HOME SBOX THOMX MINICAV Utilities
SBOX orders SBOX installation SBOX commissioning SBOX control command
  Status of commissioning, report also here plots are reports., Page 13 of 13  Not logged in ELOG logo
ID Date Author Status Type Category Location Title Text Attachments
  4   Mon Oct 1 15:19:48 2018 Loïc AmoudryFixedreportlasers and opticsOptical roomPhase measurement with HASOwith just intensity, the coupling is 98%,
and with phase, x direction coupling is 95%,
y direction 97%, so the telescope is good.
  
  3   Mon Oct 1 14:27:35 2018 Loïc AmoudryFixedreportlasers and opticsOptical roomPhase measurement with HASO* Loic has to fix the number of files (3)
regarding the number of measurements (2)

* splitted Intensity and phase
 8x 
  2   Mon Oct 1 11:30:39 2018 Loïc AmoudryFixedreportlasers and opticsOptical roomPhase measurement with HASO2 measurement.

First one locked, in transmission
of M2 with 2nd stage 0A.Total 89 cm from
 180928_M2_0A.has1801001_input_0A.has180928_M2_trans_0A.txt 
  1   Wed Sep 26 18:12:44 2018 Loïc AmoudryFixedinfolasers and opticsOptical roomCavity polarization states (Koheras), Finesse of 2 polarization statesMeasurments of Finesse with the 2 polarization
states, let's call them H (higher) and
L (lower): 24500 for the H and 23500 for
 Finesse_higher.isfFinesse_lower.isfThe2polarizations_states_direct_trans.isfThe2polarizations_states_direct_trans.png 
ELOG V3.1.4-395e101