HOME Prise de donnees MML Controle commande Simulations Notes Hardware Ligne X Laser Interaction Diagnostiques Synchronisation
Commissionning Commissionning Preparation Pannes ShiftCheck
  Notes concernant la preparation du Commissionning  Not logged in ThomX    logo
Entry   Hayg; WC tests TANGO 
    Reply   Hayg; RE: WC tests TANGO Screenshot_from_2021-03-03_11-29-57.png
Message ID: 15     Entry time: Wed Mar 3 11:30:46 2021     In reply to: 14
 Author: Hayg 
 Status: Under Process 
 Type: Info 
 Category: problemes 
 Important:
 Subject: RE: WC tests TANGO 
 Icon:  

 

Hayg wrote:
  1. CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.03_Ch0_chargeMean
  2. CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.01_Ch0_chargeMean
  3. CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.02_Ch0_chargeMean
  4. CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.02_Ch3_chargeMean
  5. CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.02_Ch4_chargeMean

 

Dans les variables MeanStd :

  • Charge 1 :
    • er_ca_rac.05-elr.01-wac.01_Ch0_chargeMean 
  • Charge 2 :
    • er_ca_rac.05-elr.01-wac.02_Ch0_chargeMean   
    • er_ca_rac.05-elr.01-wac.02_Ch3_chargeMean  
    • er_ca_rac.05-elr.01-wac.02_Ch4_chargeMean  
  • Charge 3 :
    • er_ca_rac.05-elr.01-wac.03_Ch0_chargeMean

 

 

Attachment 1: Screenshot_from_2021-03-03_11-29-57.png  89 kB  | Hide | Hide all
Screenshot_from_2021-03-03_11-29-57.png
ELOG V3.1.4-395e101