  39   Mon Dec 5 10:05:11 2022 VK, IC, VM, JH, KD, NDNew SolutionInfoanalyse Summary of the ring commissioning meeting The ring orbit has been re-established
despite some difficulties after the shutdown.

The ring cavity has been started.
  
  38   Mon Nov 7 23:53:29 2022 VK, IC, VM, JH, NDNew SolutionInforesumes Summary of the ring commissioning meeting Discussed recent orbit correction of
the expanded orbit. 

Need
to make run with  cavity detuning from
  
  37   Mon Oct 17 10:02:07 2022 VK, IC, VI, JH, SC, NDReference SolutionInforesumes Summary of the ring commissioning meeting #5 See slides attached to the indico page
https://indico.ijclab.in2p3.fr/event/8885/

Pb with BPM => visual check
  
  36   Mon Oct 10 10:37:43 2022 IC, VK, VI, VC, JH, HG, ND New SolutionShift summaryPrise de donnees RE: RE: RE: Ring objectives To do list:

(0) Re-establish beam transport
to ring
  
  35   Mon Oct 10 10:04:49 2022 VK, IC, VI, JH, NDUnder ProcessShift summaryresumes Summary of the ring commissioning meeting #4 - 300 turns achieved.

- Probably more but limited by
libera cut-off frequency.
  
  34   Wed Oct 5 09:51:12 2022 IC, VK, VI, VC, JH, HG, ND New SolutionShift summaryPrise de donnees RE: RE: Ring objectives New to do list:

(0) Re-establish beam transport
to ring
  
  33   Mon Oct 3 17:29:53 2022 IC, VK, VI (ND)New SolutionInforesumes Summary of the ring commissioning meeting #3 
Shift summaries for the ring for last
week are at

https://elog.lal.in2p3.fr/THOMX/Commissionning/568

https://elog.lal.in2p3.fr/THOMX/Commissionning/570

  
  32   Wed Sep 28 09:56:44 2022 ND, ICReference SolutionInfodocs Steerers and BPM map for the ring See attached files.  BPM_ring.pngBPM_ring.pptx 
  31   Tue Sep 27 17:45:54 2022 NDUnder ProcessInfodocs RE: Beam requirements for the ring An IHM to check some of these parameters
has been created (git/panneaux/StatusInfoIHM_ring_vars.py)
and added to Plateforme_IHM...
  
  30   Mon Sep 26 10:21:20 2022 IC, VK, VI, VC, JH, HG, ND New SolutionShift summaryPrise de donnees RE: Ring objectives (1),  (2), (4) and (5) from last week
have been done other items in progress.

New to do list:
  
  29   Mon Sep 26 09:39:15 2022 VK, IC, AM, NDNew SolutionInfoPrise de donnees Summary of the ring commissioning meeting #2 Slides are at https://indico.ijclab.in2p3.fr/event/8750/

- There is a difference in BPM
numbering in Tango and MML => we should
  
  28   Fri Sep 23 09:44:14 2022 IC, VK, AM, VC, NDUnder ProcessInfodocs Beam requirements for the ring The following parameters are required for
ring operations:

- At least 50pC on TL/DG/ICT.01
  
  27   Mon Sep 19 16:29:06 2022 IC, VK, VI, VC, JH, HG, ND New SolutionShift summaryPrise de donnees Ring objectives This entry is to be updated as the work
progresses.

1) Re-establish beam transport
  
  26   Mon Sep 19 15:56:28 2022 IC, VK, VI, VC, JH, HG, NDNew SolutionInfoPrise de donnees Summary of the ring commissioning meeting #1 Status slides presented by Iryna available
on indico at https://indico.ijclab.in2p3.fr/event/8749/

The beam parameters required for
  
  25   Fri Sep 2 08:51:46 2022 MO Shift summaryetc démarrage 8h35  mise sous tension: PSS, LB9000,
modulateur, chillers
  
  24   Wed Aug 17 11:42:41 2022 MO HMUnder ProcessInfoPrise de donnees test RF modulateur longue durée (journée) but : test fonctionnement modulateur et
RF sur la journée

8h55 démarrage modulateur
 Screenshot_from_2022-08-18_15-56-17.png 
  23   Wed Aug 17 09:48:31 2022 HM MOUnder ProcessInfoPrise de donnees redemarrage 17 aout 2022 9h30 redemarrage HM MO

- niveau 1 verifié (circuit
eau, air comprimé, etat modulateur
  
  22   Fri Mar 4 11:07:28 2022 CB/SC Problemproblemes liste des actions à menées     
  21   Thu Mar 4 17:07:32 2021 Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 17:07:19 2021Under ProcessShift summaryPrise de donnees Tests IHM RF Les tests se sont bien déroulés,
on observe bien les signaux correspondants
au redpitayas demandés.
  
  20   Thu Mar 4 16:59:43 2021 Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:59:30 2021Under ProcessShift summaryPrise de donnees tests redpitaya 4 Tests des redpitaya 4 voie 1 (Photodiode)
et voie 2 (Q section)
 RDP.04_voie1.pngRDP.04_voie2.png 