  59   Mon Jun 26 09:57:52 2023 VK, IC, LS, NDNew SolutionShift summaryresumes Summary of the ring commissioning meeting Discussion mécanique

- Tous les dipoles ont été
alignés par rapport à des surfaces
  
  58   Thu Jun 22 07:41:18 2023 KDNew SolutionInfoPrise de donnees RE: Mise en place Ligne X hier et ce matin la ligne a été
re-réglé.

La table optique a été
  
  57   Mon Jun 19 09:46:32 2023 IC, VK, VM, LS, JH, SC, NDNew SolutionShift summaryresumes Summary of the ring commissioning meeting Report from last week:

- Attempted the strategy suggested
by Alex
  
  Draft   Mon Jun 12 09:51:00 2023 IC, VK, VM, LS, JH, MB, NDNew SolutionInfoPrise de donnees Summary of the ring commissioning meeting Comments:

* There are strong evidences that
part of the frequency problem comes from
  
  55   Fri Jun 9 19:57:14 2023 KDNew SolutionInfoPrise de donnees Mise en place Ligne X Aujourd'hui (09/06/2023), la Table1
de la ligne X est mise en position faisceau.
Je l'ai approximativement alignée
 gain_pico.pngfenetre_pico.png 
  54   Tue May 30 10:12:30 2023 VK, IC, JH, VM, LS, MB, NDNew SolutionInfoanalyse Summary of the ring commissioning meeting Main studies:

- Measure bucket width in phase
on Thursday at 500.02MHz => no storage
  
  53   Mon May 22 10:05:30 2023 IC, VK, LS, JH, NDNew SolutionShift summaryanalyse Summary of the ring commissioning meeting === Summary of last week:

- Frequency was reduced to 500.0202MHz
but the beam stayed only for 100s of turns
  
  52   Fri Mar 31 10:37:18 2023 KDUnder ProcessOtherPrise de donnees mesures et shifts Linac Réunion 31/03

Prochaines mesures à faire
:
  
  51   Thu Mar 23 12:29:05 2023 NDNew SolutionInforesumes Réunion Physique ThomX Transparents sur: https://indico.ijclab.in2p3.fr/event/9358/

Quelques notes de la réunion
de Physique de ThomX:
  
  50   Mon Mar 20 10:08:24 2023 IC, VK, VM, JH, NDNew SolutionInforesumes Summary of the ring commissioning meeting - Went up to 100kV in the cavity once it
was tuned.

- Achieved nice storage stable
  
  49   Mon Mar 13 09:39:39 2023 IC, VM, SC, JH, VC, NDNew SolutionShift summaryanalyse Summary of the ring commissioning meeting Excitation (betatron oscillation) on the
beam observed by exciting it with the extraction
kicker => initial measures of the tune.
 data_2023-03-10_15-39-12.pngtbt_x_relative_integer2.pngtune_simulation.pngtune.pngtbt_x_kicker.png 
  48   Fri Feb 24 10:34:58 2023 NDNew SolutionInfoPrise de donnees RE: Notes from ThomX Physics meeting Présent: VK, SC, KD, MJ, HG, ND

Présentation par Marie.
Cf indico https://indico.ijclab.in2p3.fr/event/9242/
  
  47   Mon Feb 20 10:06:36 2023 VM, VK, NDNew SolutionInforesumes Summary of the ring commissioning meeting This week: beam on Thursday.

So far we did not see any screenshot
of Ring variables check.
  
  46   Thu Feb 9 12:16:41 2023 NDNew SolutionInfoPrise de donnees Verification variables pour l'anneau L'IHM de verification des variables
pour l'anneau a ete mis a jour.

Il est accessible dans plateforme
 ring_vars_2023_02_09_12_15.png 
  45   Tue Jan 24 10:14:20 2023 NDNew SolutionInfoPrise de donnees Notes from ThomX Physics meeting Present: IC, VK, VM, VC, SC, MEK, KD, MJ,
HG, ND, MO (sous réserve d'oublis)

Visio: CB
  
  44   Mon Jan 23 09:54:14 2023 VK,IC, SC, VM, NDNew SolutionInforesumes Summary of the ring commissioning meeting No beam last week. No beam this week.

Machine recovery on 2/2 => Nicolas
may try to tune the machine with students.
  
  43   Mon Jan 16 09:38:16 2023 VK, VM, SC, ND, HGNew SolutionInforesumes Summary of the ring commissioning meeting Summary of last week:

- On Thursday the beam energy was
very different from usual (magnets current
  
  42   Mon Jan 9 10:12:40 2023 IC, VK, VM, SC, NDNew SolutionInforesumes Summary of the ring commissioning meeting Notes from last week:


Beam was very unstable
(probably energy instabilities), lot of time
 20_injections.jpg 
  41   Tue Dec 6 00:15:55 2022 NDNew SolutionInfoanalyse RE: Summary of the ring commissioning meeting Regarding the remote control of the RF
synthetizer: it can only be controlled via
GPIB and RS-232.
  
  40   Mon Dec 5 17:42:51 2022 CB/HG/SC/KDFixedInforesumes Programme linac semaine 5 décembre Lundi 5 décembre :
redémarrage technique

Pb refroidissement  Pb
  
  39   Mon Dec 5 10:05:11 2022 VK, IC, VM, JH, KD, NDNew SolutionInfoanalyse Summary of the ring commissioning meeting The ring orbit has been re-established
despite some difficulties after the shutdown.

The ring cavity has been started.
  
  38   Mon Nov 7 23:53:29 2022 VK, IC, VM, JH, NDNew SolutionInforesumes Summary of the ring commissioning meeting Discussed recent orbit correction of
the expanded orbit. 

Need
to make run with  cavity detuning from
  
  37   Mon Oct 17 10:02:07 2022 VK, IC, VI, JH, SC, NDReference SolutionInforesumes Summary of the ring commissioning meeting #5 See slides attached to the indico page
https://indico.ijclab.in2p3.fr/event/8885/

Pb with BPM => visual check
  
  36   Mon Oct 10 10:37:43 2022 IC, VK, VI, VC, JH, HG, ND New SolutionShift summaryPrise de donnees RE: RE: RE: Ring objectives To do list:

(0) Re-establish beam transport
to ring
  
  35   Mon Oct 10 10:04:49 2022 VK, IC, VI, JH, NDUnder ProcessShift summaryresumes Summary of the ring commissioning meeting #4 - 300 turns achieved.

- Probably more but limited by
libera cut-off frequency.
  
  34   Wed Oct 5 09:51:12 2022 IC, VK, VI, VC, JH, HG, ND New SolutionShift summaryPrise de donnees RE: RE: Ring objectives New to do list:

(0) Re-establish beam transport
to ring
  
  33   Mon Oct 3 17:29:53 2022 IC, VK, VI (ND)New SolutionInforesumes Summary of the ring commissioning meeting #3 
Shift summaries for the ring for last
week are at

https://elog.lal.in2p3.fr/THOMX/Commissionning/568

https://elog.lal.in2p3.fr/THOMX/Commissionning/570

  
  32   Wed Sep 28 09:56:44 2022 ND, ICReference SolutionInfodocs Steerers and BPM map for the ring See attached files.  BPM_ring.pngBPM_ring.pptx 
  31   Tue Sep 27 17:45:54 2022 NDUnder ProcessInfodocs RE: Beam requirements for the ring An IHM to check some of these parameters
has been created (git/panneaux/StatusInfoIHM_ring_vars.py)
and added to Plateforme_IHM...
  
  30   Mon Sep 26 10:21:20 2022 IC, VK, VI, VC, JH, HG, ND New SolutionShift summaryPrise de donnees RE: Ring objectives (1),  (2), (4) and (5) from last week
have been done other items in progress.

New to do list:
  
  29   Mon Sep 26 09:39:15 2022 VK, IC, AM, NDNew SolutionInfoPrise de donnees Summary of the ring commissioning meeting #2 Slides are at https://indico.ijclab.in2p3.fr/event/8750/

- There is a difference in BPM
numbering in Tango and MML => we should
  
  28   Fri Sep 23 09:44:14 2022 IC, VK, AM, VC, NDUnder ProcessInfodocs Beam requirements for the ring The following parameters are required for
ring operations:

- At least 50pC on TL/DG/ICT.01
  
  27   Mon Sep 19 16:29:06 2022 IC, VK, VI, VC, JH, HG, ND New SolutionShift summaryPrise de donnees Ring objectives This entry is to be updated as the work
progresses.

1) Re-establish beam transport
  
  26   Mon Sep 19 15:56:28 2022 IC, VK, VI, VC, JH, HG, NDNew SolutionInfoPrise de donnees Summary of the ring commissioning meeting #1 Status slides presented by Iryna available
on indico at https://indico.ijclab.in2p3.fr/event/8749/

The beam parameters required for
  
  25   Fri Sep 2 08:51:46 2022 MO Shift summaryetc démarrage 8h35  mise sous tension: PSS, LB9000,
modulateur, chillers
  
  24   Wed Aug 17 11:42:41 2022 MO HMUnder ProcessInfoPrise de donnees test RF modulateur longue durée (journée) but : test fonctionnement modulateur et
RF sur la journée

8h55 démarrage modulateur
 Screenshot_from_2022-08-18_15-56-17.png 
  23   Wed Aug 17 09:48:31 2022 HM MOUnder ProcessInfoPrise de donnees redemarrage 17 aout 2022 9h30 redemarrage HM MO

- niveau 1 verifié (circuit
eau, air comprimé, etat modulateur
  
  22   Fri Mar 4 11:07:28 2022 CB/SC Problemproblemes liste des actions à menées     
  21   Thu Mar 4 17:07:32 2021 Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 17:07:19 2021Under ProcessShift summaryPrise de donnees Tests IHM RF Les tests se sont bien déroulés,
on observe bien les signaux correspondants
au redpitayas demandés.
  
  20   Thu Mar 4 16:59:43 2021 Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:59:30 2021Under ProcessShift summaryPrise de donnees tests redpitaya 4 Tests des redpitaya 4 voie 1 (Photodiode)
et voie 2 (Q section)
 RDP.04_voie1.pngRDP.04_voie2.png 
  19   Thu Mar 4 16:57:46 2021 Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:57:33 2021Under ProcessShift summaryPrise de donnees tests redpitaya 3 Tests des redpitayas 3 voie 1 (Pi canon)
et voie 2 (Pr canon)
 RDP.03_voie1.pngRDP.03_voie2.png 
  18   Thu Mar 4 16:56:19 2021 Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:56:07 2021Under ProcessShift summaryPrise de donnees redpitaya 2 Tests du redpitaya 2 voie 1 (Boucle section)
voie 2 est libre
 RDP.02_voie1.png 
  17   Thu Mar 4 16:46:04 2021 Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:45:48 2021Under ProcessShift summaryPrise de donnees   Test du repitaya 1 voie 1 (Pi section)
et 2 (Pr section)

 
 RDP.01_voie1.pngRDP.01_voie2.png 
  16   Thu Mar 4 16:36:12 2021 Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:35:53 2021Under ProcessShift summaryPrise de donnees Tests IHM RF  De nouveaux tests ont été
fait sur l'IHM RF amélioré
(M. Omeich, H. Guler, S. Chance, JN. Cayla)
 IHM_RF.png 
  15   Wed Mar 3 11:30:46 2021 HaygUnder ProcessInfoproblemes RE: WC tests TANGO  




 Screenshot_from_2021-03-03_11-29-57.png 
  14   Wed Mar 3 10:49:14 2021 HaygUnder ProcessInfoproblemes WC tests TANGO 
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.03_Ch0_chargeMean
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.01_Ch0_chargeMean
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.02_Ch0_chargeMean
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.02_Ch3_chargeMean
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.02_Ch4_chargeMean


 

Dans les variables MeanStd :


Charge 1 :

er_ca_rac.05-elr.01-wac.01_Ch0_chargeMean 


Charge
  
  13   Thu Dec 10 14:43:07 2020 Entered by Nicolas Delerue from 193.55.29.171 on Thu Dec 10 14:42:53 2020Not FixedProblemproblemes Clients 1, 4 et 5 non fonctionnels En complément du message de Hayg,
client 4 et 5 ne fonctionnent pas non plus
(en plus de client 1).
  
  12   Wed Dec 9 14:33:08 2020 HaygUnder ProcessInfoetc RE:  Pour info :


client 1 ne fonctionne
pas encore. Il n'a pas été
  
  11   Wed Dec 9 14:26:35 2020 Entered by Hugues Monard from 134.158.195.145 on Wed Dec 9 14:26:20 2020FixedInfoetc re-organisation PC-client en SdC suite à la discussion de lundi 7
/12/20, les PC clients en SdC ont été
déplacés et re-organisé
  
  10   Thu Dec 3 15:26:22 2020 Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 15:26:07 2020FixedInfoPrise de donnees   signaux photodiode PrC Qs test avec generateur
impulsion ! 2 V , 3 µs (bleu ciel) 
et signal avec rampe, 1V (moire), photodiode
 photodiode-Prc_Qs.pdf 
  9   Thu Dec 3 15:17:04 2020 Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 15:16:48 2020FixedInfoPrise de donnees   Signaux RF - REdPitaya 03-12-20

Photodiode laser - RP.04 A

QS RP.04 B
  
  8   Thu Dec 3 13:50:27 2020 Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 13:50:13 2020FixedInfoPrise de donnees signal photodiode 03-12-20    plot.pdf 
  7   Thu Dec 3 13:45:13 2020 Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 13:44:55 2020FixedInfodocs signal photodiode laser    photodiode-laser2.png 
  6   Thu Dec 3 10:58:11 2020 Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 10:57:47 2020FixedInfodocs demarrage a blanc 3 dec 2020 Bilan démarrage à blanc 3
dec 2020 : (H Monard, S Cavalier)

but : verification etat IHM pour
  
  Draft   Tue Dec 1 14:35:01 2020 Entered by Hayg Guler from 134.158.195.145 on Tue Dec 1 14:34:08 2020      Laser :

Camera : mettre le temps d'exposition
à 0.2 secondes
  
  4   Thu Jul 16 09:50:37 2020 Entered by Sophie Chance from 134.158.195.143 on Thu Jul 16 09:50:21 2020Under ProcessInfoetc demarrage à blanc debut du démarrage à blanc
9h45. Démarrage prévu par étape.
  
  Draft   Wed Jul 8 14:33:04 2020 Entered by bruni from 134.158.195.142 on Wed Jul 8 14:32:48 2020Under ProcessShift summaryPrise de donnees test moteur solénoide en charge Prise de mesure relative entre les deux
bobines : 18.7cm avec les alimentations éteintes
mais du refroidissement.
  
  2   Tue Jul 7 14:25:15 2020 Entered by bruni from 134.158.195.142 on Tue Jul 7 14:24:55 2020Under ProcessShift summaryPrise de donnees test régulation températures canon/section Ouverture des chillers et du frigo sur
place.

Ouverture de l'IHM plateforme
 screenshotIHM_RF.png 
  1   Tue Nov 19 11:16:39 2019 Entered by Hayg Guler from 134.158.195.145 on Tue Nov 19 11:16:25 2019Under ProcessShift summaryPrise de donnees   Salle de controle :


installer Xlib pour tout
le monde
mettre les environnements
  
ELOG V3.1.4-395e101