59
|
Mon Jun 26 09:57:52 2023 |
VK, IC, LS, ND | New Solution | Shift summary | resumes |
|
Summary of the ring commissioning meeting | | Discussion mécanique
- Tous les dipoles ont été
alignés par rapport à des surfaces |
|
|
58
|
Thu Jun 22 07:41:18 2023 |
KD | New Solution | Info | Prise de donnees |
|
RE: Mise en place Ligne X | | hier et ce matin la ligne a été
re-réglé.
La table optique a été |
|
|
57
|
Mon Jun 19 09:46:32 2023 |
IC, VK, VM, LS, JH, SC, ND | New Solution | Shift summary | resumes |
|
Summary of the ring commissioning meeting | | Report from last week:
- Attempted the strategy suggested
by Alex |
|
|
Draft
|
Mon Jun 12 09:51:00 2023 |
IC, VK, VM, LS, JH, MB, ND | New Solution | Info | Prise de donnees |
|
Summary of the ring commissioning meeting | | Comments:
* There are strong evidences that
part of the frequency problem comes from |
|
|
55
|
Fri Jun 9 19:57:14 2023 |
KD | New Solution | Info | Prise de donnees |
|
Mise en place Ligne X | | Aujourd'hui (09/06/2023), la Table1
de la ligne X est mise en position faisceau.
Je l'ai approximativement alignée |
 |
|
54
|
Tue May 30 10:12:30 2023 |
VK, IC, JH, VM, LS, MB, ND | New Solution | Info | analyse |
|
Summary of the ring commissioning meeting | | Main studies:
- Measure bucket width in phase
on Thursday at 500.02MHz => no storage |
|
|
53
|
Mon May 22 10:05:30 2023 |
IC, VK, LS, JH, ND | New Solution | Shift summary | analyse |
|
Summary of the ring commissioning meeting | | === Summary of last week:
- Frequency was reduced to 500.0202MHz
but the beam stayed only for 100s of turns |
|
|
52
|
Fri Mar 31 10:37:18 2023 |
KD | Under Process | Other | Prise de donnees |
|
mesures et shifts Linac | | Réunion 31/03
Prochaines mesures à faire
: |
|
|
51
|
Thu Mar 23 12:29:05 2023 |
ND | New Solution | Info | resumes |
|
Réunion Physique ThomX | | Transparents sur: https://indico.ijclab.in2p3.fr/event/9358/
Quelques notes de la réunion
de Physique de ThomX: |
|
|
50
|
Mon Mar 20 10:08:24 2023 |
IC, VK, VM, JH, ND | New Solution | Info | resumes |
|
Summary of the ring commissioning meeting | | - Went up to 100kV in the cavity once it
was tuned.
- Achieved nice storage stable |
|
|
49
|
Mon Mar 13 09:39:39 2023 |
IC, VM, SC, JH, VC, ND | New Solution | Shift summary | analyse |
|
Summary of the ring commissioning meeting | | Excitation (betatron oscillation) on the
beam observed by exciting it with the extraction
kicker => initial measures of the tune. |
    |
|
48
|
Fri Feb 24 10:34:58 2023 |
ND | New Solution | Info | Prise de donnees |
|
RE: Notes from ThomX Physics meeting | | Présent: VK, SC, KD, MJ, HG, ND
Présentation par Marie.
Cf indico https://indico.ijclab.in2p3.fr/event/9242/ |
|
|
47
|
Mon Feb 20 10:06:36 2023 |
VM, VK, ND | New Solution | Info | resumes |
|
Summary of the ring commissioning meeting | | This week: beam on Thursday.
So far we did not see any screenshot
of Ring variables check. |
|
|
46
|
Thu Feb 9 12:16:41 2023 |
ND | New Solution | Info | Prise de donnees |
|
Verification variables pour l'anneau | | L'IHM de verification des variables
pour l'anneau a ete mis a jour.
Il est accessible dans plateforme |
|
|
45
|
Tue Jan 24 10:14:20 2023 |
ND | New Solution | Info | Prise de donnees |
|
Notes from ThomX Physics meeting | | Present: IC, VK, VM, VC, SC, MEK, KD, MJ,
HG, ND, MO (sous réserve d'oublis)
Visio: CB |
|
|
44
|
Mon Jan 23 09:54:14 2023 |
VK,IC, SC, VM, ND | New Solution | Info | resumes |
|
Summary of the ring commissioning meeting | | No beam last week. No beam this week.
Machine recovery on 2/2 => Nicolas
may try to tune the machine with students. |
|
|
43
|
Mon Jan 16 09:38:16 2023 |
VK, VM, SC, ND, HG | New Solution | Info | resumes |
|
Summary of the ring commissioning meeting | | Summary of last week:
- On Thursday the beam energy was
very different from usual (magnets current |
|
|
42
|
Mon Jan 9 10:12:40 2023 |
IC, VK, VM, SC, ND | New Solution | Info | resumes |
|
Summary of the ring commissioning meeting | | Notes from last week:
Beam was very unstable
(probably energy instabilities), lot of time |
|
|
41
|
Tue Dec 6 00:15:55 2022 |
ND | New Solution | Info | analyse |
|
RE: Summary of the ring commissioning meeting | | Regarding the remote control of the RF
synthetizer: it can only be controlled via
GPIB and RS-232. |
|
|
40
|
Mon Dec 5 17:42:51 2022 |
CB/HG/SC/KD | Fixed | Info | resumes |
|
Programme linac semaine 5 décembre | | Lundi 5 décembre :
redémarrage technique
Pb refroidissement Pb |
|
|
39
|
Mon Dec 5 10:05:11 2022 |
VK, IC, VM, JH, KD, ND | New Solution | Info | analyse |
|
Summary of the ring commissioning meeting | | The ring orbit has been re-established
despite some difficulties after the shutdown.
The ring cavity has been started. |
|
|
38
|
Mon Nov 7 23:53:29 2022 |
VK, IC, VM, JH, ND | New Solution | Info | resumes |
|
Summary of the ring commissioning meeting | | Discussed recent orbit correction of
the expanded orbit.
Need
to make run with cavity detuning from |
|
|
37
|
Mon Oct 17 10:02:07 2022 |
VK, IC, VI, JH, SC, ND | Reference Solution | Info | resumes |
|
Summary of the ring commissioning meeting #5 | | See slides attached to the indico page
https://indico.ijclab.in2p3.fr/event/8885/
Pb with BPM => visual check |
|
|
36
|
Mon Oct 10 10:37:43 2022 |
IC, VK, VI, VC, JH, HG, ND | New Solution | Shift summary | Prise de donnees |
|
RE: RE: RE: Ring objectives | | To do list:
(0) Re-establish beam transport
to ring |
|
|
35
|
Mon Oct 10 10:04:49 2022 |
VK, IC, VI, JH, ND | Under Process | Shift summary | resumes |
|
Summary of the ring commissioning meeting #4 | | - 300 turns achieved.
- Probably more but limited by
libera cut-off frequency. |
|
|
34
|
Wed Oct 5 09:51:12 2022 |
IC, VK, VI, VC, JH, HG, ND | New Solution | Shift summary | Prise de donnees |
|
RE: RE: Ring objectives | | New to do list:
(0) Re-establish beam transport
to ring |
|
|
33
|
Mon Oct 3 17:29:53 2022 |
IC, VK, VI (ND) | New Solution | Info | resumes |
|
Summary of the ring commissioning meeting #3 | |
Shift summaries for the ring for last
week are at
https://elog.lal.in2p3.fr/THOMX/Commissionning/568
https://elog.lal.in2p3.fr/THOMX/Commissionning/570
|
|
|
32
|
Wed Sep 28 09:56:44 2022 |
ND, IC | Reference Solution | Info | docs |
|
Steerers and BPM map for the ring | | See attached files. |
 |
|
31
|
Tue Sep 27 17:45:54 2022 |
ND | Under Process | Info | docs |
|
RE: Beam requirements for the ring | | An IHM to check some of these parameters
has been created (git/panneaux/StatusInfoIHM_ring_vars.py)
and added to Plateforme_IHM... |
|
|
30
|
Mon Sep 26 10:21:20 2022 |
IC, VK, VI, VC, JH, HG, ND | New Solution | Shift summary | Prise de donnees |
|
RE: Ring objectives | | (1), (2), (4) and (5) from last week
have been done other items in progress.
New to do list: |
|
|
29
|
Mon Sep 26 09:39:15 2022 |
VK, IC, AM, ND | New Solution | Info | Prise de donnees |
|
Summary of the ring commissioning meeting #2 | | Slides are at https://indico.ijclab.in2p3.fr/event/8750/
- There is a difference in BPM
numbering in Tango and MML => we should |
|
|
28
|
Fri Sep 23 09:44:14 2022 |
IC, VK, AM, VC, ND | Under Process | Info | docs |
|
Beam requirements for the ring | | The following parameters are required for
ring operations:
- At least 50pC on TL/DG/ICT.01 |
|
|
27
|
Mon Sep 19 16:29:06 2022 |
IC, VK, VI, VC, JH, HG, ND | New Solution | Shift summary | Prise de donnees |
|
Ring objectives | | This entry is to be updated as the work
progresses.
1) Re-establish beam transport |
|
|
26
|
Mon Sep 19 15:56:28 2022 |
IC, VK, VI, VC, JH, HG, ND | New Solution | Info | Prise de donnees |
|
Summary of the ring commissioning meeting #1 | | Status slides presented by Iryna available
on indico at https://indico.ijclab.in2p3.fr/event/8749/
The beam parameters required for |
|
|
25
|
Fri Sep 2 08:51:46 2022 |
MO | | Shift summary | etc |
|
démarrage | | 8h35 mise sous tension: PSS, LB9000,
modulateur, chillers |
|
|
24
|
Wed Aug 17 11:42:41 2022 |
MO HM | Under Process | Info | Prise de donnees |
|
test RF modulateur longue durée (journée) | | but : test fonctionnement modulateur et
RF sur la journée
8h55 démarrage modulateur |
|
|
23
|
Wed Aug 17 09:48:31 2022 |
HM MO | Under Process | Info | Prise de donnees |
|
redemarrage 17 aout 2022 | | 9h30 redemarrage HM MO
- niveau 1 verifié (circuit
eau, air comprimé, etat modulateur |
|
|
22
|
Fri Mar 4 11:07:28 2022 |
CB/SC | | Problem | problemes |
|
liste des actions à menées | | |
|
|
21
|
Thu Mar 4 17:07:32 2021 |
Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 17:07:19 2021 | Under Process | Shift summary | Prise de donnees |
|
Tests IHM RF | | Les tests se sont bien déroulés,
on observe bien les signaux correspondants
au redpitayas demandés. |
|
|
20
|
Thu Mar 4 16:59:43 2021 |
Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:59:30 2021 | Under Process | Shift summary | Prise de donnees |
|
tests redpitaya 4 | | Tests des redpitaya 4 voie 1 (Photodiode)
et voie 2 (Q section) |
 |
|
19
|
Thu Mar 4 16:57:46 2021 |
Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:57:33 2021 | Under Process | Shift summary | Prise de donnees |
|
tests redpitaya 3 | | Tests des redpitayas 3 voie 1 (Pi canon)
et voie 2 (Pr canon) |
 |
|
18
|
Thu Mar 4 16:56:19 2021 |
Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:56:07 2021 | Under Process | Shift summary | Prise de donnees |
|
redpitaya 2 | | Tests du redpitaya 2 voie 1 (Boucle section)
voie 2 est libre |
|
|
17
|
Thu Mar 4 16:46:04 2021 |
Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:45:48 2021 | Under Process | Shift summary | Prise de donnees |
|
| | Test du repitaya 1 voie 1 (Pi section)
et 2 (Pr section)
|
 |
|
16
|
Thu Mar 4 16:36:12 2021 |
Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:35:53 2021 | Under Process | Shift summary | Prise de donnees |
|
Tests IHM RF | | De nouveaux tests ont été
fait sur l'IHM RF amélioré
(M. Omeich, H. Guler, S. Chance, JN. Cayla) |
|
|
15
|
Wed Mar 3 11:30:46 2021 |
Hayg | Under Process | Info | problemes |
|
RE: WC tests TANGO | |
|
|
|
14
|
Wed Mar 3 10:49:14 2021 |
Hayg | Under Process | Info | problemes |
|
WC tests TANGO | |
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.03_Ch0_chargeMean
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.01_Ch0_chargeMean
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.02_Ch0_chargeMean
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.02_Ch3_chargeMean
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.02_Ch4_chargeMean
Dans les variables MeanStd :
Charge 1 :
er_ca_rac.05-elr.01-wac.01_Ch0_chargeMean
Charge |
|
|
13
|
Thu Dec 10 14:43:07 2020 |
Entered by Nicolas Delerue from 193.55.29.171 on Thu Dec 10 14:42:53 2020 | Not Fixed | Problem | problemes |
|
Clients 1, 4 et 5 non fonctionnels | | En complément du message de Hayg,
client 4 et 5 ne fonctionnent pas non plus
(en plus de client 1). |
|
|
12
|
Wed Dec 9 14:33:08 2020 |
Hayg | Under Process | Info | etc |
|
RE: | | Pour info :
client 1 ne fonctionne
pas encore. Il n'a pas été |
|
|
11
|
Wed Dec 9 14:26:35 2020 |
Entered by Hugues Monard from 134.158.195.145 on Wed Dec 9 14:26:20 2020 | Fixed | Info | etc |
|
re-organisation PC-client en SdC | | suite à la discussion de lundi 7
/12/20, les PC clients en SdC ont été
déplacés et re-organisé |
|
|
10
|
Thu Dec 3 15:26:22 2020 |
Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 15:26:07 2020 | Fixed | Info | Prise de donnees |
|
| | signaux photodiode PrC Qs test avec generateur
impulsion ! 2 V , 3 µs (bleu ciel)
et signal avec rampe, 1V (moire), photodiode |
|
|
9
|
Thu Dec 3 15:17:04 2020 |
Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 15:16:48 2020 | Fixed | Info | Prise de donnees |
|
| | Signaux RF - REdPitaya 03-12-20
Photodiode laser - RP.04 A
QS RP.04 B |
|
|
8
|
Thu Dec 3 13:50:27 2020 |
Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 13:50:13 2020 | Fixed | Info | Prise de donnees |
|
signal photodiode 03-12-20 | | |
|
|
7
|
Thu Dec 3 13:45:13 2020 |
Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 13:44:55 2020 | Fixed | Info | docs |
|
signal photodiode laser | | |
|
|
6
|
Thu Dec 3 10:58:11 2020 |
Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 10:57:47 2020 | Fixed | Info | docs |
|
demarrage a blanc 3 dec 2020 | | Bilan démarrage à blanc 3
dec 2020 : (H Monard, S Cavalier)
but : verification etat IHM pour |
|
|
Draft
|
Tue Dec 1 14:35:01 2020 |
Entered by Hayg Guler from 134.158.195.145 on Tue Dec 1 14:34:08 2020 | | | |
|
| | Laser :
Camera : mettre le temps d'exposition
à 0.2 secondes |
|
|
4
|
Thu Jul 16 09:50:37 2020 |
Entered by Sophie Chance from 134.158.195.143 on Thu Jul 16 09:50:21 2020 | Under Process | Info | etc |
|
demarrage à blanc | | debut du démarrage à blanc
9h45. Démarrage prévu par étape. |
|
|
Draft
|
Wed Jul 8 14:33:04 2020 |
Entered by bruni from 134.158.195.142 on Wed Jul 8 14:32:48 2020 | Under Process | Shift summary | Prise de donnees |
|
test moteur solénoide en charge | | Prise de mesure relative entre les deux
bobines : 18.7cm avec les alimentations éteintes
mais du refroidissement. |
|
|
2
|
Tue Jul 7 14:25:15 2020 |
Entered by bruni from 134.158.195.142 on Tue Jul 7 14:24:55 2020 | Under Process | Shift summary | Prise de donnees |
|
test régulation températures canon/section | | Ouverture des chillers et du frigo sur
place.
Ouverture de l'IHM plateforme |
|
|
1
|
Tue Nov 19 11:16:39 2019 |
Entered by Hayg Guler from 134.158.195.145 on Tue Nov 19 11:16:25 2019 | Under Process | Shift summary | Prise de donnees |
|
| | Salle de controle :
installer Xlib pour tout
le monde
mettre les environnements |
|