Message ID: 6     Entry time: Tue Oct 9 10:19:29 2018
 Author: Loïc Amoudry 
 Status: Fixed 
 Type: report 
 Category: lasers and optics 
 Location: Optical room 
 Title: Record power-up 

Measurement made on 03/10/18 (nothing has been done since there).

Stable power in the cavity of 225 kW.

3rd stage current Transmission (mW) Pin (W)
0 8 0.37
2   5.3
2.2 145 6.4
3   10.7
4 350 16.1
5   21.8
6   27.3
7   32
8   36.7
8.5 640 39.1

 