HOME Prise de donnees MML Controle commande Simulations Notes Hardware Ligne X Laser Interaction Diagnostiques Synchronisation
Commissionning Commissionning Preparation Pannes ShiftCheck
  Notes concernant la preparation du Commissionning, all entries  Not logged in ThomX    logo
Entry   VK, IC, LS, ND; Summary of the ring commissioning meeting 
Entry   KD; Mise en place Ligne X gain_pico.pngfenetre_pico.png
    Reply   KD; RE: Mise en place Ligne X 
Entry   IC, VK, VM, LS, JH, SC, ND; Summary of the ring commissioning meeting 
Entry   IC, VK, VM, LS, JH, MB, ND; Summary of the ring commissioning meeting 
Entry   VK, IC, JH, VM, LS, MB, ND; Summary of the ring commissioning meeting 
Entry   IC, VK, LS, JH, ND; Summary of the ring commissioning meeting 
Entry   KD; mesures et shifts Linac 
Entry   ND; Réunion Physique ThomX 
Entry   IC, VK, VM, JH, ND; Summary of the ring commissioning meeting 
Entry   IC, VM, SC, JH, VC, ND; Summary of the ring commissioning meeting data_2023-03-10_15-39-12.pngtbt_x_relative_integer2.pngtune_simulation.pngtune.pngtbt_x_kicker.png
Entry   ND; Notes from ThomX Physics meeting 
    Reply   ND; RE: Notes from ThomX Physics meeting 
Entry   VM, VK, ND; Summary of the ring commissioning meeting 
Entry   ND; Verification variables pour l'anneau ring_vars_2023_02_09_12_15.png
Entry   VK,IC, SC, VM, ND; Summary of the ring commissioning meeting 
Entry   VK, VM, SC, ND, HG; Summary of the ring commissioning meeting 
Entry   IC, VK, VM, SC, ND; Summary of the ring commissioning meeting 20_injections.jpg
Entry   VK, IC, VM, JH, KD, ND; Summary of the ring commissioning meeting 
    Reply   ND; RE: Summary of the ring commissioning meeting 
Entry   CB/HG/SC/KD; Programme linac semaine 5 décembre 
Entry   VK, IC, VM, JH, ND; Summary of the ring commissioning meeting 
Entry   VK, IC, VI, JH, SC, ND; Summary of the ring commissioning meeting #5 
Entry   IC, VK, VI, VC, JH, HG, ND ; Ring objectives 
    Reply   IC, VK, VI, VC, JH, HG, ND ; RE: Ring objectives 
       Reply   IC, VK, VI, VC, JH, HG, ND ; RE: RE: Ring objectives 
          Reply   IC, VK, VI, VC, JH, HG, ND ; RE: RE: RE: Ring objectives 
Entry   VK, IC, VI, JH, ND; Summary of the ring commissioning meeting #4 
Entry   IC, VK, VI (ND); Summary of the ring commissioning meeting #3 
Entry   ND, IC; Steerers and BPM map for the ring BPM_ring.pngBPM_ring.pptx
Entry   IC, VK, AM, VC, ND; Beam requirements for the ring 
    Reply   ND; RE: Beam requirements for the ring 
Entry   VK, IC, AM, ND; Summary of the ring commissioning meeting #2 
Entry   IC, VK, VI, VC, JH, HG, ND; Summary of the ring commissioning meeting #1 
Entry   MO; démarrage 
Entry   MO HM; test RF modulateur longue durée (journée) Screenshot_from_2022-08-18_15-56-17.png
Entry   HM MO; redemarrage 17 aout 2022 
Entry   CB/SC; liste des actions à menées 
Entry   Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 17:07:19 2021; Tests IHM RF 
Entry   Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:59:30 2021; tests redpitaya 4 RDP.04_voie1.pngRDP.04_voie2.png
Entry   Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:57:33 2021; tests redpitaya 3 RDP.03_voie1.pngRDP.03_voie2.png
Entry   Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:56:07 2021; redpitaya 2 RDP.02_voie1.png
Entry   Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:45:48 2021;  RDP.01_voie1.pngRDP.01_voie2.png
Entry   Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:35:53 2021; Tests IHM RF  IHM_RF.png
Entry   Hayg; WC tests TANGO 
    Reply   Hayg; RE: WC tests TANGO Screenshot_from_2021-03-03_11-29-57.png
Entry   Entered by Nicolas Delerue from 193.55.29.171 on Thu Dec 10 14:42:53 2020; Clients 1, 4 et 5 non fonctionnels 
Entry   Hayg; RE:  
Entry   Entered by Hugues Monard from 134.158.195.145 on Wed Dec 9 14:26:20 2020; re-organisation PC-client en SdC 
Entry   Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 15:26:07 2020;  photodiode-Prc_Qs.pdf
Entry   Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 15:16:48 2020;  
Entry   Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 13:50:13 2020; signal photodiode 03-12-20 plot.pdf
Entry   Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 13:44:55 2020; signal photodiode laser photodiode-laser2.png
Entry   Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 10:57:47 2020; demarrage a blanc 3 dec 2020 
Entry   Entered by Hayg Guler from 134.158.195.145 on Tue Dec 1 14:34:08 2020;  
Entry   Entered by Sophie Chance from 134.158.195.143 on Thu Jul 16 09:50:21 2020; demarrage à blanc 
Entry   Entered by bruni from 134.158.195.142 on Wed Jul 8 14:32:48 2020; test moteur solénoide en charge 
Entry   Entered by bruni from 134.158.195.142 on Tue Jul 7 14:24:55 2020; test régulation températures canon/section screenshotIHM_RF.png
Entry   Entered by Hayg Guler from 134.158.195.145 on Tue Nov 19 11:16:25 2019;  
ELOG V3.1.4-395e101