 Subject: Summary of the ring commissioning meeting 
 Icon:  

Main studies:

- Measure bucket width in phase on Thursday at 500.02MHz => no storage beyond 45kV

- Measure frequency with spectrum analyser => 500.39MHz

- Preliminary study of BPM polarity

Next studies:

- Study again BPM polarities

- Redo spectrum analyser/FFT measurements of orbits at injection

- Study magnetic elements in balistic mode

- Visually look at the ring to see possible issues and changes to make

- Continue to do beam physics at 500.40MHz especially dynamic aperture

- Try to localize where losses occur during operations

 

 