HOME SBOX THOMX MINICAV Utilities
SBOX orders SBOX installation SBOX commissioning SBOX control command
  Status of commissioning, report also here plots are reports.  Not logged in ELOG logo
Message ID: 11     Entry time: Wed Oct 31 11:27:49 2018
 Author: Loïc Amoudry 
 Status: Fixed 
 Type: report 
 Category: mechanics | lasers and optics 
 Location: Optical room 
 Title: Power measurement with D-shape 

Measurements of lot of points with D-shape mirrors well positionned.

Power not optimized to the best but almost. (@4A could have 350 mW).

I (A) Ptrans (mW)  Coupling (%)

0

8 62
1 18 67
1.3 43 72
1.6 76 72
1.9 112 72
2.2 145 72
2.5 177 72
2.8 217 72
3.1 253 72
3.4 281 72
3.7 300 72
4 323 71
4.3 249 71
4.6 379 68
4.9 402 68
5.2 417 67
5.5 435 67
5.8 441 65

 

ELOG V3.1.4-395e101