HOME SBOX THOMX MINICAV Utilities
SBOX orders SBOX installation SBOX commissioning SBOX control command
  Status of commissioning, report also here plots are reports.  Not logged in ELOG logo
Entry   Amplifier output Beam Profile, posted by Manar Amer at Optical room about lasers and optics 20220819_Setup.jpg
    Reply   Amplifier output Beam Profile, posted by Manar Amer at Optical room about lasers and optics 
Message ID: 135     Entry time: Mon Aug 22 18:39:13 2022     In reply to: 132
 Author: Manar Amer 
 Status: Fixed 
 Type: report 
 Category: lasers and optics 
 Location: Optical room 
 Title: Amplifier output Beam Profile 

Beam divergence after amplifier 4.46 mrad

 

Manar Amer wrote:

In preparation to measure the output beam profile from the amplifier at high power, I have placed two wedge mirrors just before the beam dump to be able to extract the beam.

One of the wedges was taken from ThomX bunker, also the HR and AR mirrors were taken to plic room in case we might need them

an updated setup is attached  

 

ELOG V3.1.4-395e101