HOME Prise de donnees MML Controle commande Simulations Notes Hardware Ligne X Laser Interaction Diagnostiques Synchronisation
Commissionning Commissionning Preparation Pannes ShiftCheck
  Notes concernant la preparation du Commissionning, Page 2 of 3  Not logged in ThomX    logo
Entry   IC, VK, VI, VC, JH, HG, ND ; Ring objectives 
    Reply   IC, VK, VI, VC, JH, HG, ND ; RE: Ring objectives 
       Reply   IC, VK, VI, VC, JH, HG, ND ; RE: RE: Ring objectives 
          Reply   IC, VK, VI, VC, JH, HG, ND ; RE: RE: RE: Ring objectives 
Entry   VK, IC, VI, JH, ND; Summary of the ring commissioning meeting #4 
Entry   IC, VK, VI (ND); Summary of the ring commissioning meeting #3 
Entry   ND, IC; Steerers and BPM map for the ring BPM_ring.pngBPM_ring.pptx
Entry   IC, VK, AM, VC, ND; Beam requirements for the ring 
    Reply   ND; RE: Beam requirements for the ring 
Entry   VK, IC, AM, ND; Summary of the ring commissioning meeting #2 
Entry   IC, VK, VI, VC, JH, HG, ND; Summary of the ring commissioning meeting #1 
Entry   MO; démarrage 
Entry   MO HM; test RF modulateur longue durée (journée) Screenshot_from_2022-08-18_15-56-17.png
Entry   HM MO; redemarrage 17 aout 2022 
Entry   CB/SC; liste des actions à menées 
Entry   Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 17:07:19 2021; Tests IHM RF 
Entry   Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:59:30 2021; tests redpitaya 4 RDP.04_voie1.pngRDP.04_voie2.png
Entry   Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:57:33 2021; tests redpitaya 3 RDP.03_voie1.pngRDP.03_voie2.png
Entry   Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:56:07 2021; redpitaya 2 RDP.02_voie1.png
Entry   Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:45:48 2021;  RDP.01_voie1.pngRDP.01_voie2.png
Entry   Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:35:53 2021; Tests IHM RF  IHM_RF.png
Entry   Hayg; WC tests TANGO 
    Reply   Hayg; RE: WC tests TANGO Screenshot_from_2021-03-03_11-29-57.png
Entry   Entered by Nicolas Delerue from 193.55.29.171 on Thu Dec 10 14:42:53 2020; Clients 1, 4 et 5 non fonctionnels 
Entry   Hayg; RE:  
ELOG V3.1.4-395e101