HOME
SBOX
THOMX
MINICAV
Utilities
SBOX orders
SBOX installation
SBOX commissioning
SBOX control command
Status of commissioning, report also here plots are reports., Page 13 of 13
Not logged in
Find
|
Login
|
Help
Full
| Summary |
Threaded
244 Entries
Goto page
Previous
1
,
2
,
3
...
11
,
12
, 13
All
ID
Date
Author
Status
Type
Category
Location
Title
Text
4
Mon Oct 1 15:19:48 2018
Loïc Amoudry
Fixed
report
lasers and optics
Optical room
Phase measurement with HASO
with just intensity, the coupling is 98%,
and with phase, x direction coupling is 95%,
y direction 97%, so the telescope is good.
3
Mon Oct 1 14:27:35 2018
Loïc Amoudry
Fixed
report
lasers and optics
Optical room
Phase measurement with HASO
* Loic has to fix the number of files (3)
regarding the number of measurements (2)
* splitted Intensity and phase
8x
2
Mon Oct 1 11:30:39 2018
Loïc Amoudry
Fixed
report
lasers and optics
Optical room
Phase measurement with HASO
2 measurement.
First one locked, in transmission
of M2 with 2nd stage 0A.Total 89 cm from
1
Wed Sep 26 18:12:44 2018
Loïc Amoudry
Fixed
info
lasers and optics
Optical room
Cavity polarization states (Koheras), Finesse of 2 polarization states
Measurments of Finesse with the 2 polarization
states, let's call them H (higher) and
L (lower): 24500 for the H and 23500 for
Goto page
Previous
1
,
2
,
3
...
11
,
12
, 13
All
ELOG V3.1.4-395e101