and opticsOptical roomPolarization issueThese days, Ronic, Aurélien, Fatematuj
and I have been doing some tests on polarization
issue, trying to see if it is possible to
 Screenshot_2024-03-20_0_090501.pngScreenshot_2024-03-20_4_110622.pngM3_window.png 
  199   Wed Mar 13 19:44:41 2024 Xinyi LuFixedinfolasers and opticsOptical roomInjection at the amplifier current of 2 AToday, Ronic and I optimized the locking at
the amplifier current of 2 A and
obtained ~ 21 kW inside
 21kW_power_at_2A_injection.png 
  198   Tue Mar 12 22:13:47 2024 Xinyi LuFixedinfolasers and opticsOptical roomCoupling efficiency improvement- Today, Ronic and I locked at the amplifier
current of 2 A and obtained ~60% coupling
after optimizing the CEP (see Figure
 Screenshot_2024-03-12_0_192348.png 
  197   Fri Mar 8 18:04:43 2024 Xinyi LuFixedinfolasers and opticsOptical roomCoupling efficiency improvementToday, Ronic and I installed the new telescope
and locked the cavity.

- We locked at the amplifier
 Screenshot_2024-03-08_0_172245.png 
  196   Thu Mar 7 18:55:42 2024 Xinyi LuFixedinfolasers and opticsOptical roomCoupling efficiency improvement- These days, Ronic, Fatematuj and I measured
the beam parameters of the output of the
third-stage amplifier.
 beam_after_lens.png 
  195   Wed Feb 28 17:26:46 2024 Ronic ChicheFixedinfolasers and optics | softwareOptical room100W CELIA laser amplifier "how's to" document1st version of the document.
if some information is not correct
or missing, give any comment by replying
 How_to_start_the_Amplifier_v1.pdf 
  194   Tue Feb 27 17:51:56 2024 Xinyi LuFixedinfolasers and opticsOptical roomAmplified laser injectionIn the last two days, Ronic and I connected
the amplifier and locked the cavity.

- We installed an iris on the output
 Screenshot_2024-02-27_1_165535.png 
  193   Mon Feb 26 16:53:24 2024 Xinyi LuFixedinfolasers and opticsOptical roomMenhir pulsed laser lockinghere is the code to get this last curve




 Gain_vs_CEP.m 
  192   Mon Feb 26 08:58:33 2024 Xinyi LuFixedinfolasers and opticsOptical roomMenhir pulsed laser lockingLast week, Ronic and I focused on CEP
measurements of the menhir laser.


Measurements without
 Gain_vs_CEP.pngScreenshot_2024-02-23_0_183652.png 
  191   Wed Feb 21 18:09:11 2024 Xinyi LuFixedinfolasers and opticsOptical roomMenhir pulsed laser lockingHere is a simulation of the relative FP-cavity
gain vs the CEP for a Finesse of 23000 and
taking into account the Menhir laser optical
 Relative_cavity_gain_vs_CEP.pngGain_vs_CEP.m 
  190   Wed Feb 21 17:33:59 2024 Xinyi LuFixedinfolasers and opticsOptical roomMenhir pulsed laser lockingThese days, Ronic, Daniele and I achieved
stable cavity locking with the menhir pulsed
laser.
 Screenshot_2024-02-21_1_110931.pngScreenshot_2024-02-21_110934.pngcalculation.jpg 
  189   Wed Feb 14 17:20:26 2024 Xinyi LuFixedinfolasers and opticsOptical roomCleaning of Mirrors- Today, Daniele and I cleaned the
cavity inside, recleaned the M2 and
M4 and their mounts, optimized the locking,
 F_25299.png 
  188   Tue Feb 13 17:33:28 2024 Xinyi LuFixedinfolasers and opticsOptical roomCleaning of MirrorsToday, Daniele and I cleaned mirrors one
by one using pure water, alcohol, and the
spin coater. Here are the measurements of
 2nd_measurement_F20606.png7th_measurement__F16563_bad_locking.png 
  187   Mon Feb 12 17:17:04 2024 Xinyi LuFixedinfolasers and opticsOptical roomCleaning of Mirrors- Today we cleaned the environment and
put the spin coater and microscope inside
the airflow.
 optical_room.jpg 
  186   Fri Jan 26 17:33:05 2024 Xinyi LuFixedinfolasers and opticsOptical roomCleaning of MirrorsToday Daniele, Ronic and I cleaned the
mirrors and locked the cavity. However, the
finesse was only 13,000 because of the not
  
  185   Wed Jan 24 20:33:27 2024 Xinyi LuFixedinfolasers and opticsOptical roomInstall new mirrorsYesterday we checked the mirrors with
UV light and there was some dust on the mirrors,
especially M2.
 M2.jpg 
  184   Mon Jan 22 18:18:01 2024 Xinyi LuFixedinfolasers and opticsOptical roomInstall new mirrors- Today, Ronic and I changed the signal
generator to a low-noise one (with a delay
time of only 0.5 us). Then we moved
 New_finesse.png 
  183   Thu Jan 18 22:14:03 2024 Xinyi LuFixedinfolasers and opticsOptical roomInstall new mirrors- In the last two days, Ronic and I installed
new mirrors after cleaning the environment,
and locked the cavity.
 New_mirrors.pngfinesse.pnglocking.jpg 
  182   Wed Jan 17 21:11:59 2024 Xinyi LuFixedinfolasers and opticsOptical roomInstall new mirrorsToday, Ronic and I installed the new mirrors
and got resonance. We can see the oscillations
in this high-finesse case. We haven't
 New_mirrors.pngoscillations.jpglocking.jpg 
  181   Tue Jan 16 18:42:42 2024 Xinyi LuFixedinfolasers and opticsOptical roomFSR and Finesse measurement- Today, Ronic and I measured the finesse
and FSR after optimizing the locking. FSR
was adjusted to 160.27 MHz to match the pulsed
 Screenshot_2024-01-16_2_145546.pngScreenshot_2024-01-16_4_150258.png 
  180   Mon Jan 15 19:19:00 2024 Xinyi LuFixedinfolasers and opticsOptical roomCoupling efficiency improvement- We got 30% coupling efficiency by installing
a set of telescopes, adjusting the polarization
and optimizing the alignment. The diameter
 coupling_efficiency.jpgcavity_locking.jpg 
  179   Wed Jan 10 18:35:46 2024 Xinyi LuFixedinfolasers and opticsOptical roomCoupling efficiency improvement- Recently we have focused on improving
the coupling efficiency. Without the telescope,
the original coupling efficiency was less
 Coupling_efficiency_0110.jpgdamaged_spot_on_M1.png 
  178   Wed Dec 20 10:45:37 2023 Xinyi LuFixedreportlasers and opticsOptical roomMounts installation and cavity alignment- Over the last few days, Viktor, Ronic
and I have reinstalled the mounts and realigned
the cavity with CW laser and old mirrors.
 resonances.jpgcavity_mode.jpgcavity_mode_diameter.jpg 
  177   Thu Dec 14 17:52:53 2023 Xinyi LuFixedreportlasers and opticsOptical roomMounts installation and cavity alignmentOver the past few days, Viktor, Ronic and
I have continued to align the cavity.
We installed 4 mirrors and monitored the
 CCD.jpgoscillograph.jpg 
  176   Fri Dec 8 18:59:24 2023 Xinyi LuFixedreportlasers and opticsOptical roomMounts installation and cavity alignmentOver the last two days, Viktor, Ronic and
I have started to install the mirror mounts
and try to align the cavity.
  
  175   Thu Dec 7 09:30:03 2023 Ronic ChicheFixedinfomechanics | lasers and optics | detectors and electronics | softwareOptical roomnew setup for the 160MHz Menhir oscillatorfrom the begining of the week, Xinyi, Aurélien,
Viktor and myself started to install a new
setup for the Menhir 160MHz oscillator.
 Plan_SBOX_@_160MHz.pptxImplantation_disymmetric.mIMG_20210519_155329.jpg 
  174   Thu Dec 7 09:09:27 2023 Ronic ChicheFixedinfolasers and opticsThomX iglooNew mirrors batch informationsthe 2 files describe the specfications
for the 16 mirrors ordered (4 for ThomX +
spare, 4 for SBOX + spare) and the measurements
 miroirs_puma_2022_thomx_Kbox.docxMiroirs_à_1031_nm-ThomX_-_KBox_Mars_2023.pdfRecap_miroirs_KBOX_et_THOMX.xlsx 
  173   Fri Jan 6 12:33:18 2023 Ronic ChicheFixedinfolasers and opticsOptical roomLaser Menhir reinstallation + CVBG + fiber injectionThe lab purchased the Menhir laser @ 216MHz.

it has been sent back to Menhir
photonics for inspection, and then is now
 MenhirJan2022.PNG 
  172   Wed Sep 28 18:43:51 2022 Manar AmerFixedreportlasers and opticsOptical roomM2 ThomX spherical Cleaning Today, M2 Spherical-3 from ThomX that was
installed inside the SBox was removed, there
was one big dust on the surface of the mirror,
 6x 
  171   Tue Sep 27 19:30:49 2022 Manar AmerFixedreportlasers and opticsOptical roomM1 Gamma FactoryIn the morning, Vacuum broken and rotated
M1 ThomX 90 degrees clockwise, locked the
cavity in air and we observe a degeneracy
 00mode_ThomX_Mirror_degeneracySpot_1point04ms.jpg00mode_ThomX_Mirror_degeneracySpot_saturateat50.jpgCoupling_mirror_.jpeg 
  170   Mon Sep 26 16:15:06 2022 Manar AmerFixedreportlasers and opticsOptical roomM1 ThomX used while shifted from damaged spot On Wednesday 21st , I opened the cavity
did an additional 2 mm shift of the injection
mirror and put it under vacuum again.
 00mode_damaged_0_26ms.jpg00mode_damaged_saturted_50ms.jpgreflection_noLock.jpgreflection_Lock_0_15ms.jpg 
  169   Wed Sep 21 12:10:07 2022 Manar AmerFixedreportlasers and opticsOptical roomM1 ThomX used while shifted from damaged spot To compare between the 2 images of the
cavity mode:


the mode by itself has
  
  168   Tue Sep 20 12:50:40 2022 Manar AmerFixedreportlasers and opticsOptical roomM1 ThomX used while shifted from damaged spot Yesterday , we locked the cavity and we
see a sign of a high finesse on the transmission
signal, but no measurement of Finesse was
 Screenshot_2022-09-19_2_172943.pngScreenshot_2022-09-19_1_171834.png00mode_LOCK.jpg00mode_LOCK_saturaed.jpg 
  167   Fri Sep 16 17:47:56 2022 Manar AmerFixedreportlasers and opticsOptical roomDamage on mirror surface ThomX injection mirror has been cleaned
and placed again inside the optical cavity.

This time to avoid the damaged
  
  166   Fri Sep 16 15:56:45 2022 Manar AmerFixedreportlasers and opticsOptical roomDamage on mirror surface a better image of the damaged spot, image
taken with the arrow for the reflective surface
facing the other direction (image shows position)
 M1_mirror_on_Microscope_stand0.jpgM1X_front_min_zoom.jpgM1X_front_max_zoom.jpgM1X_front_damaged_spot_max_zoom.jpg 
  165   Wed Sep 14 17:21:59 2022 Manar AmerFixedreportlasers and opticsOptical roomPower storage In CavityWe improved the lock using the alignment,
polarization and CEP , the maximum we got
was ~ 12% coupling
 Screenshot_2022-09-14_0_161520.png 
  164   Wed Sep 14 16:16:08 2022 Manar AmerFixedreportlasers and opticsOptical roomPower storage In CavityThe cavity was locked under vacuum, coupling
is approximately < 10%

The lock was relatively easy and
 High_Finesse_sign_on_transmission_.jpgScreenshot_2022-09-14_0_161520.png 
  163   Tue Sep 13 19:31:14 2022 Manar AmerFixedreportlasers and opticsOptical roomliPower storage In CavityAfter changing the mirror M1 and cleaning
the 2 mirrors

They were placed in the cavity
 Screenshot_2022-09-13_0_184445.png 
  162   Tue Sep 13 19:26:27 2022 Manar AmerFixedreportlasers and opticsOptical roomDamage on mirror surface After discussing, we have decided against
shifting the mirror to avoid the time lost.

We changed the injection mirror
  
  161   Mon Sep 12 18:50:57 2022 Manar AmerFixedissuelasers and opticsOptical roomDamage on mirror surface Tomorrow will try to shift the injection
mirror to avoid hitting the damaged spot.

 
  
  160   Mon Sep 12 18:49:42 2022 Manar AmerFixedissuelasers and opticsOptical roomDamage on mirror surface Following the storage of ~ 50 kW inside
the cavity and a sudden drop in transmitted
power from the cavity 
 image001.jpgimage002.jpgimage004.jpg 
  159   Mon Sep 12 17:00:35 2022 Manar AmerFixedreportlasers and opticsOptical roomPower storage In Cavityat max stage we reached at 2.5
A on the diodes we have

8000 gain , coupling ~
 00mode_higer.jpg00mode_Removed_higer.jpg 
  158   Mon Sep 12 16:27:14 2022 Manar AmerFixedreportlasers and opticsOptical roomPower storage In CavityPower increased in the amplifier

reflective filters added at the
transmission point to be able to have signal
  
  157   Fri Sep 9 19:03:58 2022 Ronic ChicheFixedinfomechanics | lasers and optics | detectors and electronicsOptical roomD-shape mirrors positionning statusThe cavity box is vacuum pumped at 6*10^-2
mbar.

  
  156   Fri Sep 9 18:35:07 2022 Ronic ChicheFixedinfomechanics | lasers and optics | detectors and electronicsOptical roomD-shape mirrors positionning statusThis afternoon we opened the cavity and
put the D-shape mirrors at their correct
place, close to the beam.
  
  155   Fri Sep 9 15:47:46 2022 Manar AmerFixedreportlasers and opticsOptical roomPower storage In CavityAt transmission power of 42 mW, coupling
60%, we see fundamental mode with a degeneracy

The D-shape motors were moved to
 Transmission_after_S2.jpg 
  154   Fri Sep 9 14:44:35 2022 Manar AmerFixedreportlasers and opticsOptical roomPower storage In CavityWe start of power output from amplifier
of 1W with only the first and second stage
on then we start with the third stage power
  
  153   Fri Sep 9 12:49:44 2022 Manar AmerFixedreportlasers and opticsOptical roomLocking Amplifier with Cavity Alignment was improved to ~ 1.2 V on the
photodiode.

Only the second stage was on with
  
  152   Fri Sep 9 12:45:19 2022 Manar AmerFixedreportlasers and opticsOptical roomLocking Amplifier with Cavity image of the lock with Coupling of ~ 60%

 

 Screenshot_2022-09-09_0_120737.png 
  151   Fri Sep 9 11:50:17 2022 Manar AmerFixedreportlasers and opticsOptical roomLocking Amplifier with Cavity We locked the cavity, and it is stable
using the Transmission,

the high frequency that we thought
  
  150   Thu Sep 8 18:28:51 2022 Manar AmerFixedreportlasers and opticsOptical roomLocking Amplifier with Cavity We wanted to increase the power of the
amplifier to measure the transmission output
at M2,
  
  149   Thu Sep 8 14:58:51 2022 Manar AmerFixedreportlasers and opticsOptical roomLocking Amplifier with Cavity We managed to lock the cavity by adding
the AOM , but the lock is still difficult
to stabilize.
 Screenshot_2022-09-08_2_144338.png 
  148   Thu Sep 8 13:39:03 2022 Manar AmerFixedreportlasers and opticsOptical roomLocking Amplifier with Cavity We played on the CEP using the USB command
"id0=xxxxx" of the Menhir.

we put id0=48650 and we improved
 Screenshot_2022-09-08_0_133245.png 
  147   Thu Sep 8 11:16:40 2022 Manar AmerFixedreportlasers and opticsOptical roomLocking Amplifier with Cavity Today, we played on the CEP but using the
I-tune input of the Menhir Laser (+/- 5V
maximal range).
  
  146   Wed Sep 7 18:58:03 2022 Manar AmerFixedreportlasers and opticsOptical roomLocking Amplifier with Cavity Today we managed to observe the fundamental
mode and stabilize the scan on it until we
improved the alignment enough.
 20220907_00mode.jpg20220907_00mode_diameter.jpgScreenshot_2022-09-07_0_174654.pngScreenshot_2022-09-07_2_182520.png 
  145   Wed Sep 7 18:57:20 2022 Manar AmerFixedreportlasers and opticsOptical roomTelescope / amplifier outputWe increased the power of the amplifier
up to 10 W to see if there is a change in
the beam shape at the injection point or
  
  144   Tue Sep 6 17:47:40 2022 Ronic ChicheFixedissuelasers and opticsOptical roomunsuccessful telescope design :-(we wanted to calculate the right telescope
with 2 spherical lenses.

1) we have the FP cavity mode size
 image_at_z_being_40mm.pngbeam_fit_at_z_being_40mm.pngpropagation_fit.png 
  143   Mon Sep 5 18:06:53 2022 Manar AmerFixedreportlasers and opticsOptical roomTelescope / amplifier outputAm adjustment on the lenses position to
have a smaller waist.

+ 250 mm @ 88 cm from amplifier
 20220905_Telescope_lense_placement.jpg 
  142   Fri Sep 2 18:10:10 2022 Manar AmerFixedreportlasers and opticsOptical roomTelescope / amplifier outputNote the
correct beam divergence is approximately
~ 2.3 mrad
 Ampli_Celia_2.3mrad_divergence_New_Telescope.jpgBeam_waist_at_injection_image.jpg 
  141   Fri Sep 2 17:50:21 2022 Manar AmerFixedreportlasers and opticsOptical roomTelescope / amplifier outputremoving the reading which is not correct
(wrong use of software)

redone a reading similar using
 Beam_Profile_Fit_using_gaussian_Beam.jpgBeam_Profile_Fit_using_gaussian_Beam.xml 
  140   Wed Aug 31 18:14:51 2022 Ronic ChicheFixedinfolasers and opticsOptical room2nd stage CELIA amplifiertoday we did several test with the Dichroic
shortpass mirror (Thorlabs DMSP1000) and
with a 10nm optical filter around 1030nm
 image_faisceau_multimode_@1030nm.PNG 
  139   Tue Aug 30 17:48:39 2022 Ronic ChicheFixedinfolasers and opticsOptical room2nd stage CELIA amplifiertoday, we measured the 2nd stage CELIA
amplifier pump wavelength : 970-990 nm
 2nd_stage_pump_wavelength.jpg 
  138   Wed Aug 24 10:45:24 2022 Manar AmerFixedreportlasers and opticsOptical room2 Mirror Setup @ 216.6 MHzAdding information about the 2 mirror cavity
setup (plan - spherical)
that is currently installed.
 manip2miroirs.pptx2mirror_plan_shperical_beam_size.png 
  137   Wed Aug 24 10:39:58 2022 Manar AmerFixedreportlasers and opticsOptical roomTelescope / amplifier outputHere is a view of beam propagation in the
optical software : GaussianBeam

the red filled shape is the model
 Capture.PNGTelescope_AMPLI_CELIA_1.xml 
  136   Tue Aug 23 17:37:38 2022 Manar AmerFixedreportlasers and opticsOptical roomTelescope / amplifier outputI placed a periscope to adjust the high
of the beam from the amplifier output from
~ 10 cm from the table to ~ 15 cm
 20220823_setup.jpg 
  135   Mon Aug 22 18:39:13 2022 Manar AmerFixedreportlasers and opticsOptical roomAmplifier output Beam ProfileBeam divergence after amplifier 4.46 mrad

 

  
  134   Mon Aug 22 18:38:03 2022 Manar AmerFixedreportlasers and opticsOptical roomTelescope / amplifier outputBeam divergence was measured using a method
called  "Focal
 Focal_length_divergence_method.pdfBeam_Profile_at_high_power_.jpgSBOX_CELIA_AMPLIFIER_Divergence_measurement.pdf 
  133   Fri Aug 19 16:36:18 2022 Manar AmerFixedreportlasers and opticsOptical roomTelescope / amplifier outputThe previous Sbox telescope was dismantled
and the mechanical components cleaned.

its lenses are still in the mounts,
  
  132   Fri Aug 19 16:31:11 2022 Manar AmerFixedreportlasers and opticsOptical roomAmplifier output Beam ProfileIn preparation to measure the output beam
profile from the amplifier at high power,
I have placed two wedge mirrors just before
 20220819_Setup.jpg 
  131   Fri Aug 19 16:03:40 2022 Manar AmerFixedreportlasers and optics | detectors and electronics | softwareOptical roomCVBG stretching / Fiber Injection closing series




  
  130   Fri Aug 19 16:03:17 2022 Manar AmerFixedreportlasers and optics | detectors and electronics | softwareOptical roomAlignment / Table setup closing series




  
  129   Fri Aug 19 16:02:33 2022 Manar AmerFixedreportlasers and optics | detectors and electronics | softwareOptical roomCELIA amplifier installation + chillerClosing series




  
  128   Fri Aug 12 17:48:28 2022 Ronic ChicheFixedreportlasers and opticsOptical room"ThomX" CELIA Amplifier commissionningthis afternoon, with Fabian, we did some
measurements on the 3rd stage.

finally we
  
  127   Fri Aug 12 11:46:17 2022 Ronic ChicheFixedinfolasers and opticsOptical roomOEwaves lock and Finesse measurementthis morning, I locked the FP cavity with
the OEwaves CW laser and the "Fred fiber
amplifier" used at 500mA of pump current.
  
  126   Thu Aug 11 19:27:09 2022 Ronic ChicheFixedinfolasers and optics | detectors and electronicsOptical roomKoheras CW laser lock on FP cavityI locked the Koheras CW on the FP cavity
but the lock was pretty noisy and very difficult
to acquire.
  
  125   Thu Aug 11 12:11:48 2022 Ronic ChicheFixedreportlasers and opticsOptical room"ThomX" CELIA Amplifier commissionningBeam size at the amplifier output:

to make this measurement, I switched
ON only 1st and 2nd stage.
 Capture.PNGCapture2.PNG 
  124   Wed Aug 10 12:51:16 2022 Ronic ChicheFixedreportlasers and opticsOptical room"ThomX" CELIA Amplifier commissionningThe "ThomX" CELIA amplifier is
installed on the optical table.
I added all the rubber pieces available
  
  123   Mon Aug 8 17:58:32 2022 Ronic ChicheFixedinfolasers and opticsOptical roomPulse duration measurement before and after CVBG (as a strecher)I recorded the pulse shape of the MENHIR
216MHz in its fiber injection setup.
the fiber is then connected to the
 pulse_measurement_without_and_with_CVBG.pngpulse_measurement_after_CVBG_compared_with_convolution.pngSpectrumafterCVBGzoom.png.png 
  122   Mon Aug 8 11:11:28 2022 Aurélien MartensFixedreportutilitiesOptical roomchiller for CELIA amplifiertoday, temperature of the chiller has been
set to 23°C.

measured temperature in the chiller
  
  121   Thu Jul 28 13:52:23 2022 Aurélien MartensFixedreportutilitiesOptical roomchiller for CELIA amplifierThe chiller of CELIA amplifier has been
moved from the corridor to the changing room
in front of PLIC. 
  
  120   Fri Jul 22 18:25:31 2022 Manar AmerFixedreportlasers and optics | detectors and electronics | softwareOptical roomCELIA amplifier installation + chillerThe software to control the CELIA amplifier
is on the laptop that was placed in ThomX
bunker.
  
  119   Fri Jul 22 18:19:13 2022 Manar AmerFixedreportlasers and optics | detectors and electronics | softwareOptical roomCVBG stretching / Fiber Injection Before injecting into the amplifier, the
pulse needs to be stretched using a CVBG,
type attached.
 7x 
  118   Fri Jul 22 18:00:21 2022 Manar AmerFixedreportlasers and optics | detectors and electronics | softwareOptical roomAlignment / Table setup The current setup of the optical table
attached.

The cavity is aligned and the lock
 20220722_table_setup.jpg20220722_tablesetup.jpg 
  117   Fri Jul 22 17:10:06 2022 Manar AmerFixedreportlasers and optics | detectors and electronicsOptical roomInstallation of D-shaped mirror / AlignmentThe D-shaped mirrors are installed properly
and not cutting the path of the beam.

The cavity has been aligned again
  
  116   Fri Jul 22 17:07:32 2022 Manar AmerFixedreportlasers and optics | detectors and electronics | softwareOptical roomCELIA amplifier installation + chillerAmplifier placed next to the pulsed laser
on the table under the airflow

The output is in free space with
 WhatsApp_Image_2022-07-22_at_4.26.24_PM.jpgWhatsApp_Image_2022-07-22_at_4.26.24_PM.jpgWhatsApp_Image_2022-07-22_at_5.02.24_PM.jpg 
  115   Tue Jul 12 19:07:50 2022 Manar AmerFixedreportlasers and optics | detectors and electronics | softwareOptical roomCELIA amplifier installationThe amplifier was installed on the optical
table next to SBox table.

The CVBG that will be used for
  
  114   Tue Jul 12 18:53:55 2022 Manar AmerFixedreportlasers and optics | detectors and electronicsOptical roomInstallation of D-shaped mirror / AlignmentTo prepare for the amplifier. I installed
the D-shapped mirrors after cleaning (using
aceton and ethanol) between the cavity 2
  
  113   Tue Jul 12 14:41:55 2022 Manar AmerFixedreportlasers and optics | detectors and electronicsOptical roomFSR change & Finesse Measurements a Finesse of 30k with the present mirrors
:

T1=120 ppm ;A1=(2.6+1) ppm;
  
  112   Tue Jul 12 10:19:30 2022 Manar AmerFixedreportlasers and optics | detectors and electronicsOptical roomFSR change & Finesse Measurements Yesterday evening the cavity was Vacuum
pumped up to pressure of 5.5*10^-2 and locked 

changed FSR to be 216.662 MHz and
 Screenshot_2022-07-11_1_204143.pngScreenshot_2022-07-11_0_203646.png 
  111   Tue Jul 12 10:07:05 2022 Manar AmerFixedreportlasers and optics | detectors and electronicsOptical roomFSR change & Finesse Measurements The FSR of the 2 mirror (plan-spherical)
Cavity was adjusted from 210 MHz to reach
216.643 MHz
 00mode.jpg00mode_diameter.jpg00mode_diameter_fit.jpg 
  110   Fri Jul 8 19:37:24 2022 Manar AmerFixedreportlasers and optics | detectors and electronicsOptical room2 Mirror Setup @ 216.6 MHzUpdate for Finesse measurement, The cavity
was put under vacuum ~ 1.1*10^-1 mbar

and the alignment and coupling
 Screenshot_2022-07-08_2_182405.png 
  109   Fri Jul 8 17:48:48 2022 Manar AmerFixedreportlasers and optics | detectors and electronicsOptical room2 Mirror Setup @ 216.6 MHzThe cavity was realigned using irises instead
of pinholes, gave a better alignment.

The inside of the box, the spherical
 00mode.jpg00mode_diameter.jpgScreenshot_2022-07-08_0_164115.pngSlide1.JPGSlide2.JPG 
  108   Fri Jul 8 17:10:44 2022 Manar AmerFixedreportlasers and opticsOptical roomImages of ThomX mirrors Mirror images in the previous log showing
the metal deposit of the coating of the spherical
mirrors
  
  107   Fri Jul 8 17:09:26 2022 Manar AmerFixedreportlasers and opticsOptical roomImages of ThomX mirrors Under the microscope,

the spherical mirrors show the
deposit of metal dots on the reflecting surface
 ThomX_Spherical_Front_coating.jpgThomX_Spherical_2_Front_coating.jpgThomX_Spherical_back.jpg 
  106   Wed Jul 6 19:57:17 2022 Manar AmerFixedreportlasers and optics | detectors and electronicsOptical room2 Mirror Setup @ 216.6 MHzThe SBox cavity setup was changed to have
only 2 mirrors M1 plane and M2 spherical,
both from ThomX
 20220706_Setup.jpgScreenshot_2022-07-06_1_181116.pngFinesse_Fit.jpg00mode.jpg00mode_diameter.jpg 
  105   Wed Jul 6 18:39:38 2022 Manar AmerFixedreportlasers and optics | vacuumOptical roomSBox Finesse at 216.6625 MHz 




  
  104   Wed Jul 6 18:39:25 2022 Manar AmerFixedreportlasers and optics | vacuumOptical roomSBox Finesse at 216.6625 MHzMax Finesse obtained @ 4 mirror setup was
~ 19 300  

With M1 from ThomX , M2/M3/M4 from
  
  103   Wed Jul 6 18:37:02 2022 Manar AmerFixedreportlasers and opticsOptical roomDivergence of the CW beam after collimator Closing the series of the telescope for
the beam @ 133.33 MHz

 
  
  102   Wed Jul 6 18:35:38 2022 Manar AmerFixedreportlasers and opticsOptical roomFundamental Mode TEM00Closing series of 00 mode for FSR @ 133.33
MHz

 
  
  101   Wed Jul 6 18:34:12 2022 Manar AmerFixedreportlasers and optics | detectors and electronics | softwareOptical roomCavity Lock Closing the series for the setup

The cavity was only locked @ 133.33
MHz but the Finesse was not measured
  
  100   Mon Jun 27 08:52:46 2022 Manar AmerFixedreportlasers and optics | vacuumOptical roomSBox Finesse at 216.6625 MHzThe Sbox currently has the injection from
ThomX installed T ~ 120 ppm , M2 planar from
Sbox spare and M3 / M4 spherical mirrors
 20220624_SBox_MENHIR.pptx 
  99   Tue Jun 21 23:52:28 2022 Manar AmerFixedreportmechanics | lasers and optics | detectors and electronicsOptical roomMenhir Pulsed LaserThe SBox Length (FSR), was changed to match
the repetition rate of the Menhir
pulsed laser Frep = 216.6625 MHz
 MENHIR_injection_into_fiber.jpgSBox_M.jpg20220620_SBox_MENHIR.pptx 
  98   Thu Jun 9 19:59:42 2022 Manar AmerFixedreportlasers and optics | detectors and electronics | softwareOptical roomCavity Lock Cavity locked today under vacuum and no
airflow, it is stable over a long time

the alignment was improved and
 00_Mode_Locked_Under_vacuum.bmpMa1_Ma2_Horizontal_end-of-day.jpgMa1_Ma2_Vertical_end-of-day.jpg 
  97   Wed Jun 8 11:31:47 2022 Manar AmerFixedreportlasers and optics | detectors and electronics | softwareOptical roomCavity Lock Current setup at SBox for locking the cavity

After spacial matching, the coupling
increased to ~ 15 - 20 % 
 20220607_SBox_Setup.pngMa1_Ma2_Horizontal_end-of-day.jpgMa1_Ma2_Vertical_end-of-day.jpg 
  96   Wed Jun 8 11:24:35 2022 Manar AmerFixedreportlasers and opticsOptical roomTelescope - Spacial Matching Divergence of the CW beam out of the collimator
measured after 1 meter to be 


 SBox_Spacial_Matching_Telescope.png 
  95   Wed Jun 8 11:10:17 2022 Manar AmerFixedreportlasers and optics | detectors and electronics | softwareOptical roomCavity Lock Start with the cavity lock images attached,
taken from last week, at
start we have a coupling ~ 5%  and started
 Screenshot_2022-05-30_0_125247.png20220530_00_Mode.bmp11.bmp 
  94   Wed Jun 8 10:58:15 2022 Manar AmerFixedreportlasers and opticsOptical roomFundamental Mode TEM00Images of the Transmitted beam at M2 mirror
at different days. 

The first one was from last week,
 20220530_00_Mode.bmp00_Mode_Beam_Transmitted_Position_drift_due_to_temperature.bmp 
  93   Wed Jun 8 10:47:45 2022 Manar AmerFixedreportlasers and opticsOptical roomSBox Alignment Closing Series for Alignment.

Beating observed, beam is in the
locking stages
  
  92   Wed May 25 17:34:29 2022 Manar AmerFixedreportlasers and opticsOptical roomFundamental Mode TEM00Adding images from the transmission after
the spherical mirrors M3 and M4 window for
a resonating mode inside the cavity.
 beamviwer_transmission_at_M3.bmpbeamviwer_transmission_at_M4.bmp 
  91   Tue May 24 22:11:40 2022 Manar AmerFixedreportlasers and opticsOptical roomFundamental Mode TEM00The current setup for the SBox has a beam
viewer and 2 photodiodes placed at reflection
and transmission.
 20220524_SBox_Setup.png00mode_CW_piezo_drive.bmp00mode_11mode.bmp 
  90   Tue May 24 22:05:48 2022 Manar AmerFixedreportlasers and opticsOptical roomSBox Alignment The external and internal alignment was
redone.

External Alignment : the collimator
 7x 
  89   Tue May 24 21:51:01 2022 Manar AmerFixedreportlasers and optics | utilitiesOptical roomSpincoater - Mirrror cleaning While repeating the alignment, the mirrors
were cleaned using the spin-coater and placed
again.
  
  88   Wed May 11 21:10:27 2022 Manar AmerFixedreportlasers and opticsOptical roomSBox Alignment M2 Sbox changed to spare. Alignment of
M2 was redone. 

With the help of Ronic , We observe
 TM00_mode.jpgTM01_mode.jpgTM10_mode.jpg 
  87   Wed May 11 20:51:28 2022 Manar AmerFixedreportlasers and optics | utilitiesOptical roomSpincoater - Mirrror cleaning Following the observation that when rotating
M2 plan mirror of SBox the deformation position
of the mode changes.
 M2_spare_fb_2.jpgM2_spare_fa_2.jpg20201210_M2_spare_after_cleaning.tif 
  86   Wed May 11 09:19:48 2022 Manar AmerFixedreportlasers and opticsOptical roomSBox Alignment Yesterday, to find the source of why the
mode is deformed, I tried to rotate the mirrors
to see if there is a change.
 Beating00_after_rotatingM2_2.jpg 
  85   Mon May 9 19:27:35 2022 Manar AmerFixedreportlasers and optics | utilitiesOptical roomSpincoater - Mirrror cleaning PowerPoint shows the detailed images of
all the mirrors before and after cleaning.

Images of SBox mirrors and M1 from
 20220509_Images_SBox_Mirrors.pptxM1GFA.jpgM2FA.jpgM3FA.jpgM4FA.jpg 
  84   Mon May 9 19:05:35 2022 Manar AmerFixedreportlasers and opticsOptical roomSBox Alignment Today; replaced the M1 SBox mirror with
M1 from gamma factory , following the previous
alignment.
 M2_alignment_M3_pinhole.jpgM3_alignment_M4_pinhole.jpgM4_alignment_M1_pinhole.jpgBeating_TM00_CW_piezo_drive.jpg 
  83   Mon May 9 18:36:48 2022 Manar AmerFixedreportlasers and opticsOptical roomSBox Alignment Last week In FP cavity we had all SBox
mirrors including the damaged M1 mirror.

The beating was observed with just
 Beating_TM00_SBox_damaged_M1.jpgBeating_HigherOrder_SBox_damaged_M1.jpg 
  82   Wed Apr 27 22:30:14 2022 Manar AmerFixedreportlasers and optics | utilitiesOptical roomSpincoater - Mirrror cleaning Images of the SBox mirrors cleaned at the
same time when the cavity was aligned.

Directly from the spincoater to
 Images_SBox_Mirrors.pptx 
  81   Wed Apr 27 22:13:37 2022 Manar AmerFixedreportlasers and opticsOptical roomSBox Alignment Finished the alignment of the SBox with
M1 of SBox placed, to be changed to gamma
factory mirror later
 all_mirrorsplaced_after_m2_window.jpg20222704_SBox_alignment.pptx 
  80   Tue Apr 26 20:08:10 2022 Manar AmerFixedreportlasers and opticsOptical roomSBox Alignment
Adjust the placement of
the Irises  (done at the start of the
 9x 
  79   Mon Apr 25 18:02:09 2022 Manar AmerFixedreportlasers and opticsOptical roomSBox Alignment Remember to update the position of the
reference Irises tomorrow !!!!

  
  78   Mon Apr 25 17:58:01 2022 Manar AmerFixedreportlasers and opticsOptical roomSBox Alignment After pointers and Advice from Aurélien,

improvement of the beam alignment
through M1 and M2 irises was done.
 Ma1_Ma2_Horizontal_Position_Optimized.pngMa1_Ma2_Vertical_Position_Optimized.pngAfter_M1_diaphram_1m_Saturated_Beam_Optimized.jpgAfter_M2_M1_diaphram_Saturated_Beam_Optimized.jpgAfter_M2_M1_diaphram_Beam_Optimized.jpg 
  77   Mon Apr 25 17:28:29 2022 Manar AmerFixedreportlasers and opticsOptical roomSBox Alignment SBox alignment, using CW laser Koheras
power 1 mW


 6x 
  76   Wed Apr 20 19:05:37 2022 Manar AmerFixedreportlasers and opticsOptical roomKBox Alignment Starting with the alignment of the KBox
using CW Koheras.

The size of the CW output from
 7x 
  75   Wed Apr 13 18:42:50 2022 Manar AmerFixedreportlasers and optics | utilitiesOptical roomSpincoater - Mirrror cleaning Used the spincoater and pure water to clean
dielectric mirrors which will be installed
inside the SBox for directing the reflection
 Reflection_one_front_after_cleaning.jpgreflection_two_front_before_cleaning.jpgReflection_two_front_after_cleaning.jpg 
  74   Fri Apr 8 19:27:12 2022 Manar AmerFixedissuedetectors and electronics | utilitiesOptical roomClean Airflow Dust measurementsDust measurement done today on  top
of the SBox average 10min

 20220408_DustMeasurement.jpg 
  73   Mon Apr 4 13:58:23 2022 Manar AmerFixedissuedetectors and electronics | utilitiesOptical roomClean Airflow Dust measurementsThe dust meter cap was cleaned using Alcohol,
and using the filter white cap the dust count
was (0 Av. 10 min)
  
  72   Thu Mar 31 13:29:01 2022 Manar AmerFixedreportmechanics | lasers and optics | utilitiesOptical roomDust Cleaning of SBoxAfter an overnight where the cavity box
was left open, a measurement of the Dust
meter was taken:
 20220331_Dust_Meter_Outside_cavity_Av10min.jpg20220331_Dust_Meter_Inside_cavity_Av10min.jpg 
  71   Wed Mar 30 18:53:01 2022 Manar AmerFixedreportmechanics | lasers and optics | utilitiesOptical roomDust Cleaning of SBoxThe inside of the cavity was cleaned today.
It was very dirty and had big dust particles
and fibers inside.
 6x 
  70   Tue Mar 29 16:27:34 2022 Manar AmerFixedreportutilitiesOptical roomSpincoater - Mirrror cleaning In preparation for cleaning the mirrors.

The spincoater has been moved with
its bump into the sas of the SBox.
  
  69   Tue Mar 29 16:23:00 2022 Manar AmerFixedreportlasers and optics | cablingOptical roomMightylaser Amplifier Migthylaser amplifier has been moved from
the SBox table to the PLIC table.

 
  
  68   Wed Mar 23 18:17:45 2022 Manar AmerFixedreportutilitiesOptical roomDust Cleaning of SBoxThe cleaning was done twice with half an
hour interval between the two times
reading on the dust meter was taken
  
  67   Wed Mar 23 18:11:22 2022 Manar AmerFixedreportutilitiesOptical roomDust Cleaning of SBoxAn Initial cleaning of the KBoX outside
was done, All the optics and mechanics placed
that were on the table were removed.
 Log_Top_window.jpgLog_Reflection_window.jpgLog_Injection_Side_window.jpgLog_Injection_side_window2.jpg 
  66   Mon Jul 5 14:46:44 2021 Manar AmerFixedreportlasers and optics | detectors and electronicsOptical roomOEwaves CW Laser - Phase Noise correction on unit 1030 nm




  
  65   Mon Jul 5 14:40:57 2021 Manar AmerFixedreportlasers and optics | detectors and electronicsOptical roomOEwaves CW Laser - Phase Noise a correction on the wavelength of the laser 
it is 1030 um 

  
  64   Mon Jul 5 14:14:01 2021 Manar AmerFixedreportlasers and optics | detectors and electronicsOptical roomOEwaves CW Laser - Phase Noise
We started measuring the phase
noise on the OEwaves CW laser.

Class
3b
wavelength 1.5 um


The
 20210207_OEwaves_laser.jpg20210207_Self_coupling_setup.jpgSchematic-setup-for-optical-delayed-self-coupling-detection.png 
  63   Thu Jun 10 17:55:15 2021 Ronic ChicheFixedinfolasers and opticsOptical roomOrigami SN2440 133MHz laser testsToday, we received the Origami SN2440 133MHz
oscillator from repair (NKT mentioned a defective
wire inside the controller....)
 IMG_20210610_161502.jpgspectre_133MHz.PNGScreen_0015.png 
  62   Tue Jan 12 10:44:57 2021 Ronic ChicheFixedissuelasers and opticsOptical roomOrigami SN2440 133MHz laser power measurment... and failurewe received from NKT the Origami SN2440
133MHz oscillator from repair on 2020/12/17
and we measured the power trend from
 133mhzpower.PNG133mhz_power_zoom.png 
  61   Tue Jan 5 12:38:04 2021 Manar AmerFixedreportlasers and opticsOptical roomTransmission Measurements for the Mirrors.
Thursday 10 December 2020:  
First Test Measurement - Inside Box

 The
transmission ( T ) for the mirrors of SBOX
 6x 
  60   Wed Dec 16 12:36:37 2020 Loïc AmoudryFixedreportlasers and opticsOptical roomMirror's cleaning and microscope imagingOn 10th of december 2020 we cleaned the
SBOX mirrors and took microscope images
(the name of the images indicates what they
 14x 
  57   Thu Feb 6 16:58:57 2020 Loïc AmoudryFixedreportlasers and opticsOptical roomPower up to 48kW crater effect againAs we said, after glow discharge and spin
coater we recovered a low power finesse ~23000
(aligning away from the M1 crater).
 3A_136mWtrans.png4A_126mWtrans.pngmode_strange.png 
  56   Thu Feb 6 11:01:08 2020 Ronic ChicheFixedreportlasers and opticsOptical roomanalysis of stored and reflected powerwith this Finesse around 22-23k, the technique
comparing TRANSMISSION and REFLECTION signals
doesn't work, even in taking into account
 untitled.png 
  55   Wed Feb 5 16:46:01 2020 Loïc AmoudryFixedreportlasers and opticsOptical roomSBOX mirrors cleanedToday we put the cavity to vacuum (~ 0.1
mBar) and we measured again the Finesse with
Koheras and modulation technique.
  
  54   Wed Feb 5 14:47:16 2020 Loïc AmoudryFixedreportlasers and opticsOptical roomSBOX mirrors cleanedYesterday, after installation and alignment
of mirrors and cavity, the Finesse has been
measured with cavity at air pressure, with
  
  53   Wed Jan 29 19:04:38 2020 Loïc AmoudryFixedreportlasers and opticsOptical roomSBOX mirrors cleanedToday, SBOX mirrors have been cleaned with
spin coater on HR face and isoprop on back
face. They show similar spots as before.
  
  52   Wed Jan 29 19:00:02 2020 Loïc AmoudryFixedreportlasers and opticsOptical roomGlow discharge cleaner on SBOX mirrorsThe glow discharge cleaner has been tested
on the SBOX mirrors.

I've put them 1 by 1. Each
 glow.PNG 
  51   Fri Jan 24 17:58:45 2020 Loïc AmoudryFixedinfolasers and opticsOptical roomCFBG removed from ThomX CELIA amplifierThe CFBG has been removed successfully
and the amplifier is closed now.

The soldering machine had a calibration
  
  50   Fri Jan 24 17:56:11 2020 Loïc AmoudryFixedinfolasers and opticsOptical roomAFM analysis of M2We had enough time to proceed a quick scan
of M2 which has also a hole but not centered
on the mirror.
 M2.PNG 
  49   Fri Jan 24 17:52:14 2020 Loïc AmoudryFixedreportlasers and opticsOptical roomAFM analysis of M1AFM has been proceeded on M1 and M2.

The pdf shows the first images
taken with the PLIC room Leica microscope
 200115_AFM_miroirs.pdf 
  48   Fri Jan 24 16:16:24 2020 Ronic ChicheFixedreportlasers and opticsOptical roomanalysis of stored and reflected powerA chart which summarizes
the data we have or we can estimate.
 Losses.pdfM1_losses_vs_Pcav.png 
  47   Fri Jan 10 18:51:23 2020 Ronic ChicheFixedreportlasers and opticsOptical roomanalysis of stored and reflected powerthe 10th of January, we increased the power
of the amplifier to study the cavity transmitted
and reflected power signals.
 6x 
  46   Thu Jan 9 16:54:05 2020 Loïc AmoudryFixedreportlasers and opticsOptical roomMicroscope and cleaning of SBOX mirrorsThe mirrors went in the cavity the 28th
of november (We did several power up
to 30kW stored and only one to 40kW then
 resume_nettoyage_apres_sejour_dans_K-BOX_et_montee_en_puissance.PNG 
  45   Thu Dec 19 16:23:39 2019 Ronic ChicheFixedinfolasers and opticsOptical roomCavity beam axis moving with powerhow the cavity beam axis is moving during
a lock when the cavity is hot ?
could it explain a part of the Transmission
 9x 
  44   Thu Dec 19 16:03:17 2019 Ronic ChicheFixedinfolasers and opticsOptical roomBeam size behind M2Yesterday, we tried to better adapt positions
of the telescope lenses, dynamically, during
the lock, to improve the matching between
  
  42   Thu Dec 19 09:21:45 2019 Ronic ChicheFixedinfolasers and opticsOptical roomOptical amplifier polarization statepolarization state of the cavity at higher
power : 20kW, 30kW  and 33kW (slight
CEP and alignment optimization) :
 cavity_polar_3e_etage_2A_-_20kW.PNGcavity_polar_3e_etage_3A_-_30kW.PNGcavity_polar_3e_etage_3A_-_33kW.PNG 
  41   Tue Dec 17 17:58:12 2019 Ronic ChicheFixedinfolasers and opticsOptical roomBeam size behind M2the telescope matchs the cold cavity beam,
so it is normal to have a power decrease
on the transmission photodiode when the cavity
  
  40   Tue Dec 17 17:54:38 2019 Ronic ChicheFixedinfolasers and opticsOptical roomOptical amplifier polarization stateThe
polarimeter was giving a strange 50% of DOP
of the light coming from the cavity.
 cavity_polar_2e_etage_1kW.PNG 
  39   Tue Dec 17 12:16:54 2019 Ronic ChicheFixedinfolasers and opticsOptical roomOptical amplifier polarization stateWe placed a PBS + 2 photodiodes (PhD1,
PhD2) at the output of the amplifier to check
how the polarization of the amplifier changes
 Screenshot_2019-12-17_8_122311.pngScreenshot_2019-12-17_7_122157.png 
  38   Tue Dec 17 10:56:08 2019 Ronic ChicheFixedreportlasers and opticsOptical roomfirst data with 3A on the 3rd stage2 pictures :

typical beam with HOM

typical beam after moving the D-shape
 HOM_5-3_saturated.pngfundamental_mode_saturated.png 
  37   Tue Dec 17 10:46:24 2019 Ronic ChicheFixedinfolasers and opticsOptical roomBeam size behind M2Beam diameter behind M2 :

- 2nd stage @ 6A - 1kW inside cavity
sx = 2120 µm
 beam_diameter_behind_M2_-_1kW.pngbeam_diameter_behind_M2_-_30kW.png 
  36   Fri Dec 13 18:28:00 2019 Ronic ChicheFixedreportlasers and opticsOptical roomfirst data with 3A on the 3rd stageToday, at 3A on the 3rd stage, we saw some
HOM effects.
the transmissions is about 100mW which
 Screenshot_2019-12-13_3_184235.pngHOM.gif 
  35   Fri Dec 13 15:56:22 2019 Ronic ChicheFixedissuelasers and opticsOptical room2nd stage amplifier issue2nd stage output power was going down.
We checked the pump diode technical data
sheet and the operating temperature is [25°C:35°C].
  
  34   Thu Dec 12 11:49:05 2019 Ronic ChicheFixedissuelasers and opticsOptical room2nd stage amplifier issueLast time, we switched ON directly the
2nd stage at 6A without increasing/decrinsing
slowly the current.
  
  33   Wed Dec 11 17:13:02 2019 Ronic ChicheFixedissuelasers and opticsOptical room2nd stage amplifier issuethe 2nd stage amplifier needed several
hours (4-5h) to reach its nominal power (we
look at photodiode level on a scope), instead
  
  32   Tue Dec 10 09:36:56 2019 Ronic ChicheFixedinfolasers and opticsOptical roomFSR and Finesse measurementYesterday the cavity has been aligned and
locked with the CW Koheras laser.

the FSR has been measured by modulation
 untitled.png 
  31   Fri Dec 6 11:54:58 2019 Loïc AmoudryFixedreportlasers and opticsOptical roomMirror's installedThe initial 400kW SBOX mirrors which have
been cleaned ont 28th of november have been
installed this morning on the SBOX.
  
  30   Fri Dec 6 11:53:53 2019 Loïc AmoudryFixedreportlasers and opticsOptical roomMirror's cleaningXPS has been proceeded on the 400kW SBOX
mirrors M3 and M4 (the initial cavity spherical
mirrors) in frebruary 2019. Deposited a lot
 resume_M3.PNGresume_M1_M2_M4.PNG 
  29   Wed Nov 13 13:15:53 2019 Loïc AmoudryFixedreportlasers and opticsOtherAFM+ InfraRed spectroscopy (IR spectro) has been performedAFM+ InfraRed spectroscopy (IR spectro)
has been performed on 400kW S-BOX mirrors.

Seems that XPS made M3 and M4 dirty,
 191113_AFMetspecIR-miroirs_SBOX.pdf 
  59   Mon Jun 24 16:15:08 2019 Huan WangFixedinfolasers and opticsOptical roomamplifierI just had a phone call with Jérome
and he told me 2 things :

* Be carefull ! the MightyLaser
  
  58   Wed Jun 19 18:54:00 2019 Huan WangFixedinfolasers and opticsOptical roomamplifierOnefive output power is 24mW now, and 2.41mW(after
EOM) injected into fiber,

a injection power monitor
 1st_stage_amplifier_monitoring_photodiode_signal.jpg 
  28   Fri Feb 1 14:04:27 2019 Loïc AmoudryFixedinfolasers and opticsOtherMeeting with LMA people, AFM30/01/19 - The following powerpoint
shows the results discussed with LMA people.

What came out from the discussion
 POINT_SUR_LES_MIROIRS.pptx 
  27   Fri Feb 1 13:45:19 2019 Loïc AmoudryFixedreportlasers and opticsOtherAFM performed on S-BOX mirrors29/02/19 - AFM has shown that spots
on mirror's surfaces are bumps and not
holes.
 Image3.jpgImage4.jpg 
  26   Thu Jan 24 17:49:54 2019 Loïc AmoudryFixedreportlasers and opticsOptical roomImpacts on mirror's surfaceAll the mirrors show impacts on there surface
(some of them do not show deposit). Does
it come from experiments or fabrication ?
 18_M1reflectiveface2x_compressed.jpg 
  25   Thu Jan 24 17:44:21 2019 Loïc AmoudryFixedreportlasers and opticsOptical roomDeposit on S-box mirrors after return from LMACleaning on dirty surface shows something
is deposited on the surface. Cleaning displaces
and removes part of the deposit.
 28_M2ReflectiveBeforeCleaning_compressed.jpg29_M2ReflectiveAfter1stCleanPaper_compressed.jpg 
  24   Fri Dec 21 13:42:43 2018 Loïc AmoudryFixedinfolasers and opticsOptical roomMirrors features, come back from LMAMirrors arrived today from LMA. Their features
are damaged.

Photos avant ou après nettoyage,
 181201_caracteristiques_miroirs.PNG20181207_155704_resized.jpg20181207_155726_resized.jpg 
  23   Thu Nov 15 13:02:44 2018 Loïc AmoudryFixedinfolasers and opticsOptical roomMirrors cleaningThe new mirrors didn't give expected
results. Then the 4 old mirrors have been
sent to LMA on 12/11/18 for a cleaning and
  
  22   Mon Nov 5 13:11:08 2018 Loïc AmoudryFixedreportlasers and opticsOptical roomFirst run with spare mirrors


I (A)
 Plot_power_and_gain_vs_all.JPGpowerup.xlsx 
  21   Wed Oct 31 14:06:17 2018 Loïc AmoudryFixedreportlasers and opticsOptical roomM1 transmission measurementAt different positions, transmission give
194, 193, 208, 200 ppm?

  
  20   Wed Oct 31 14:04:50 2018 Loïc AmoudryFixedreportlasers and opticsOptical roomM4 transmission measurement


Loïc
  
  19   Wed Oct 31 14:03:22 2018 Loïc AmoudryFixedreportlasers and opticsOptical roomM4 transmission measurementThe kept transmission for M4 is
2.17 ppm. Which is the value
measured after alignement (center of the
  
  18   Wed Oct 31 13:51:17 2018 Loïc AmoudryFixedinfolasers and opticsOptical roomChange of the 3 ULE mirrors by 3 spare ULE mirrorsFirst finesse measurement 20 266, FSR 133.351
MHz under vacuum
 Miroirs_à_1031_nm-ThomX_-_décembre2017.pdfvacuum.isf 
  17   Wed Oct 31 13:48:58 2018 Loïc AmoudryFixedreportlasers and opticsOptical roomM1 transmission measurementCenter of M1:




I
  
  16   Wed Oct 31 13:44:22 2018 Loïc AmoudryFixedreportlasers and opticsOptical roomFinesse vs power by difference between main and second resonanceMeasurement on 25/10/2018




  
  15   Wed Oct 31 13:43:28 2018 Loïc AmoudryFixedreportlasers and opticsOptical roomFinesse vs power by difference between main and second resonanceMeasurement on 24/10/18




  
  14   Wed Oct 31 13:43:03 2018 Loïc AmoudryFixedreportlasers and opticsOptical roomPolarization frequencyMeasurement on 30/10/18.




  
  13   Wed Oct 31 13:42:22 2018 Loïc AmoudryFixedreportlasers and opticsOptical roomPolarization frequencyCheck of the frequency of the onefive locked
on each polarization of the cavity (tilt
a waveplate by 45°).
  
  12   Wed Oct 31 11:36:30 2018 Loïc AmoudryFixedreportlasers and opticsOptical roomFinesse vs power by difference between main and second resonanceMeasurements show that ratio decrease versus
power. BUT, the second resonance measurement
induce lower power in the cavity so the ratio
 CrossSecondaryResonance.mGetCavity.m 
  11   Wed Oct 31 11:27:49 2018 Loïc AmoudryFixedreportmechanics | lasers and opticsOptical roomPower measurement with D-shapeMeasurements of lot of points with D-shape
mirrors well positionned.

Power not optimized to the best
  
  10   Fri Oct 19 11:46:21 2018 Loïc AmoudryFixedreportlasers and opticsOptical roomBeam size vs D-shape positionMatlab code for size vs position and power


clear all
 size_vs_position_and_power.JPG 
  9   Fri Oct 19 11:23:27 2018 Loïc AmoudryFixedreportlasers and opticsOptical roomBeam size vs D-shape positionMeasurement done on 18/10/18.

At high power, the shape of the
0.0 mode does not change. The D-shape only
 181018_4A_no_cut.PNG 
  8   Fri Oct 19 11:13:40 2018 Loïc AmoudryFixedreportlasers and opticsOptical roomTransmission vs D-shape position at different poweMeasurements have been done on 18/10/18.

Datas are on excel file, also matlab
file.
 Plot_matlab.JPGmotors.xlsxPower_stored_vs_Dshape_mirrors_position.m 
  7   Thu Oct 18 09:42:39 2018 Loïc AmoudryFixedreportmechanics | lasers and opticsOptical roomMotors for D-shaped mirrorsMotors have been installed on 16/10/18.
No problem with them.

Effect of the motors tested on
 tek00000.pngtek0000CH1.isftek0000CH2.isftek0000CH3.isftek0000CH4.isf 
  6   Tue Oct 9 10:19:29 2018 Loïc AmoudryFixedreportlasers and opticsOptical roomRecord power-upMeasurement made on 03/10/18 (nothing has
been done since there).

Stable power in the cavity of 225
  
  5   Tue Oct 9 10:15:17 2018 Loïc AmoudryFixedreportlasers and opticsOptical roomPolarization optimizationOptimization of the polarization has been
made the 03/10/18. Checked in reflection
of the cavity in reflection&transmission
  
  4   Mon Oct 1 15:19:48 2018 Loïc AmoudryFixedreportlasers and opticsOptical roomPhase measurement with HASOwith just intensity, the coupling is 98%,
and with phase, x direction coupling is 95%,
y direction 97%, so the telescope is good.
  
  3   Mon Oct 1 14:27:35 2018 Loïc AmoudryFixedreportlasers and opticsOptical roomPhase measurement with HASO* Loic has to fix the number of files (3)
regarding the number of measurements (2)

* splitted Intensity and phase
 8x 
  2   Mon Oct 1 11:30:39 2018 Loïc AmoudryFixedreportlasers and opticsOptical roomPhase measurement with HASO2 measurement.

First one locked, in transmission
of M2 with 2nd stage 0A.Total 89 cm from
 180928_M2_0A.has1801001_input_0A.has180928_M2_trans_0A.txt 
  1   Wed Sep 26 18:12:44 2018 Loïc AmoudryFixedinfolasers and opticsOptical roomCavity polarization states (Koheras), Finesse of 2 polarization statesMeasurments of Finesse with the 2 polarization
states, let's call them H (higher) and
L (lower): 24500 for the H and 23500 for
 Finesse_higher.isfFinesse_lower.isfThe2polarizations_states_direct_trans.isfThe2polarizations_states_direct_trans.png 
ELOG V3.1.4-395e101