Entry   VK, IC, VM, JH, KD, ND; Summary of the ring commissioning meeting 
    Reply   ND; RE: Summary of the ring commissioning meeting 
Message ID: 41     Entry time: Tue Dec 6 00:15:55 2022     In reply to: 39
 Author: ND 
 Status: New Solution 
 Type: Info 
 Category: analyse 
 Important:
 Subject: RE: Summary of the ring commissioning meeting 
 Icon:  

Regarding the remote control of the RF synthetizer: it can only be controlled via GPIB and RS-232.

=> Phase shift will be done from the synchro synthetiser

=> Power control can be done with a variable attenuator controlled by the synchro synthetiser or a delay generator.

 

 

Quote:

The ring orbit has been re-established despite some difficulties after the shutdown.

The ring cavity has been started. Whatever the phase it kills the beam.
Two hypothesis:

1) It can be a frequency problem

2) It can be a transverse kick given by the cavity

About 1:

- Magnet current and frequency have been scanned but no effect.

About 2:

- We see betatron oscillation.

We see the beam lost by steps, not a continuous decrease.

https://elog.lal.in2p3.fr/THOMX/Commissionning/221202_190728/Screenshot_from_2022-12-02_18-02-36.png shows betatron oscillation with cavity tuned.

Next steps:

- Mesure FFT of BPM signal (VM, VC)

- "Open the ring" (kick the beam out of the ring) and study the effect of the cavity (phase, power) on the BPMs. (VK, IC)

- Scan betatron oscillation vs phase, orbit, power and frequency

- Slava: To catch the beam you should think like a beam.

Actions:

- Try to get remote control of RF synthetizer (ND)

 

 

 