Hayg; WC tests TANGO
|
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.03_Ch0_chargeMean
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.01_Ch0_chargeMean
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.02_Ch0_chargeMean
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.02_Ch3_chargeMean
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.02_Ch4_chargeMean
Dans les variables MeanStd :
Charge 1 :
er_ca_rac.05-elr.01-wac.01_Ch0_chargeMean
Charge 2 :
er_ca_rac.05-elr.01-wac.02_Ch0_chargeMean
er_ca_rac.05-elr.01-wac.02_Ch3_chargeMean
er_ca_rac.05-elr.01-wac.02_Ch4_chargeMean
Charge |
Hayg; RE: WC tests TANGO
|
Hayg
wrote:
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.03_Ch0_chargeMean
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.01_Ch0_chargeMean
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.02_Ch0_chargeMean
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.02_Ch3_chargeMean
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.02_Ch4_chargeMean
|
IC, VK, AM, VC, ND; Beam requirements for the ring
|
The following parameters are required for ring operations:
- At least 50pC on TL/DG/ICT.01 with std <20pC
- At least 20pC on TL/DG/ICT.02 with std <20pC |
ND; RE: Beam requirements for the ring
|
An IHM to check some of these parameters has been created (git/panneaux/StatusInfoIHM_ring_vars.py) and added to Plateforme_IHM...
Quote:
The following parameters are required for ring operations: |
Entered by Hayg Guler from 134.158.195.145 on Tue Nov 19 11:16:25 2019;
|
Salle de controle :
installer Xlib pour tout le monde
mettre les environnements en place
IHM vide :
couleurs ??
Chiller : |
Entered by bruni from 134.158.195.142 on Tue Jul 7 14:24:55 2020; test régulation températures canon/section
|
Ouverture des chillers et du frigo sur place.
Ouverture de l'IHM plateforme
Mise frigo ON et les chillersV |
Entered by bruni from 134.158.195.142 on Wed Jul 8 14:32:48 2020; test moteur solénoide en charge
|
Prise de mesure relative entre les deux bobines : 18.7cm avec les alimentations éteintes mais du refroidissement.
Mise en route des alimentations 80A sur la contre champ, et 275 sur la focalisante.
Prise de mesure à nouveau : 18.7cm --> ca n'a pas bougé |
Entered by Sophie Chance from 134.158.195.143 on Thu Jul 16 09:50:21 2020; demarrage à blanc
|
| debut du démarrage à blanc 9h45. Démarrage prévu par étape. |
Entered by Hayg Guler from 134.158.195.145 on Tue Dec 1 14:34:08 2020;
|
Laser :
Camera : mettre le temps d'exposition à 0.2 secondes |
Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 10:57:47 2020; demarrage a blanc 3 dec 2020
|
Bilan démarrage à blanc 3 dec 2020 : (H Monard, S Cavalier)
but : verification etat IHM pour conditionnement RF avec H Monard + JN Cayla
Sur compte H Monard : sur Client2 plateforme IHM ne se lance pas |
Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 13:44:55 2020; signal photodiode laser
|
| |
Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 13:50:13 2020; signal photodiode 03-12-20
|
| |
Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 15:16:48 2020;
|
Signaux RF - REdPitaya 03-12-20
Photodiode laser - RP.04 A
QS RP.04 B |
Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 15:26:07 2020;
|
| signaux photodiode PrC Qs test avec generateur impulsion ! 2 V , 3 µs (bleu ciel) et signal avec rampe, 1V (moire), photodiode (rose) |
Entered by Hugues Monard from 134.158.195.145 on Wed Dec 9 14:26:20 2020; re-organisation PC-client en SdC
|
suite à la discussion de lundi 7 /12/20, les PC clients en SdC ont été déplacés et re-organisé avec les numeros
client1 ,2 , 3 ,4 ,5 dans le sens horaire en salle de controle, en commencant par la gauche en entrant
+----------------------------------------------------------------+ |
Hayg; RE:
|
Pour info :
client 1 ne fonctionne pas encore. Il n'a pas été utilisé depuis longtemps, Guillaume a été prévenu
pour y jeter un oeil.
Client 3 et 5 sont maintenant aux places qui n'ont qu'un seul écran. Une MAJ de la salle devra être |
Entered by Nicolas Delerue from 193.55.29.171 on Thu Dec 10 14:42:53 2020; Clients 1, 4 et 5 non fonctionnels
|
En complément du message de Hayg, client 4 et 5 ne fonctionnent pas non plus (en plus de client 1).
Nicolas |
Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:35:53 2021; Tests IHM RF
|
De nouveaux tests ont été fait sur l'IHM RF amélioré (M. Omeich, H. Guler, S. Chance, JN. Cayla)
Tous les redpitayas ont été testés via un générateur de retard. |
Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:45:48 2021; 
|
Test du repitaya 1 voie 1 (Pi section) et 2 (Pr section)
|
Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:56:07 2021; redpitaya 2
|
| Tests du redpitaya 2 voie 1 (Boucle section) voie 2 est libre |
Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:57:33 2021; tests redpitaya 3 
|
| Tests des redpitayas 3 voie 1 (Pi canon) et voie 2 (Pr canon) |
Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:59:30 2021; tests redpitaya 4 
|
| Tests des redpitaya 4 voie 1 (Photodiode) et voie 2 (Q section) |
Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 17:07:19 2021; Tests IHM RF
|
Les tests se sont bien déroulés, on observe bien les signaux correspondants au redpitayas demandés.
Il faudra faire une modification sur l'IHM car tango bloque par moment et cela "freeze" l'IHM que l'on doit complètement
redémarrer. |
CB/SC; liste des actions à menées
|
| |
HM MO; redemarrage 17 aout 2022
|
9h30 redemarrage HM MO
- niveau 1 verifié (circuit eau, air comprimé, etat modulateur et SF6)
- ronde modulateur faite |
MO HM; test RF modulateur longue durée (journée)
|
but : test fonctionnement modulateur et RF sur la journée
8h55 démarrage modulateur et refroidissement
10h00 démarrage RF ( HV=1090V ) |
MO; démarrage
|
| 8h35 mise sous tension: PSS, LB9000, modulateur, chillers |
IC, VK, VI, VC, JH, HG, ND; Summary of the ring commissioning meeting #1
|
Status slides presented by Iryna available on indico at https://indico.ijclab.in2p3.fr/event/8749/
The beam parameters required for a good injection in the ring were discussed.
The following required parameters were identified: |
IC, VK, VI, VC, JH, HG, ND ; Ring objectives
|
This entry is to be updated as the work progresses.
1) Re-establish beam transport to ring
2) Scan in time the septum |
VK, IC, AM, ND; Summary of the ring commissioning meeting #2
|
Slides are at https://indico.ijclab.in2p3.fr/event/8750/
- There is a difference in BPM numbering in Tango and MML => we should stick to Tango names.
- Beam was very unstable during the past week |
IC, VK, VI, VC, JH, HG, ND ; RE: Ring objectives
|
(1), (2), (4) and (5) from last week have been done other items in progress.
New to do list:
(0) Re-establish beam transport to ring |
ND, IC; Steerers and BPM map for the ring 
|
| See attached files. |
IC, VK, VI (ND); Summary of the ring commissioning meeting #3
|
Shift summaries for the ring for last week are at
https://elog.lal.in2p3.fr/THOMX/Commissionning/568
https://elog.lal.in2p3.fr/THOMX/Commissionning/570
https://elog.lal.in2p3.fr/THOMX/Commissionning/571
The
problem with the pulse jumpis with 12ns delays has been identified and fixed (it was related to the synchronisation system).
The main issue identified |
IC, VK, VI, VC, JH, HG, ND ; RE: RE: Ring objectives
|
New to do list:
(0) Re-establish beam transport to ring
(0bis) Check energy jitter in TL/BPM.02 and TL/SST.02 |
VK, IC, VI, JH, ND; Summary of the ring commissioning meeting #4
|
- 300 turns achieved.
- Probably more but limited by libera cut-off frequency.
- Need to measure the injection axis |
IC, VK, VI, VC, JH, HG, ND ; RE: RE: RE: Ring objectives
|
To do list:
(0) Re-establish beam transport to ring
(0bis) Check energy jitter in TL/BPM.02 and TL/SST.02 |
VK, IC, VI, JH, SC, ND; Summary of the ring commissioning meeting #5
|
See slides attached to the indico page https://indico.ijclab.in2p3.fr/event/8885/
Pb with BPM => visual check of electrodes + hardware swap
Pb with steerer => Need to identify who will do the intervention and when |
VK, IC, VM, JH, ND; Summary of the ring commissioning meeting
|
Discussed recent orbit correction of the expanded orbit.
Need to make run with cavity detuning from its resonant conditions
used in the conditioning.
Discussed measurement of tune, and possible origins of inconsistant/noisy measurements.
Either BPMs signal processing or weak excitation. Beam size?
Need to do measurements with scope, to see if we can interpret TbT |
VK, IC, VM, JH, KD, ND; Summary of the ring commissioning meeting
|
The ring orbit has been re-established despite some difficulties after the shutdown.
The ring cavity has been started. Whatever the phase it kills the beam.
Two hypothesis: |
CB/HG/SC/KD; Programme linac semaine 5 décembre
|
Lundi 5 décembre : redémarrage technique
Pb refroidissement Pb réglé le mercredi matin concomitance (anneau/linac), sensible à la pression qui est dans
le réseau primaire, à surveiller |
ND; RE: Summary of the ring commissioning meeting
|
Regarding the remote control of the RF synthetizer: it can only be controlled via GPIB and RS-232.
=> Phase shift will be done from the synchro synthetiser
=> Power control can be done with a variable attenuator controlled by the synchro synthetiser or a delay generator. |
IC, VK, VM, SC, ND; Summary of the ring commissioning meeting
|
Notes from last week:
Beam was very unstable (probably energy instabilities), lot of time was spent tuning the injector.
Beam instabilities prevented
us from having a good storage.
Unable to start the extraction line dipole.
Comments: |
VK, VM, SC, ND, HG; Summary of the ring commissioning meeting
|
Summary of last week:
- On Thursday the beam energy was very different from usual (magnets current higher 172A for TL; 176A for RI) => made it impossible to re-use
previous settings for the ring and to find new settings. |
VK,IC, SC, VM, ND; Summary of the ring commissioning meeting
|
No beam last week. No beam this week.
Machine recovery on 2/2 => Nicolas may try to tune the machine with students.
Data taking on 9/2 for diags and machine characterization. |
ND; Notes from ThomX Physics meeting
|
Present: IC, VK, VM, VC, SC, MEK, KD, MJ, HG, ND, MO (sous réserve d'oublis)
Visio: CB
L'ordre du jour et les transparents présentés en réunion sont sur: https://indico.ijclab.in2p3.fr/event/9205/ |
ND; Verification variables pour l'anneau
|
L'IHM de verification des variables pour l'anneau a ete mis a jour.
Il est accessible dans plateforme IHM section "Outils", éeme collone, "eme ligne: "Check vars for RING".
Utilisation de l 'IHM (voir copie d'ecran ci-joint): |
VM, VK, ND; Summary of the ring commissioning meeting
|
This week: beam on Thursday.
So far we did not see any screenshot of Ring variables check.
Looking at last week's data, shot to shot charge instability seems to be > 15% |
ND; RE: Notes from ThomX Physics meeting
|
Présent: VK, SC, KD, MJ, HG, ND
Présentation par Marie. Cf indico https://indico.ijclab.in2p3.fr/event/9242/
Demo par Slava. |
IC, VM, SC, JH, VC, ND; Summary of the ring commissioning meeting    
|
Excitation (betatron oscillation) on the beam observed by exciting it with the extraction kicker => initial measures of the tune.
Tune measured close from expected value.
Reason for oscillation damping is not understood. |
IC, VK, VM, JH, ND; Summary of the ring commissioning meeting
|
- Went up to 100kV in the cavity once it was tuned.
- Achieved nice storage stable for 2500 turns and some beam for > 100ms
- Measured the tune: several peaks around 0.35[1] (near the expected value) and one peak not understood at 0.5 |
ND; Réunion Physique ThomX
|
Transparents sur: https://indico.ijclab.in2p3.fr/event/9358/
Quelques notes de la réunion de Physique de ThomX:
- Présentation de Marie sur les mesures dans le linac |
KD; mesures et shifts Linac
|
Réunion 31/03
Prochaines mesures à faire :
Canon : |
IC, VK, LS, JH, ND; Summary of the ring commissioning meeting
|
=== Summary of last week:
- Frequency was reduced to 500.0202MHz but the beam stayed only for 100s of turns
- Good storage was achieved at 500.40MHz: |
VK, IC, JH, VM, LS, MB, ND; Summary of the ring commissioning meeting
|
Main studies:
- Measure bucket width in phase on Thursday at 500.02MHz => no storage beyond 45kV
- Measure frequency with spectrum analyser => 500.39MHz |
KD; Mise en place Ligne X 
|
Aujourd'hui (09/06/2023), la Table1 de la ligne X est mise en position faisceau. Je l'ai approximativement alignée dans le faisceau.
Le cablage du pico1 (XLI/OP/TMD.01) est le suivant :
- ch1: diode écran fluo (XLI/OP/TMD.01/I1) |
IC, VK, VM, LS, JH, MB, ND; Summary of the ring commissioning meeting
|
Comments:
* There are strong evidences that part of the frequency problem comes from mechanical issue
* Fring field of the dipoles seems to be longer than anticipated. This could lead to shortening of the orbit. |
IC, VK, VM, LS, JH, SC, ND; Summary of the ring commissioning meeting
|
Report from last week:
- Attempted the strategy suggested by Alex
- Comparison of orbit with RF ON and RF OFF helped understand the "natural" frequency of the ring: 500.33MHz |
KD; RE: Mise en place Ligne X
|
hier et ce matin la ligne a été re-réglé.
La table optique a été déplacé d'environ 1cm vers le canon pour s'aligner un peu mieu à la sortie
CFP. |
VK, IC, LS, ND; Summary of the ring commissioning meeting
|
Discussion mécanique
- Tous les dipoles ont été alignés par rapport à des surfaces de référence
- Le décalage du centre magnétique par rapport au centre mécanique a été mesuré par Cynthia et pris |