  273   Thu Nov 12 13:10:05 2026 Alice RenauxUnder Processreportlasers and opticsOptical roomInstallation of a new cavity: the ABOX!!On Tuesday evening, we stopped the pump
to avoid overheating.
The vacuum level was around 0.7 mbar.
 untitled.png 
  272   Tue Nov 10 17:44:40 2026 Alice RenauxUnder Processreportlasers and opticsOptical roomInstallation of a new cavity: the ABOX!!We changed M4 from C23018/12 to C23018/9.
The scattering losses of M4 go from 2.8-4ppm
to 6ppm. The new expected finesse is 41,501-42,454.
 RefCurve_2026-11-10_7_163813.pngRefCurve_2026-11-10_8_164036.png 
  271   Tue Nov 10 17:11:12 2026 Alice RenauxUnder Processreportlasers and opticsOptical roomInstallation of a new cavity: the ABOX!!We changed M3 from C23018/11 to C23018/10.
The scattering losses of M3 go from 3.8-4.5ppm
to 11ppm. The expected finesse is then 42,056-43,392.
 6x 
  270   Tue Nov 10 16:04:47 2026 Alice RenauxUnder Processreportlasers and opticsOptical roomInstallation of a new cavity: the ABOX!!This afternoon we changed M2 from C23018/1
to C23018/3. The characteristics remain the
same, apart from the scattering losses that
 RefCurve_2026-11-10_0_145752.png 
  269   Tue Nov 10 11:14:11 2026 Alice RenauxUnder Processreportlasers and opticsOptical roomInstallation of a new cavity: the ABOX!!This morning, I moved the D-shape far from
the beam.
The cavity was completely misaligned
 untitled.png 
  268   Mon Nov 9 17:18:31 2026 Alice RenauxUnder Processreportlasers and opticsOptical roomInstallation of a new cavity: the ABOX!!Second finesse measurement after M2 had
been changed:

- Linewidth : 1.125 s <->
 RefCurve_2026-11-09_2_161811.png 
  267   Mon Nov 9 17:00:25 2026 Alice RenauxUnder Processreportlasers and opticsOptical roomInstallation of a new cavity: the ABOX!!Note: We had cleaned each mirror with ultrapure
water right before installing them in the
vacuum chamber.
 RefCurve_2026-11-09_0_143449.pngRefCurve_2026-11-09_1_154254.png 
  266   Fri Nov 6 16:30:36 2026 Alice RenauxUnder Processreportlasers and opticsOptical roomInstallation of a new cavity: the ABOX!!We estimated the FSR and the finesse:

- FSR: 161.037MHz

- Linewidth: 0.770ms x 20kHz/s
 IMG_20261106_160514(1).jpg 
  265   Wed Nov 4 17:01:36 2026 Alice RenauxUnder Processreportlasers and opticsOptical roomInstallation of a new cavity: the ABOX!!ADD: We added the LaseLock to scan the
NKT laser wavelength and select the transverse
mode that resonates in the cavity before
 IMG_20261104_164243(1).jpg 
  264   Wed Nov 4 16:11:19 2026 Alice RenauxUnder Processreportlasers and opticsOptical roomInstallation of a new cavity: the ABOX!!We installed a 160MHz four-mirror OEC with
two planar mirrors and two spherical mirrors.
The radii of curvature of the spherical mirrrors
 Capture_d'écran_2026-11-04_160149.pngCapture_d'écran_2026-11-04_160210.png 
  263   Tue Sep 15 17:34:28 2026 Ronic ChicheFixedinfolasers and opticsOptical roomMenhir 160MHz optical spectrumI took 2 pictures of the Menhir spectrum
after fiber injection.

Both spectra are centered roughly
 Menhir_160MHz_1.PNGMenhir_160MHz_2.PNG 
  262   Wed Sep 9 17:03:56 2026 Ronic ChicheUnder Processinfomechanics | lasers and optics | cablingOptical roomNeolase amplifier installationHere is the procedure to start the amplifier
properly:

1) Start the chiller and wait for
  
  261   Mon Aug 31 16:28:31 2026 Ronic ChicheUnder Processinfolasers and opticsOptical roomMenhir oscillator phase noise measurementafter the previous
measurement, we installed similar dampers,
than the ones used belows the aluminium breadboard,
 Mehnir_PN_plots.png 
  260   Mon Aug 31 16:15:46 2026 Ronic ChicheUnder Processinfolasers and opticsOptical roomMenhir oscillator phase noise measurementcomparison of the Menhir 160MHz phase noise
with the CW reference.

- in blue, the oscillators are
 Mehnir_PN_plots.png 
  259   Mon Aug 31 15:14:04 2026 Ronic ChicheUnder Processinfolasers and opticsOptical roomMenhir oscillator phase noise measurementmeasurements made with Alice:

comparison between the CW OEwaves
oscillator phase noise measured last week
 CW_OEwaves_phase_noise_comparison.png 
  258   Thu Aug 27 11:13:07 2026 Ronic ChicheUnder Processinfolasers and opticsOptical roomMenhir oscillator phase noise measurementwith Alice, we installed the Menhir 160MHz
oscillator on a breadboad placed on top of
4 damped feet around the amplifier.
  
  257   Thu Aug 27 11:08:44 2026 Ronic ChicheFixedinfolasers and opticsOptical roomfiber patch cables attenuation measurementsattenuation with 1 mating sleeve :

green jacket fiber : -0.4 dB

blue jacket fiber N°1 : -0.5
  
  256   Wed Aug 26 16:12:13 2026 Ronic ChicheUnder Processinfomechanics | lasers and optics | cablingOptical roomNeolase amplifier installationthis morning, I tried to restart the controller
but all the temperatures values on the NeoCon
software were stuck to 0°C !
  
  255   Tue Aug 25 16:27:29 2026 Ronic ChicheUnder Processinfomechanics | lasers and optics | cablingOptical roomNeolase amplifier installationI installed 4 steel feets around the amplifier,
with rubber damping absorbers on top, to
put later the oscillator optical breadboard
  
  254   Tue Aug 25 12:09:30 2026 Ronic ChicheUnder Processinfomechanics | lasers and optics | cablingOptical roomNeolase amplifier installationI connected the power supplies, laser controller
and laser head together with all the cables...
with no scheme in the manual.
 Neolaser_amplifier_connection.pdf 