Notes from last week:

  • Beam was very unstable (probably energy instabilities), lot of time was spent tuning the injector.
  • Beam instabilities prevented us from having a good storage.
  • Unable to start the extraction line dipole.

Comments:

  • It seems too early to plan radioprotection checks as:
    • we have not yet been able to store the beam and then extract it in a working extraction line.
    • beam is too unstable.
  • Beam instabilities prevent progress on the ring studies.
  • Beam stability characterisation of the upstream parts of the accelerator are necessary.

 