HOME SBOX THOMX MINICAV Utilities
SBOX orders SBOX installation SBOX commissioning SBOX control command
  Status of commissioning, report also here plots are reports.  Not logged in ELOG logo
Message ID: 60     Entry time: Wed Dec 16 12:36:37 2020
 Author: Loïc Amoudry 
 Status: Fixed 
 Type: report 
 Category: lasers and optics 
 Location: Optical room 
 Title: Mirror's cleaning and microscope imaging 

On 10th of december 2020 we cleaned the SBOX mirrors and took microscope images (the name of the images indicates what they are).

There are 7 mirror, the initial M1 (spot in the center), M2 (spot on the edge), M3 and M4 which made the 200-400kW and the M2, M3 and M4 SPARE. The difference we make between M3 and M4 SPARE is the number on the box (11 or 13).

We used 3 different cleaning methods : 1st, one spin coater on HR, 2nd one, tissu wipe on AR (wipe with the optical tissu and isoprop) or 3rd one, mirror wiped on tissue (put isoprop on tissu and press AR face of the mirror doing "8" shape 3 times).

The second method is far les efficient as a cleaning method. The image "M3_M4_spare_11_after_cleaning_back.tif " shows the traces let by it and removed by the 3rd method on image "M3_M4_spare_11_after_cleaning_back_second_time_on_tissu.tif".

We can also notice that the spin coater let some trace on the HR face, round shaped, see Image "M3_M4_spare_13_after_cleaning_back.tif". We can propose to use the third method with Acetone on HR face before using spin coater to remove oil or organic particles.

It also lets a trace on the AR face, this is why we clean the AR face with the 2nd method after cleaning it with the spin coater.

 

Note : The position of the mirrors in the microscope is always the same here. Meaning mirrors are directed so that the arrow (which shows the HR face and is placed on the side of the mirror) is placed on the top of the images.

Attachment 1: M1_before_cleaning.tif  900 kB
Attachment 2: M1_after_cleaning.tif  900 kB
Attachment 3: M2_after_cleaning.tif  900 kB
Attachment 4: M3_after_cleaning.tif  900 kB
Attachment 5: M4_after_cleaning.tif  900 kB
Attachment 6: M2_spare_before_cleaning.tif  900 kB
Attachment 7: M2_spare_after_cleaning.tif  900 kB
Attachment 8: M2_spare_after_cleaning_back.tif  900 kB
Attachment 9: M3_M4_spare_11_before_cleaning.tif  900 kB
Attachment 10: M3_M4_spare_11_after_cleaning_back.tif  900 kB
Attachment 11: M3_M4_spare_11_after_cleaning_back_second_time_on_tissu.tif  900 kB
Attachment 12: M3_M4_spare_13_before_cleaning.tif  900 kB
Attachment 13: M3_M4_spare_13_after_cleaning.tif  900 kB
Attachment 14: M3_M4_spare_13_after_cleaning_back.tif  900 kB
ELOG V3.1.4-395e101