HOME SBOX THOMX MINICAV Utilities
SBOX orders SBOX installation SBOX commissioning SBOX control command
  Status of commissioning, report also here plots are reports.  Not logged in ELOG logo
Entry   CELIA amplifier installation, posted by Manar Amer at Optical room about lasers and optics | detectors and electronics | software 
    Reply   CELIA amplifier installation + chiller, posted by Manar Amer at Optical room about lasers and optics | detectors and electronics | software WhatsApp_Image_2022-07-22_at_4.26.24_PM.jpgWhatsApp_Image_2022-07-22_at_4.26.24_PM.jpgWhatsApp_Image_2022-07-22_at_5.02.24_PM.jpg
       Reply   CELIA amplifier installation + chiller, posted by Manar Amer at Optical room about lasers and optics | detectors and electronics | software 
          Reply   CELIA amplifier installation + chiller, posted by Manar Amer at Optical room about lasers and optics | detectors and electronics | software 
Message ID: 129     Entry time: Fri Aug 19 16:02:33 2022     In reply to: 120
 Author: Manar Amer 
 Status: Fixed 
 Type: report 
 Category: lasers and optics | detectors and electronics | software 
 Location: Optical room 
 Title: CELIA amplifier installation + chiller 

Closing series

Manar Amer wrote:

The software to control the CELIA amplifier is on the laptop that was placed in ThomX bunker.

I have placed it in the PLIC room next to the SBox table.

it is called 'Alphanov Control Software'

 

Manar Amer wrote:

Amplifier placed next to the pulsed laser on the table under the airflow

The output is in free space with height from the table of about 10 cm, note the injection height into the cavity is between 14 - 15 cm.

a power cable is placed but not plugged.

Connection to the computer is made using USB B on amplifier to USB A  (note need a longer cable, the available on is too short)

The cooling, to be connected to an outside chiller, will use the bottom one shown in the image attached.

The two water tubes, from chiller to amplifier,  has been marked. The size of the tubes from the amplifier fit inside the tubes from the chiller.

 

 

Manar Amer wrote:

The amplifier was installed on the optical table next to SBox table.

The CVBG that will be used for stretching before amplification needs cleaning (they are very fragile, 'ask victor for best method')

The software to drive the diodes of the amplifier we have is not the compatible one.

 

 

 