Message ID: 50     Entry time: Mon Mar 20 10:08:24 2023
 Author: IC, VK, VM, JH, ND 
 Status: New Solution 
 Type: Info 
 Category: resumes 
 Important:
 Subject: Summary of the ring commissioning meeting 
 Icon:  

- Went up to 100kV in the cavity once it was tuned.

- Achieved nice storage stable for 2500 turns and some beam for > 100ms

- Measured the tune: several peaks around 0.35[1] (near the expected value) and one peak not understood at 0.5

- We observed storage at different frequencies spaced by about 10kHz

- Shall we try to return close from the nominal frequency?

 

Current status wrt to X-ray search:

- First we need to be able to reach reproducable storage from day to day

- X-ray searches can be started parasitically when the beam is stored

- Better understanding of the beam will come through measurements (at least until the summer): precise measurements of optics, beam parameters will be possible only with repeatable operations. This is crucial to reach the target parameters of the ring.

 

Next steps:

- This week (Friday afternoon - if beam available): try to reproduce results from last Friday; store, study injection, dispersion

- Next week: Thursday continue work on reproducibility; Friday 31st: scan in frequency starting from nominal frequency at lower voltage.