| ID |
Date |
Author |
Status |
Type |
Category |
Important |
Subject |
Icon |
Text |
 |
|
39
|
Mon Dec 5 10:05:11 2022 |
VK, IC, VM, JH, KD, ND | New Solution | Info | analyse |
|
Summary of the ring commissioning meeting | | The ring orbit has been re-established
despite some difficulties after the shutdown.
The ring cavity has been started. |
| |
38
|
Mon Nov 7 23:53:29 2022 |
VK, IC, VM, JH, ND | New Solution | Info | resumes |
|
Summary of the ring commissioning meeting | | Discussed recent orbit correction of
the expanded orbit.
Need
to make run with cavity detuning from |
| |
37
|
Mon Oct 17 10:02:07 2022 |
VK, IC, VI, JH, SC, ND | Reference Solution | Info | resumes |
|
Summary of the ring commissioning meeting #5 | | See slides attached to the indico page
https://indico.ijclab.in2p3.fr/event/8885/
Pb with BPM => visual check |
| |
36
|
Mon Oct 10 10:37:43 2022 |
IC, VK, VI, VC, JH, HG, ND | New Solution | Shift summary | Prise de donnees |
|
RE: RE: RE: Ring objectives | | To do list:
(0) Re-establish beam transport
to ring |
| |
35
|
Mon Oct 10 10:04:49 2022 |
VK, IC, VI, JH, ND | Under Process | Shift summary | resumes |
|
Summary of the ring commissioning meeting #4 | | - 300 turns achieved.
- Probably more but limited by
libera cut-off frequency. |
| |
34
|
Wed Oct 5 09:51:12 2022 |
IC, VK, VI, VC, JH, HG, ND | New Solution | Shift summary | Prise de donnees |
|
RE: RE: Ring objectives | | New to do list:
(0) Re-establish beam transport
to ring |
| |
33
|
Mon Oct 3 17:29:53 2022 |
IC, VK, VI (ND) | New Solution | Info | resumes |
|
Summary of the ring commissioning meeting #3 | |
Shift summaries for the ring for last
week are at
https://elog.lal.in2p3.fr/THOMX/Commissionning/568
https://elog.lal.in2p3.fr/THOMX/Commissionning/570
|
| |
32
|
Wed Sep 28 09:56:44 2022 |
ND, IC | Reference Solution | Info | docs |
|
Steerers and BPM map for the ring | | See attached files. |
 | |
31
|
Tue Sep 27 17:45:54 2022 |
ND | Under Process | Info | docs |
|
RE: Beam requirements for the ring | | An IHM to check some of these parameters
has been created (git/panneaux/StatusInfoIHM_ring_vars.py)
and added to Plateforme_IHM... |
| |
30
|
Mon Sep 26 10:21:20 2022 |
IC, VK, VI, VC, JH, HG, ND | New Solution | Shift summary | Prise de donnees |
|
RE: Ring objectives | | (1), (2), (4) and (5) from last week
have been done other items in progress.
New to do list: |
| |
29
|
Mon Sep 26 09:39:15 2022 |
VK, IC, AM, ND | New Solution | Info | Prise de donnees |
|
Summary of the ring commissioning meeting #2 | | Slides are at https://indico.ijclab.in2p3.fr/event/8750/
- There is a difference in BPM
numbering in Tango and MML => we should |
| |
28
|
Fri Sep 23 09:44:14 2022 |
IC, VK, AM, VC, ND | Under Process | Info | docs |
|
Beam requirements for the ring | | The following parameters are required for
ring operations:
- At least 50pC on TL/DG/ICT.01 |
| |
27
|
Mon Sep 19 16:29:06 2022 |
IC, VK, VI, VC, JH, HG, ND | New Solution | Shift summary | Prise de donnees |
|
Ring objectives | | This entry is to be updated as the work
progresses.
1) Re-establish beam transport |
| |
26
|
Mon Sep 19 15:56:28 2022 |
IC, VK, VI, VC, JH, HG, ND | New Solution | Info | Prise de donnees |
|
Summary of the ring commissioning meeting #1 | | Status slides presented by Iryna available
on indico at https://indico.ijclab.in2p3.fr/event/8749/
The beam parameters required for |
| |
25
|
Fri Sep 2 08:51:46 2022 |
MO | | Shift summary | etc |
|
démarrage | | 8h35 mise sous tension: PSS, LB9000,
modulateur, chillers |
| |
24
|
Wed Aug 17 11:42:41 2022 |
MO HM | Under Process | Info | Prise de donnees |
|
test RF modulateur longue durée (journée) | | but : test fonctionnement modulateur et
RF sur la journée
8h55 démarrage modulateur |
| |
23
|
Wed Aug 17 09:48:31 2022 |
HM MO | Under Process | Info | Prise de donnees |
|
redemarrage 17 aout 2022 | | 9h30 redemarrage HM MO
- niveau 1 verifié (circuit
eau, air comprimé, etat modulateur |
| |
22
|
Fri Mar 4 11:07:28 2022 |
CB/SC | | Problem | problemes |
|
liste des actions à menées | | |
| |
21
|
Thu Mar 4 17:07:32 2021 |
Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 17:07:19 2021 | Under Process | Shift summary | Prise de donnees |
|
Tests IHM RF | | Les tests se sont bien déroulés,
on observe bien les signaux correspondants
au redpitayas demandés. |
| |
20
|
Thu Mar 4 16:59:43 2021 |
Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:59:30 2021 | Under Process | Shift summary | Prise de donnees |
|
tests redpitaya 4 | | Tests des redpitaya 4 voie 1 (Photodiode)
et voie 2 (Q section) |
 |
|