HOME Prise de donnees MML Controle commande Simulations Notes Hardware Ligne X Laser Interaction Diagnostiques Synchronisation
Commissionning Commissionning Preparation Pannes ShiftCheck
  Notes concernant la preparation du Commissionning  Not logged in ThomX    logo
Entry   IC, VK, VI, VC, JH, HG, ND ; Ring objectives 
    Reply   IC, VK, VI, VC, JH, HG, ND ; RE: Ring objectives 
       Reply   IC, VK, VI, VC, JH, HG, ND ; RE: RE: Ring objectives 
          Reply   IC, VK, VI, VC, JH, HG, ND ; RE: RE: RE: Ring objectives 
Message ID: 30     Entry time: Mon Sep 26 10:21:20 2022     In reply to: 27     Reply to this: 34
 Author: IC, VK, VI, VC, JH, HG, ND  
 Status: New Solution 
 Type: Shift summary 
 Category: Prise de donnees 
 Important:
 Subject: RE: Ring objectives 
 Icon:  

(1),  (2), (4) and (5) from last week have been done other items in progress.

New to do list:

(0) Re-establish beam transport to ring

(1) Monitor incident power on RF Gun

(2) Check energy jitter in TL/BPM.02 and TL/SST.02

(3) Use TL optimised transport when available

(4) Compare single pass and TbT BPM signals

(5) Test Alexandre's feedback code.

(6) Scan correctors to increase current on RI-C1/BPM.01 and RI-C2/BPM.06

(7) Start align beam in quadrupoles
 

Quote:

This entry is to be updated as the work progresses.

1) Re-establish beam transport to ring

2) Scan in time the septum

see script git/panneaux/Synchro/scan_septum.py

3) Scan in voltage the septum

4) Adjust timing of kicker by looking at induced noise on ICTs

5) Scan in time the kicker

git/panneaux/Synchro/scan_kicker.py

6) Scan in voltage the kicker

7) Transport further in the ring by playing with correctors

Note: When possible Alexandre will test his feedback code.

 

ELOG V3.1.4-395e101