    Reply   ND; RE: Summary of the ring commissioning meeting 
Regarding the remote control of the RF synthetizer: it can only be controlled via GPIB and RS-232.

=> Phase shift will be done from the synchro synthetiser

=> Power control can be done with a variable attenuator controlled by the synchro synthetiser or a delay generator.
Entry   IC, VK, VM, SC, ND; Summary of the ring commissioning meeting 20_injections.jpg
Notes from last week:


Beam was very unstable (probably energy instabilities), lot of time was spent tuning the injector.
Beam instabilities prevented
us from having a good storage.
Unable to start the extraction line dipole.


Comments:
Entry   VK, VM, SC, ND, HG; Summary of the ring commissioning meeting 
Summary of last week:

- On Thursday the beam energy was very different from usual (magnets current higher 172A for TL; 176A for RI) => made it impossible to re-use
previous settings for the ring and to find new settings.
Entry   VK,IC, SC, VM, ND; Summary of the ring commissioning meeting 
No beam last week. No beam this week.

Machine recovery on 2/2 => Nicolas may try to tune the machine with students.

Data taking on 9/2 for diags and machine characterization.
Entry   ND; Notes from ThomX Physics meeting 
Present: IC, VK, VM, VC, SC, MEK, KD, MJ, HG, ND, MO (sous réserve d'oublis)

Visio: CB

L'ordre du jour et les transparents présentés en réunion sont sur: https://indico.ijclab.in2p3.fr/event/9205/
Entry   ND; Verification variables pour l'anneau ring_vars_2023_02_09_12_15.png
L'IHM de verification des variables pour l'anneau a ete mis a jour.

Il est accessible dans plateforme IHM section "Outils", éeme collone, "eme ligne: "Check vars for RING".

Utilisation de l 'IHM (voir copie d'ecran ci-joint):
Entry   VM, VK, ND; Summary of the ring commissioning meeting 
This week: beam on Thursday.

So far we did not see any screenshot of Ring variables check.

Looking at last week's data, shot to shot charge instability seems to be > 15%
    Reply   ND; RE: Notes from ThomX Physics meeting 
Présent: VK, SC, KD, MJ, HG, ND

Présentation par Marie. Cf indico https://indico.ijclab.in2p3.fr/event/9242/

Demo par Slava.
Entry   IC, VM, SC, JH, VC, ND; Summary of the ring commissioning meeting data_2023-03-10_15-39-12.pngtbt_x_relative_integer2.pngtune_simulation.pngtune.pngtbt_x_kicker.png
Excitation (betatron oscillation) on the beam observed by exciting it with the extraction kicker => initial measures of the tune.

Tune measured close from expected value.

Reason for oscillation damping is not understood.
Entry   IC, VK, VM, JH, ND; Summary of the ring commissioning meeting 
- Went up to 100kV in the cavity once it was tuned.

- Achieved nice storage stable for 2500 turns and some beam for > 100ms

- Measured the tune: several peaks around 0.35[1] (near the expected value) and one peak not understood at 0.5
Entry   ND; Réunion Physique ThomX 
Transparents sur: https://indico.ijclab.in2p3.fr/event/9358/

Quelques notes de la réunion de Physique de ThomX:

- Présentation de Marie sur les mesures dans le linac
Entry   KD; mesures et shifts Linac 
Réunion 31/03

Prochaines mesures à faire :

Canon :
Entry   IC, VK, LS, JH, ND; Summary of the ring commissioning meeting 
=== Summary of last week:

- Frequency was reduced to 500.0202MHz but the beam stayed only for 100s of turns

- Good storage was achieved at 500.40MHz:
Entry   VK, IC, JH, VM, LS, MB, ND; Summary of the ring commissioning meeting 
Main studies:

- Measure bucket width in phase on Thursday at 500.02MHz => no storage beyond 45kV

- Measure frequency with spectrum analyser => 500.39MHz
Entry   KD; Mise en place Ligne X gain_pico.pngfenetre_pico.png
Aujourd'hui (09/06/2023), la Table1 de la ligne X est mise en position faisceau. Je l'ai approximativement alignée dans le faisceau. 

Le cablage du pico1 (XLI/OP/TMD.01) est le suivant :

- ch1: diode écran fluo (XLI/OP/TMD.01/I1)
Entry   IC, VK, VM, LS, JH, MB, ND; Summary of the ring commissioning meeting 
Comments:

* There are strong evidences that part of the frequency problem comes from mechanical issue

* Fring field of the dipoles seems to be longer than anticipated. This could lead to shortening of the orbit.
Entry   IC, VK, VM, LS, JH, SC, ND; Summary of the ring commissioning meeting 
Report from last week:

- Attempted the strategy suggested by Alex

- Comparison of orbit with RF ON and RF OFF helped understand the "natural" frequency of the ring: 500.33MHz
    Reply   KD; RE: Mise en place Ligne X 
hier et ce matin la ligne a été re-réglé.

La table optique a été déplacé d'environ 1cm vers le canon pour s'aligner un peu mieu à la sortie
CFP.
Entry   VK, IC, LS, ND; Summary of the ring commissioning meeting 
Discussion mécanique

- Tous les dipoles ont été alignés par rapport à des surfaces de référence

- Le décalage du centre magnétique par rapport au centre mécanique a été mesuré par Cynthia et pris