  1   Tue Nov 19 11:16:39 2019 Entered by Hayg Guler from 134.158.195.145 on Tue Nov 19 11:16:25 2019Under ProcessShift summaryPrise de donnees   

Salle de controle :

  • installer Xlib pour tout le monde
  • mettre les environnements en place

IHM vide :

  • couleurs ??

Chiller :

  • rajouter Rac17 AI1
  • voir avec Maher pour faire une IHM

Plateforme IHM

  • faire des icones plus gros
  • rajouter

Modulateur

  • A mettre en remote
  • sur l'interface cliquer sur Remote
  • mettre les secondes ou barre de progression sur le panneau Modulateur
    • plutot de d'aller sur Jive

Laser

  • voir la procédure pour le démarrage
    • Ampli
    • Oscillateur
    • Synchro
  • Lame demi-onde (equivalent de la densité optique) -- LI/OP/OPT.01.Att.01
    • sera dans l'IHM
    • pour tuner l'energie Laser
    • on devra faire la calibration
  2   Tue Jul 7 14:25:15 2020 Entered by bruni from 134.158.195.142 on Tue Jul 7 14:24:55 2020Under ProcessShift summaryPrise de donnees test régulation températures canon/section 

Ouverture des chillers et du frigo sur place.

Ouverture de l'IHM plateforme

Mise frigo ON et les chillersV

canon à 6V, et section à  6.3V

Mise à jour de l'état des boutons verts frigo et chiller

trend température, ajouter autoscale, bouton clear ne semble pas marcher

On met la consigne canon à 7V, la température monte à 33 degrés

Si le frigo s'arrete, il se met en défaut. La température monte au niveau des chillers, qui sont bridés à 10V (50 degrés).

Il faut récupérer l'état des chillers (booleen qui va venir d'un cablage des chillers, et à connecter à l'automate). Si un des états est off et que la RF est ON, il faut couper la RF (trig modulateur).

 

 

 

 

Attachment 1: screenshotIHM_RF.png
screenshotIHM_RF.png
  Draft   Wed Jul 8 14:33:04 2020 Entered by bruni from 134.158.195.142 on Wed Jul 8 14:32:48 2020Under ProcessShift summaryPrise de donnees test moteur solénoide en charge 

Prise de mesure relative entre les deux bobines : 18.7cm avec les alimentations éteintes mais du refroidissement.

Mise en route des alimentations 80A sur la contre champ, et 275 sur la focalisante.

Prise de mesure à nouveau : 18.7cm --> ca n'a pas bougé

On bouge le moteur Translation  li/ae/col.01-mot.01 qui doit faire une translation horizontale : +6 mm butée, -25mm.

On remet off les alimentations des solnénoides

L'encodeur pos ne se met pas à jour : on en déduit que le moteu ne marche pas correctement

On fait la translation verticale col01-mot.02

 

 

 

 

 

  4   Thu Jul 16 09:50:37 2020 Entered by Sophie Chance from 134.158.195.143 on Thu Jul 16 09:50:21 2020Under ProcessInfoetc demarrage à blanc 

debut du démarrage à blanc 9h45. Démarrage prévu par étape.

  12   Wed Dec 9 14:33:08 2020 HaygUnder ProcessInfoetc RE:  

Pour info :

  • client 1 ne fonctionne pas encore. Il n'a pas été utilisé depuis longtemps, Guillaume a été prévenu pour y jeter un oeil.
  • Client 3 et 5 sont maintenant aux places qui n'ont qu'un seul écran. Une MAJ de la salle devra être faite pour
    • déplacer l'écran de sécu sur une autre table dans un angle (fond gauche ou droit)
    • mettre soit 4 écrans / soit un grand écran aux autres machines (excepté celui de la table CC)
      • Il faudra s'assurer que les écrans de grande taille puisse se mettre sur la table (attache)

 

  14   Wed Mar 3 10:49:14 2021 HaygUnder ProcessInfoproblemes WC tests TANGO 
  1. CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.03_Ch0_chargeMean
  2. CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.01_Ch0_chargeMean
  3. CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.02_Ch0_chargeMean
  4. CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.02_Ch3_chargeMean
  5. CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.02_Ch4_chargeMean

 

Dans les variables MeanStd :

  • Charge 1 :
    • er_ca_rac.05-elr.01-wac.01_Ch0_chargeMean 
  • Charge 2 :
    • er_ca_rac.05-elr.01-wac.02_Ch0_chargeMean   
    • er_ca_rac.05-elr.01-wac.02_Ch3_chargeMean  
    • er_ca_rac.05-elr.01-wac.02_Ch4_chargeMean  
  • Charge 3 :
    • er_ca_rac.05-elr.01-wac.03_Ch0_chargeMean

 

  15   Wed Mar 3 11:30:46 2021 HaygUnder ProcessInfoproblemes RE: WC tests TANGO 

 

Hayg wrote:
  1. CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.03_Ch0_chargeMean
  2. CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.01_Ch0_chargeMean
  3. CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.02_Ch0_chargeMean
  4. CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.02_Ch3_chargeMean
  5. CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.02_Ch4_chargeMean

 

Dans les variables MeanStd :

  • Charge 1 :
    • er_ca_rac.05-elr.01-wac.01_Ch0_chargeMean 
  • Charge 2 :
    • er_ca_rac.05-elr.01-wac.02_Ch0_chargeMean   
    • er_ca_rac.05-elr.01-wac.02_Ch3_chargeMean  
    • er_ca_rac.05-elr.01-wac.02_Ch4_chargeMean  
  • Charge 3 :
    • er_ca_rac.05-elr.01-wac.03_Ch0_chargeMean

 

 

Attachment 1: Screenshot_from_2021-03-03_11-29-57.png
Screenshot_from_2021-03-03_11-29-57.png
  16   Thu Mar 4 16:36:12 2021 Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:35:53 2021Under ProcessShift summaryPrise de donnees Tests IHM RF  

De nouveaux tests ont été fait sur l'IHM RF amélioré (M. Omeich, H. Guler, S. Chance, JN. Cayla)

Tous les redpitayas ont été testés via un générateur de retard.

Attachment 1: IHM_RF.png
IHM_RF.png
  17   Thu Mar 4 16:46:04 2021 Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:45:48 2021Under ProcessShift summaryPrise de donnees   

Test du repitaya 1 voie 1 (Pi section) et 2 (Pr section)

 

Attachment 1: RDP.01_voie1.png
RDP.01_voie1.png
Attachment 2: RDP.01_voie2.png
RDP.01_voie2.png
  18   Thu Mar 4 16:56:19 2021 Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:56:07 2021Under ProcessShift summaryPrise de donnees redpitaya 2 

Tests du redpitaya 2 voie 1 (Boucle section) voie 2 est libre

Attachment 1: RDP.02_voie1.png
RDP.02_voie1.png
  19   Thu Mar 4 16:57:46 2021 Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:57:33 2021Under ProcessShift summaryPrise de donnees tests redpitaya 3 

Tests des redpitayas 3 voie 1 (Pi canon) et voie 2 (Pr canon)

Attachment 1: RDP.03_voie1.png
RDP.03_voie1.png
Attachment 2: RDP.03_voie2.png
RDP.03_voie2.png
  20   Thu Mar 4 16:59:43 2021 Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:59:30 2021Under ProcessShift summaryPrise de donnees tests redpitaya 4 

Tests des redpitaya 4 voie 1 (Photodiode) et voie 2 (Q section)

Attachment 1: RDP.04_voie1.png
RDP.04_voie1.png
Attachment 2: RDP.04_voie2.png
RDP.04_voie2.png
  21   Thu Mar 4 17:07:32 2021 Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 17:07:19 2021Under ProcessShift summaryPrise de donnees Tests IHM RF 

Les tests se sont bien déroulés, on observe bien les signaux correspondants au redpitayas demandés.

Il faudra faire une modification sur l'IHM car tango bloque par moment et cela "freeze" l'IHM que l'on doit complètement redémarrer.

  23   Wed Aug 17 09:48:31 2022 HM MOUnder ProcessInfoPrise de donnees redemarrage 17 aout 2022 

9h30 redemarrage HM MO

- niveau 1 verifié (circuit eau, air comprimé, etat modulateur et SF6)

- ronde modulateur faite

- lancement IHM

      lancement IHM modulateur : pas de reaction

      accès à la casemate bloqué car sonde T3G est en défaut, redémarrage du système mesures radioprotection (LB 9000) ==> sonde T3G Ok

- ronde casemate faite

- démarrage modulateur en local

- utilisation de heath check pour redemarrer les servers

- demarrage modulateur HT = 1000 V et refroidissement a distance (sdc)

13h probleme de synchro : pas de synchro sur modulateur - a verifier

--> la notice synchro stipule de démarrer le laser photocathode en mode interne : mise sous tension du laser : ok

- la synchro externe modulateur fonctionne. HT = 1090 V , Frep = 10 Hz.

       visualisation de PiC et Prc dans le hall D1 et salle de controle sur oscillo : ok

--> pas trouvé comment visualiser les signaux RF avec interface Taurus

visualisation Pis et Prs

--> sauvegarde signaux RF sur clef usb

bilan : 3h de RF dans la canon et la section LIL, vide correct

test longue durée demain

17h15 arret

 

 

 

 

  24   Wed Aug 17 11:42:41 2022 MO HMUnder ProcessInfoPrise de donnees test RF modulateur longue durée (journée) 

but : test fonctionnement modulateur et RF sur la journée

8h55 démarrage modulateur et refroidissement

10h00 démarrage RF ( HV=1090V )

visualisation signaux RF avec taurus plot : Pic Prc Pis Prs et photodiode

 -->  taurus plot er/sy/rac.17-elr.01-rdp.03/waveform_cha er/sy/rac.17-elr.01-rdp.03/waveform_chb  er/sy/rac.17-elr.01-rdp.01/waveform_cha er/sy/rac.17-elr.01-rdp.01/waveform er/sy/rac.17-elr.01-rdp.04/waveform_cha er/sy/rac.17-elr.01-rdp.04/waveform_chb

13h00 RF en fonctionnement depuis 10h00 ( pas d'interlocks )

14h00 RF ok - pas d'interlock modulateur

15h00 RF ok - pas d'interlock modulateur

16h00 RF ok - pas d'interlock modulateur

17h00 RF ok - pas d'interlock modulateur

17h15 arret

bilan : aucun interlock modulateur de 10h a 17h, tres peu de claquages , vide bon (1e-9 mbar), regulation temperature canon et section ok.

 

 

Attachment 1: Screenshot_from_2022-08-18_15-56-17.png
Screenshot_from_2022-08-18_15-56-17.png
  28   Fri Sep 23 09:44:14 2022 IC, VK, AM, VC, NDUnder ProcessInfodocs Beam requirements for the ring 

The following parameters are required for ring operations:

- At least 50pC on TL/DG/ICT.01 with std <20pC

- At least 20pC on TL/DG/ICT.02 with std <20pC

- Energy in the TL must be checked and must be 50 MeV =>  TL/BPM.02 SpX, SpY <1mm  with Std(SpX, SpY) <1mm with nominal value for TL/PS/DP.01

- Beam position must be checked on TL/DG/SST.01, TL/DG/SST.02 and TL/DG/SST.03 and be within the acceptance (see tickbox acceptance on IHM_SST).

- Beam size must be measured on TL/DG/SST.03 and be < 2mm FWHM

- Beam recipes for the LI and for the TL must be saved.

- Health check must be checked (no red entry).

- Beam centered on the last quadrupoles of the transfer line.

This list will evolve as we progress in the ring commissioning.

 

  31   Tue Sep 27 17:45:54 2022 NDUnder ProcessInfodocs RE: Beam requirements for the ring 

An IHM to check some of these parameters has been created (git/panneaux/StatusInfoIHM_ring_vars.py) and added to Plateforme_IHM...

Quote:

The following parameters are required for ring operations:

- At least 80pC on TL/DG/ICT.01 with std <20pC

- At least 20pC on TL/DG/ICT.02 with std <20pC

- Energy in the TL must be checked and must be 50 MeV =>  TL/BPM.02 SpX, SpY <1mm  with Std(SpX, SpY) <1mm with nominal value for TL/PS/DP.01

- Beam position must be checked on TL/DG/SST.01, TL/DG/SST.02 and TL/DG/SST.03 and be within the acceptance (see tickbox acceptance on IHM_SST).

- Beam size must be measured on TL/DG/SST.03 and be < 2mm FWHM

- Beam recipes for the LI and for the TL must be saved.

- Health check must be checked (no red entry).

- Beam centered on the last quadrupole of the transfer line.

This list will evolve as we progress in the ring commissioning.

 

 

  35   Mon Oct 10 10:04:49 2022 VK, IC, VI, JH, NDUnder ProcessShift summaryresumes Summary of the ring commissioning meeting #4 

- 300 turns achieved.

- Probably more but limited by libera cut-off frequency.

- Need to measure the injection axis

- Need emittance measurement from the transfer line

- Several measurements are not possible because of lack of progress on the transfer line

 

  52   Fri Mar 31 10:37:18 2023 KDUnder ProcessOtherPrise de donnees mesures et shifts Linac 

Réunion 31/03

Prochaines mesures à faire :

Canon :

- Scan charge/Phase

- Scan énergie/Phase

 

Linac :

- investiguer le champ B des quads VS théorie (comparaison mesures mag et MML)

- remesurer quelques points (taille faisceau) de la TL et comparer avec la propagation.

 

 

 

 

  32   Wed Sep 28 09:56:44 2022 ND, ICReference SolutionInfodocs Steerers and BPM map for the ring 

See attached files.

Attachment 1: BPM_ring.png
BPM_ring.png
Attachment 2: BPM_ring.pptx
  37   Mon Oct 17 10:02:07 2022 VK, IC, VI, JH, SC, NDReference SolutionInforesumes Summary of the ring commissioning meeting #5 

See slides attached to the indico page https://indico.ijclab.in2p3.fr/event/8885/

Pb with BPM => visual check of electrodes + hardware swap

Pb with steerer => Need to identify who will do the intervention and when

Nicolas will ask Kevin for support.

Suggestion: Since the magnetic field stability of the bending magnet which is being used to measure the beam energy is still questioned, it is suggested to wind a wire into a small, flat, electric coil and to place it in the magnet gap or close to it so that the field crosses orthogonally the coil plane, and to monitor the voltage across the coil with an oscilloscope (the e- beam being turned off and the bending magnet being powered, of course). Some dimensional calculation would be needed.

Alignement: Slava got the data from Denis. Alignment is close from nominal values.
The beam quality is good enough to start working with the RF cavity. Even with low power in  RF cavity we would like to have a first control of voltage and phase from the control room (Thursday or Friday afternoon).

Some energy instabilities have been observed. Look at correlations (Vincent's measurements) + check that the current operating phase is optimal.

=> Check if position fluctuations are the same with one steerer on, TL/DP/PS.01 off + TL/SST1 and steerer off, TL/DP/PS.01 on + TL/SST2.

Optimum injection trajectory has been recorded on Friday.

 

Next meeting: 7th Novembre

 

 

 

 

 

  13   Thu Dec 10 14:43:07 2020 Entered by Nicolas Delerue from 193.55.29.171 on Thu Dec 10 14:42:53 2020Not FixedProblemproblemes Clients 1, 4 et 5 non fonctionnels 

En complément du message de Hayg, client 4 et 5 ne fonctionnent pas non plus (en plus de client 1).

Nicolas

  26   Mon Sep 19 15:56:28 2022 IC, VK, VI, VC, JH, HG, NDNew SolutionInfoPrise de donnees Summary of the ring commissioning meeting #1 

Status slides presented by Iryna available on indico at https://indico.ijclab.in2p3.fr/event/8749/

The beam parameters required for a good injection in the ring were discussed.

The following required parameters were identified:

- At least 80pC on TL/DG/ICT.01

- At least 20pC on TL/DG/ICT.02

- Energy in the TL must be checked and must be 50 MeV.

- Beam position must be checked on TL/DG/SST.01, TL/DG/SST.02 and TL/DG/SST.03 and be within the acceptance (see tickbox acceptance on IHM_SST).

- Beam size must be measured on TL/DG/SST.03 and be < 2mm FWHM

- Beam recipes for the LI and for the TL must be saved.

- Health check must be checked (no red entry).

- Beam centered on the last quadrupole of the transfer line.

ACTION: Nicolas will create an interface that displays as many as possible of the required parameters.

Suggestion by Viktor: check phase noise at the gun entrance: there might a phase noise issue.

=> Vincent (VC) is going to do that with Viktor (VI) during RF studies on 26th September

Planning for the coming week:

- Wednesday: Slava (+Iryna after the CoDEC)

- Thursday: Nicolas + all

- Friday: AG Pole. Alexandre and Vincent plus Slava

Current objectives:

1) Re-establish beam transport to ring

2) Scan in time the septum

3) Scan in voltage the septum

4) Adjust timing of kicker by looking at induced noise on ICTs

5) Scan in time the kicker

6) Scan in voltage the kicker

7) Transport further in the ring by playing with correctors

Note: When possible Alexandre will test his feedback code.

 

  27   Mon Sep 19 16:29:06 2022 IC, VK, VI, VC, JH, HG, ND New SolutionShift summaryPrise de donnees Ring objectives 

This entry is to be updated as the work progresses.

1) Re-establish beam transport to ring

2) Scan in time the septum

see script git/panneaux/Synchro/scan_septum.py

3) Scan in voltage the septum

4) Adjust timing of kicker by looking at induced noise on ICTs

5) Scan in time the kicker

git/panneaux/Synchro/scan_kicker.py

6) Scan in voltage the kicker

7) Transport further in the ring by playing with correctors

Note: When possible Alexandre will test his feedback code.

  29   Mon Sep 26 09:39:15 2022 VK, IC, AM, NDNew SolutionInfoPrise de donnees Summary of the ring commissioning meeting #2 

Slides are at https://indico.ijclab.in2p3.fr/event/8750/

- There is a difference in BPM numbering in Tango and MML => we should stick to Tango names.

- Beam was very unstable during the past week

- Difficulties to have full current on RI-C1/BPM.01. Signal drops already significanty before RI-C2/BPM.06

- Fluctuations may have been observed on the RF Gun power => to be confirmed

- Fluctuations have been observed on the kicker => may be due to energy jitter

To do:

- Monitor incident power on RF Gun

- Re-establish transport

- Try to inject with optimised TL transport

- Compare single pass and TbT BPM signals

- Check energy jitter in TL/BPM.02 and TL/SST.02

- Scan correctors to increase current on RI-C1/BPM.01 and RI-C2/BPM.06

- Start align beam in quadrupoles

  30   Mon Sep 26 10:21:20 2022 IC, VK, VI, VC, JH, HG, ND New SolutionShift summaryPrise de donnees RE: Ring objectives 

(1),  (2), (4) and (5) from last week have been done other items in progress.

New to do list:

(0) Re-establish beam transport to ring

(1) Monitor incident power on RF Gun

(2) Check energy jitter in TL/BPM.02 and TL/SST.02

(3) Use TL optimised transport when available

(4) Compare single pass and TbT BPM signals

(5) Test Alexandre's feedback code.

(6) Scan correctors to increase current on RI-C1/BPM.01 and RI-C2/BPM.06

(7) Start align beam in quadrupoles
 

Quote:

This entry is to be updated as the work progresses.

1) Re-establish beam transport to ring

2) Scan in time the septum

see script git/panneaux/Synchro/scan_septum.py

3) Scan in voltage the septum

4) Adjust timing of kicker by looking at induced noise on ICTs

5) Scan in time the kicker

git/panneaux/Synchro/scan_kicker.py

6) Scan in voltage the kicker

7) Transport further in the ring by playing with correctors

Note: When possible Alexandre will test his feedback code.

 

  33   Mon Oct 3 17:29:53 2022 IC, VK, VI (ND)New SolutionInforesumes Summary of the ring commissioning meeting #3 
Shift summaries for the ring for last week are at

https://elog.lal.in2p3.fr/THOMX/Commissionning/568

https://elog.lal.in2p3.fr/THOMX/Commissionning/570

https://elog.lal.in2p3.fr/THOMX/Commissionning/571

The problem with the pulse jumpis with 12ns delays has been identified and fixed (it was related to the synchronisation system).

The main issue identified last week is a problem with RI-C2/PS/QP.09, RI-C2/PS/QP.10 and RI-C2/PS/QP.12 which has been addressed after the meeting (see https://elog.lal.in2p3.fr/THOMX/Commissionning/572).

It is important that the laser energy and linac beam charge are checked and optimised every week.
  34   Wed Oct 5 09:51:12 2022 IC, VK, VI, VC, JH, HG, ND New SolutionShift summaryPrise de donnees RE: RE: Ring objectives 

New to do list:

(0) Re-establish beam transport to ring

(0bis) Check energy jitter in TL/BPM.02 and TL/SST.02

(1) Try to merge TL optimised transport with ring injection transport => record beam size on TL/SST3 and position on TL/BPM.03 and TL/BPM.04 for current ring transport

(2) Reduce betatron oscillations

(3) Measure and correct orbits

(4) Measure Tune

(5) BBA

(6) Improve charge transport at injection

(7) Start MRSV

 

 

Quote:

(1),  (2), (4) and (5) from last week have been done other items in progress.

New to do list:

(0) Re-establish beam transport to ring

(1) Monitor incident power on RF Gun

(2) Check energy jitter in TL/BPM.02 and TL/SST.02

(3) Use TL optimised transport when available

(4) Compare single pass and TbT BPM signals

(5) Test Alexandre's feedback code.

(6) Scan correctors to increase current on RI-C1/BPM.01 and RI-C2/BPM.06

(7) Start align beam in quadrupoles
 

Quote:

This entry is to be updated as the work progresses.

1) Re-establish beam transport to ring

2) Scan in time the septum

see script git/panneaux/Synchro/scan_septum.py

3) Scan in voltage the septum

4) Adjust timing of kicker by looking at induced noise on ICTs

5) Scan in time the kicker

git/panneaux/Synchro/scan_kicker.py

6) Scan in voltage the kicker

7) Transport further in the ring by playing with correctors

Note: When possible Alexandre will test his feedback code.

 

 

  36   Mon Oct 10 10:37:43 2022 IC, VK, VI, VC, JH, HG, ND New SolutionShift summaryPrise de donnees RE: RE: RE: Ring objectives 

To do list:

(0) Re-establish beam transport to ring

(0bis) Check energy jitter in TL/BPM.02 and TL/SST.02

(0ter) Measure emittance on TL/SST.03

(1) Try to merge TL optimised transport with ring injection transport => record beam size on TL/SST3 and position on TL/BPM.03 and TL/BPM.04 for current ring transport

définir avec précision les caractéristiques du faisceau en fin de TL pour pouvoir passer au commissioning de l'anneau (et fournir les diagnostics nécessaires pour contrôler ces "bons" réglages de la TL, et savoir qui en est en charge de quoi)

(2) Improve charge transport at injection

(3) Measure and correct orbits

programmer des mesures sur l'anneau permettant d'établir des connexions entre le modèle d'Iryna et l'état actuel de l'anneau (il y a évidemment la mesure des nombres d'ondes

(4) Start MRSV

(5) Measure Tune

 

 

Quote:

New to do list:

(0) Re-establish beam transport to ring

(0bis) Check energy jitter in TL/BPM.02 and TL/SST.02

(1) Try to merge TL optimised transport with ring injection transport => record beam size on TL/SST3 and position on TL/BPM.03 and TL/BPM.04 for current ring transport

(2) Reduce betatron oscillations

(3) Measure and correct orbits

(4) Measure Tune

(5) BBA

(6) Improve charge transport at injection

(7) Start MRSV

 

 

Quote:

(1),  (2), (4) and (5) from last week have been done other items in progress.

New to do list:

(0) Re-establish beam transport to ring

(1) Monitor incident power on RF Gun

(2) Check energy jitter in TL/BPM.02 and TL/SST.02

(3) Use TL optimised transport when available

(4) Compare single pass and TbT BPM signals

(5) Test Alexandre's feedback code.

(6) Scan correctors to increase current on RI-C1/BPM.01 and RI-C2/BPM.06

(7) Start align beam in quadrupoles
 

Quote:

This entry is to be updated as the work progresses.

1) Re-establish beam transport to ring

2) Scan in time the septum

see script git/panneaux/Synchro/scan_septum.py

3) Scan in voltage the septum

4) Adjust timing of kicker by looking at induced noise on ICTs

5) Scan in time the kicker

git/panneaux/Synchro/scan_kicker.py

6) Scan in voltage the kicker

7) Transport further in the ring by playing with correctors

Note: When possible Alexandre will test his feedback code.

 

 

 

  38   Mon Nov 7 23:53:29 2022 VK, IC, VM, JH, NDNew SolutionInforesumes Summary of the ring commissioning meeting 
Discussed recent orbit correction of the expanded orbit. 
Need to make run with  cavity detuning from its resonant conditions used in the conditioning. 
 
Discussed measurement of tune, and possible origins of inconsistant/noisy measurements.  Either BPMs signal processing or  weak excitation. Beam size?
Need to do measurements with scope, to see if we can interpret TbT data in post-processing. Will ask Vincent to help with scope and measurements.
 
Need of RF cavity operation to continue ring commissioning.
 
  39   Mon Dec 5 10:05:11 2022 VK, IC, VM, JH, KD, NDNew SolutionInfoanalyse Summary of the ring commissioning meeting 

The ring orbit has been re-established despite some difficulties after the shutdown.

The ring cavity has been started. Whatever the phase it kills the beam.
Two hypothesis:

1) It can be a frequency problem

2) It can be a transverse kick given by the cavity

About 1:

- Magnet current and frequency have been scanned but no effect.

About 2:

- We see betatron oscillation.

We see the beam lost by steps, not a continuous decrease.

https://elog.lal.in2p3.fr/THOMX/Commissionning/221202_190728/Screenshot_from_2022-12-02_18-02-36.png shows betatron oscillation with cavity tuned.

Next steps:

- Mesure FFT of BPM signal (VM, VC)

- "Open the ring" (kick the beam out of the ring) and study the effect of the cavity (phase, power) on the BPMs. (VK, IC)

- Scan betatron oscillation vs phase, orbit, power and frequency

- Slava: To catch the beam you should think like a beam.

Actions:

- Try to get remote control of RF synthetizer (ND)

 

 

  41   Tue Dec 6 00:15:55 2022 NDNew SolutionInfoanalyse RE: Summary of the ring commissioning meeting 

Regarding the remote control of the RF synthetizer: it can only be controlled via GPIB and RS-232.

=> Phase shift will be done from the synchro synthetiser

=> Power control can be done with a variable attenuator controlled by the synchro synthetiser or a delay generator.

 

 

Quote:

The ring orbit has been re-established despite some difficulties after the shutdown.

The ring cavity has been started. Whatever the phase it kills the beam.
Two hypothesis:

1) It can be a frequency problem

2) It can be a transverse kick given by the cavity

About 1:

- Magnet current and frequency have been scanned but no effect.

About 2:

- We see betatron oscillation.

We see the beam lost by steps, not a continuous decrease.

https://elog.lal.in2p3.fr/THOMX/Commissionning/221202_190728/Screenshot_from_2022-12-02_18-02-36.png shows betatron oscillation with cavity tuned.

Next steps:

- Mesure FFT of BPM signal (VM, VC)

- "Open the ring" (kick the beam out of the ring) and study the effect of the cavity (phase, power) on the BPMs. (VK, IC)

- Scan betatron oscillation vs phase, orbit, power and frequency

- Slava: To catch the beam you should think like a beam.

Actions:

- Try to get remote control of RF synthetizer (ND)

 

 

 

  42   Mon Jan 9 10:12:40 2023 IC, VK, VM, SC, NDNew SolutionInforesumes Summary of the ring commissioning meeting 

Notes from last week:

  • Beam was very unstable (probably energy instabilities), lot of time was spent tuning the injector.
  • Beam instabilities prevented us from having a good storage.
  • Unable to start the extraction line dipole.

Comments:

  • It seems too early to plan radioprotection checks as:
    • we have not yet been able to store the beam and then extract it in a working extraction line.
    • beam is too unstable.
  • Beam instabilities prevent progress on the ring studies.
  • Beam stability characterisation of the upstream parts of the accelerator are necessary.

 

Attachment 1: 20_injections.jpg
20_injections.jpg
  43   Mon Jan 16 09:38:16 2023 VK, VM, SC, ND, HGNew SolutionInforesumes Summary of the ring commissioning meeting 

Summary of last week:

- On Thursday the beam energy was very different from usual (magnets current higher 172A for TL; 176A for RI) => made it impossible to re-use previous settings for the ring and to find new settings.

- On bith days, beam was unstable at TL/SST.02 and at the entrance of the ring. Part of the stability (but not enough) was recovered by setting TL/QP.4 and TL/QP5 to the same value.

=> not able to keep the beam in the ring for more than 500us or to inject more than 50pC.

Requirements to discuss on Friday:

- Get the results of the klystron power measurements

- Energy and charge stability

- Establish a working point for the lines.

- Linac alignement

Measurements to be done and documented:

- Stability of dark current (VM on 2/2)

- stability shot to shot and hourly-stability  (laser power, laser position, phase gun-laser [VC is working on it], phase gun-entrance section, phase gun-exit section, charge at the exit of the gun, charge at the exit of the section, energy and charge in the dispersive line)
=> charge stability measurement ND on 2/2 + 9/2.

- Dipole power supplies and dipole field

- RF power stability (Klystron, ...)

- Data alignement (ND on 2/2 + 2/9)

 

 

 

 

  44   Mon Jan 23 09:54:14 2023 VK,IC, SC, VM, NDNew SolutionInforesumes Summary of the ring commissioning meeting 

No beam last week. No beam this week.

Machine recovery on 2/2 => Nicolas may try to tune the machine with students.

Data taking on 9/2 for diags and machine characterization.

Next shift for the ring on Friday 17/2 + Friday 24/2 + Friday 10/3. No beam on 3/3 (winter vacation).

Beam on 9/3 will be dedivcated to BPM training for PERLE.

 

Reminder for the previous ring meeting - Measurements to be done and documented:

- Stability of dark current (VM on 2/2 or 9/2; ND to prepare the measure with ICT+WAC ; IC will prepare measure with scope)

- stability shot to shot and hourly-stability  (laser power, laser position, phase gun-laser [VC is working on it], phase gun-entrance section, phase gun-exit section, charge at the exit of the gun, charge at the exit of the section, energy and charge in the dispersive line)
=> charge stability measurement ND on 2/2 + 9/2.

- Data alignement (ND on 2/2 + 2/9)

Next ring meeting 13/2

 

  45   Tue Jan 24 10:14:20 2023 NDNew SolutionInfoPrise de donnees Notes from ThomX Physics meeting 

Present: IC, VK, VM, VC, SC, MEK, KD, MJ, HG, ND, MO (sous réserve d'oublis)

Visio: CB

L'ordre du jour et les transparents présentés en réunion sont sur: https://indico.ijclab.in2p3.fr/event/9205/

Actions à faire:

- Vincent a montré que le laser met ~1h avant de se stabiliser en phase par rapport au signal de synchronisation 3GHz. Il faut donc démarrer le laser (START_AMPLI) dès la mise en chauffe du modulateur.

- Mise en place d'un système de retroaction en salle laser (Vincent)

- Campagne de mesure détaillée du klystron prévu pour la semaine commeçant le 30 janvier.

- Pour trouver la phase d'énergie maximale, il faut calculer le déphasage Canon-Laser PC par rapport à la chute de charge lors du balayage en phase. Christelle va circuler la valeur recommandée.

- Accorder la section RF linac à l'energie maximale (Mohammed?)

- Refaire des mesures de courant d'obscurité (Vincent + Viktor M. + Nicolas)

- Circuler les sorties Astra en fin de linac à 100pC pour permettre des simulations de la propagation du faisceau dans la TL (Christelle)

- Il faut toujours faire fonctionner la ligne de transfert avec le même courant dans les aimants. Slava va circuler la valeur à utiliser.

- La maille LI+TL actuelle a été calculée pour 1nC. Il faut terminer définir la maille LI+TL à 100pC et vérifier sa validité (Christelle + Sophie)

- Circuler la maille LI+TL et des images donnant les taille de faisceau attendues sur chaque écran SST.

- Améliorer la stabilité (charge, énergie, position) de la ligne de transfert, surtout dans sa partie dispersive.

- Il faut calibrer les écrans SST (Nicolas)

 

 

  46   Thu Feb 9 12:16:41 2023 NDNew SolutionInfoPrise de donnees Verification variables pour l'anneau 

L'IHM de verification des variables pour l'anneau a ete mis a jour.

Il est accessible dans plateforme IHM section "Outils", éeme collone, "eme ligne: "Check vars for RING".

Utilisation de l 'IHM (voir copie d'ecran ci-joint):

-Chaque ligne donne une valeur et (lorsque c'est pertinent) sa std ainsi que le besoinde l'anneau sur cette variable.

- Si la variable est dans la plage acceptable, la diode devient verte.

Pour inclure l'image dans le e-log cliauer sur "Take screenshot". L'image est sauvee dans  /data/shared/Commissioning_tools/Mesure/today/

 

 

 

Attachment 1: ring_vars_2023_02_09_12_15.png
ring_vars_2023_02_09_12_15.png
  47   Mon Feb 20 10:06:36 2023 VM, VK, NDNew SolutionInforesumes Summary of the ring commissioning meeting 

This week: beam on Thursday.

So far we did not see any screenshot of Ring variables check.

Looking at last week's data, shot to shot charge instability seems to be > 15%

We need transverse emittance measurement for the ring shift (Thursday).

  48   Fri Feb 24 10:34:58 2023 NDNew SolutionInfoPrise de donnees RE: Notes from ThomX Physics meeting 

Présent: VK, SC, KD, MJ, HG, ND

Présentation par Marie. Cf indico https://indico.ijclab.in2p3.fr/event/9242/

Demo par Slava.

Prochaine réunion le 24 mars.

 

 

Quote:

Present: IC, VK, VM, VC, SC, MEK, KD, MJ, MO (sous réserve d'oublis)

Visio: CB

L'ordre du jour et les transparents présentés en réunion sont sur: https://indico.ijclab.in2p3.fr/event/9205/

Actions à faire:

- Vincent a montré que le laser met ~1h avant de se stabiliser en phase par rapport au signal de synchronisation 3GHz. Il faut donc démarrer le laser (START_AMPLI) dès la mise en chauffe du modulateur.

- Mise en place d'un système de retroaction en salle laser (Vincent)

- Campagne de mesure détaillée du klystron prévu pour la semaine commeçant le 30 janvier.

- Pour trouver la phase d'énergie maximale, il faut calculer le déphasage Canon-Laser PC par rapport à la chute de charge lors du balayage en phase. Christelle va circuler la valeur recommandée.

- Accorder la section RF linac à l'energie maximale (Mohammed?)

- Refaire des mesures de courant d'obscurité (Vincent + Viktor M. + Nicolas)

- Circuler les sorties Astra en fin de linac à 100pC pour permettre des simulations de la propagation du faisceau dans la TL (Christelle)

- Il faut toujours faire fonctionner la ligne de transfert avec le même courant dans les aimants. Slava va circuler la valeur à utiliser.

- La maille LI+TL actuelle a été calculée pour 1nC. Il faut terminer définir la maille LI+TL à 100pC et vérifier sa validité (Christelle + Sophie)

- Circuler la maille LI+TL et des images donnant les taille de faisceau attendues sur chaque écran SST.

- Améliorer la stabilité (charge, énergie, position) de la ligne de transfert, surtout dans sa partie dispersive.

- Il faut calibrer les écrans SST (Nicolas)

 

 

 

  49   Mon Mar 13 09:39:39 2023 IC, VM, SC, JH, VC, NDNew SolutionShift summaryanalyse Summary of the ring commissioning meeting 

Excitation (betatron oscillation) on the beam observed by exciting it with the extraction kicker => initial measures of the tune.

Tune measured close from expected value.

Reason for oscillation damping is not understood.

The attenatuator of the RF section has to be tuned from time to time to keep the beam energy (beam position on TL/BPM.02).

Energy tolerance of the ring lattice: +/- 1% (but this may affect the transport upstram in the TL).

Next steps:

- Measure oscillations at different cavity power to see how they are affected.

 

 

 

 

Attachment 1: data_2023-03-10_15-39-12.png
data_2023-03-10_15-39-12.png
Attachment 2: tbt_x_relative_integer2.png
tbt_x_relative_integer2.png
Attachment 3: tune_simulation.png
tune_simulation.png
Attachment 4: tune.png
tune.png
Attachment 5: tbt_x_kicker.png
tbt_x_kicker.png
  50   Mon Mar 20 10:08:24 2023 IC, VK, VM, JH, NDNew SolutionInforesumes Summary of the ring commissioning meeting 

- Went up to 100kV in the cavity once it was tuned.

- Achieved nice storage stable for 2500 turns and some beam for > 100ms

- Measured the tune: several peaks around 0.35[1] (near the expected value) and one peak not understood at 0.5

- We observed storage at different frequencies spaced by about 10kHz

- Shall we try to return close from the nominal frequency?

 

Current status wrt to X-ray search:

- First we need to be able to reach reproducable storage from day to day

- X-ray searches can be started parasitically when the beam is stored

- Better understanding of the beam will come through measurements (at least until the summer): precise measurements of optics, beam parameters will be possible only with repeatable operations. This is crucial to reach the target parameters of the ring.

 

Next steps:

- This week (Friday afternoon - if beam available): try to reproduce results from last Friday; store, study injection, dispersion

- Next week: Thursday continue work on reproducibility; Friday 31st: scan in frequency starting from nominal frequency at lower voltage.

  51   Thu Mar 23 12:29:05 2023 NDNew SolutionInforesumes Réunion Physique ThomX 

Transparents sur: https://indico.ijclab.in2p3.fr/event/9358/

Quelques notes de la réunion de Physique de ThomX:

- Présentation de Marie sur les mesures dans le linac

- Présentation de Slava sur les  progrès de l'anneau

Actions pour la prochaine réunion:

- Mesures de paramètres de Twiss TL/SST.01 et TL/SST.03 with LI/COL=220A and LI/COL= 225A

- Réduire la fréquence de l'anneau

 

 

  53   Mon May 22 10:05:30 2023 IC, VK, LS, JH, NDNew SolutionShift summaryanalyse Summary of the ring commissioning meeting 

=== Summary of last week:

- Frequency was reduced to 500.0202MHz but the beam stayed only for 100s of turns

- Good storage was achieved at 500.40MHz:

* Study of the effect of beam energy (linac section attenuator) on the orbit

* first attempts of BBA

=== Measures to do

Thursday: goal store at 500.0202MHz

- Use a spectrum analyser to check the FFT of the BPM electrodes as function of dipole current (Nicolas)

- Scan RF cavity (phase + plunger) at 500.0202MHz (Lisa+ Nicolas)

- check BPM convention (Lisa)

- Adjust beam energy (linac section attenuator and phase) to adjust ring frequency

Friday: Goal increase cavity voltage

- Orbit correction (BBA+SVD) (Iryna + Slava)

- Measure momentum compaction factor

 

  54   Tue May 30 10:12:30 2023 VK, IC, JH, VM, LS, MB, NDNew SolutionInfoanalyse Summary of the ring commissioning meeting 

Main studies:

- Measure bucket width in phase on Thursday at 500.02MHz => no storage beyond 45kV

- Measure frequency with spectrum analyser => 500.39MHz

- Preliminary study of BPM polarity

Next studies:

- Study again BPM polarities

- Redo spectrum analyser/FFT measurements of orbits at injection

- Study magnetic elements in balistic mode

- Visually look at the ring to see possible issues and changes to make

- Continue to do beam physics at 500.40MHz especially dynamic aperture

- Try to localize where losses occur during operations

 

 

  55   Fri Jun 9 19:57:14 2023 KDNew SolutionInfoPrise de donnees Mise en place Ligne X 

Aujourd'hui (09/06/2023), la Table1 de la ligne X est mise en position faisceau. Je l'ai approximativement alignée dans le faisceau. 

Le cablage du pico1 (XLI/OP/TMD.01) est le suivant :

- ch1: diode écran fluo (XLI/OP/TMD.01/I1)

- ch2: non connecté ==> bouchon (XLI/OP/TMD.01/I2)

- ch3: 1e diode détecteur à diode (XLI/OP/TMD.01/I3)

- ch4: 2e diode détecteur à diode (XLI/OP/TMD.01/I4)

La valeur des attributs ci-dessus est en pA,

le temps d'intégration est 50ms (ITM en 100us ==> 500 = 50ms),

le gain est réglé à 1 (50pC) et 0 (2nC) pour les ch1/2 et ch3/4 respectivement (cf P.J.).

La fenetre jive du pico est en P.J.

attention au polling des attribut qui est sur 1s.

Attention les pico ne sont pas trigger pour le moment !

Tout est pret pour chercher les X.

 

Attachment 1: gain_pico.png
gain_pico.png
Attachment 2: fenetre_pico.png
fenetre_pico.png
  Draft   Mon Jun 12 09:51:00 2023 IC, VK, VM, LS, JH, MB, NDNew SolutionInfoPrise de donnees Summary of the ring commissioning meeting 

Comments:

* There are strong evidences that part of the frequency problem comes from mechanical issue

* Fring field of the dipoles seems to be longer than anticipated. This could lead to shortening of the orbit.

Decisions:

* Have a meeting with mechanics to understand what are the issues and what are the possibilities to address the ring length issue.

* CFP is welcome to operate *remotely* during ring operations. A script will be made to monitor the X-ray flux during operations.

* Wednesday, Thursday and Friday : CFP can access until 11h.

* Investigate the operation of the BLM.

* Tuesday afternoon Nicolas and Sophie will investigate the feedback issue (phase or attenuator to stabilize TL/BPM.02/SpX).

Plan for this week: prepare the beam to test the X-ray production.

 

 

  57   Mon Jun 19 09:46:32 2023 IC, VK, VM, LS, JH, SC, NDNew SolutionShift summaryresumes Summary of the ring commissioning meeting 

Report from last week:

- Attempted the strategy suggested by Alex

- Comparison of orbit with RF ON and RF OFF helped understand the "natural" frequency of the ring: 500.33MHz

- Attempts to store at 500.22MHz did not sicceed. Storage at 500.27MHz.

Goals for this week:

- Beam on Thursday and Friday

- Work on BBA (IC, VK, VM) + extraction and BPMs (ND, LS)

- Measure below deformation

 

 

 

  58   Thu Jun 22 07:41:18 2023 KDNew SolutionInfoPrise de donnees RE: Mise en place Ligne X 

hier et ce matin la ligne a été re-réglé.

La table optique a été déplacé d'environ 1cm vers le canon pour s'aligner un peu mieu à la sortie CFP.

L'écran fluo a été inséré dans le faisceau lundi. Seul la voie 1 du pico sera donc utile pour la détection.

Le pico a été reréglé avec les paramètres suivants :

le temps d'intégration est 500ms (ITM en 100us ==> 5000 = 500ms),

le gain est réglé à 4 (200pC) et 0 (2nC) pour les ch1/2 et ch3/4 respectivement.

le polling est de 100ms

le mode Half est retiré ce qui peu engendrer du bruit d'une mesure sur 2 (1 acquistion par ADC) mais augmente le nombre d'acquisition par seconde.

 

Quote:

Aujourd'hui (09/06/2023), la Table1 de la ligne X est mise en position faisceau. Je l'ai approximativement alignée dans le faisceau. 

Le cablage du pico1 (XLI/OP/TMD.01) est le suivant :

- ch1: diode écran fluo (XLI/OP/TMD.01/I1)

- ch2: non connecté ==> bouchon (XLI/OP/TMD.01/I2)

- ch3: 1e diode détecteur à diode (XLI/OP/TMD.01/I3)

- ch4: 2e diode détecteur à diode (XLI/OP/TMD.01/I4)

La valeur des attributs ci-dessus est en pA,

le temps d'intégration est 50ms (ITM en 100us ==> 500 = 50ms),

le gain est réglé à 1 (50pC) et 0 (2nC) pour les ch1/2 et ch3/4 respectivement (cf P.J.).

La fenetre jive du pico est en P.J.

attention au polling des attribut qui est sur 1s.

Attention les pico ne sont pas trigger pour le moment !

Tout est pret pour chercher les X.

 

 

  59   Mon Jun 26 09:57:52 2023 VK, IC, LS, NDNew SolutionShift summaryresumes Summary of the ring commissioning meeting 

Discussion mécanique

- Tous les dipoles ont été alignés par rapport à des surfaces de référence

- Le décalage du centre magnétique par rapport au centre mécanique a été mesuré par Cynthia et pris en compte lors de l'installation

- Difficile de décaler les dipoles de l'IP car la table a été ajoutée après et bloque le déplacement des dipoles.

- Pour déplacer tout le demi-anneau RI-C2 l'un des soufflets (près du septum risque d'être limitant). Très long temps d'approvisoinnement si l'on veut de nouveau soufflets.

- Le plus simple pour Rodolphe: bouger les 4 dipoles d'extremité (RI-C[1-2]DP.0[1,4]): 1 heure de travail (pour un test approximatif). Par contre pour revenir à une position intiale c'est 1/2 journée par dipôle.

- Pour réaligner les dipôles il faut que Denis calcul les nouveaux coordonnés.

Question à vérifier:

- est-ce que l'on a de la marge à l'IP pour déplacer les dipôles vers l'extérieur? [Mesure mardi matin avant 10h]

- quelle est la course possible pour le soufflet près du septum?

- Est-ce qu'il est possible de rattraper le fait que la chambre de RI-C2/DP.04 soit trop courte?

Stratégie:

(1) Mesure de la course possible vers l'extérieur des dipôle de l'IP

(2) Calcul par Denis des nouveux coordonnées de tous les dipôles décalés de 1mm vers l'extérieur radialement

(3) Si possible, décalage des 8 dipôles, sinon décalage de 4 dipôles.

Autre besoin:

- Faire étude sur dipôle de rechange en ajoutant des plaques en acier.

===

Objectifs de la semaine:

- Avancer sur l'orbite à 500.33MHz

- BBA

- Déplacement orbite dans IP (avec CFP)

- Vérifier/améliorer transport amont anneau

- Opérations avec ligne d'extraction

 

 

  6   Thu Dec 3 10:58:11 2020 Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 10:57:47 2020FixedInfodocs demarrage a blanc 3 dec 2020 

Bilan démarrage à blanc 3 dec 2020 : (H Monard, S Cavalier)

but : verification etat IHM pour conditionnement RF avec H Monard + JN Cayla

Sur compte H Monard : sur Client2 plateforme IHM ne se lance pas

Sur client 5 : impossible entrer le nom de logging --> reboot client 5 puis looging possible

 

plateforme IHM :

IHM qui se lancent : LinacLaser, Vide, Modulateur, RF Gun section, Alims, Ds controller, Ds status, Screenshot, Jive, Astor, (DIag)BPM, (Synchro) Phase

IHM qui ne se lancent pas : SST, WaveCat viewer, RPW, demarrage delays, Diag delays

** LinacLaser : etat lasert on/off : ok ,  status Synchro laser Etat on/off : en noir

                     acquisition image : ok, deplacement miroir 4 et 5 ok, mesure position ok

** Vide : ok . pompe qui n'existe pas en fin de voie drecte a enlever sur synoptique

** Modulateur : ok, demarrage puis modification HT fonctionne

** RF GUN_Section : consigne chiller canon grisée --> reboot  puis retour a la normale (inverser Frigo/Chiller RF canon), Temps Trend : ok

   RF signal : visu photodiode impossible --> câble debrancher puis parametres redpitaya à modifier

                  signal Photodiode visible vers 16h apres modifications des parametres 

** Ou se trouve le reglage du pulse RF (largeur du PA entre 1 et 3 µs) ?

Remarques :

Lors du conditionnement nous aurons besoin de varier la HT modulateur, la largeur RF, la frequence de repetition, les attenuateurs RF , la phase RF entre le canon et la section.

--> faire un mode conditionnement sur  IHM RF qui fait apparaitre : vide canon, vide section + trends, qui puisse piloter Frep, HT modulateur, largeur de pulse RF

Au niveau des diags, nous devrions être capable de mesurer le courant d'obscurité à la sortie du canon et de la section.

 

 

 

 

 

 

 

 

 

 

  7   Thu Dec 3 13:45:13 2020 Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 13:44:55 2020FixedInfodocs signal photodiode laser 
Attachment 1: photodiode-laser2.png
photodiode-laser2.png
  8   Thu Dec 3 13:50:27 2020 Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 13:50:13 2020FixedInfoPrise de donnees signal photodiode 03-12-20 
Attachment 1: plot.pdf
  9   Thu Dec 3 15:17:04 2020 Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 15:16:48 2020FixedInfoPrise de donnees   

Signaux RF - REdPitaya 03-12-20

Photodiode laser - RP.04 A

QS RP.04 B

 

Pic RP.03 A

Prc RP.03 B

PiS RP.02

PrS RP.02


 

 

  10   Thu Dec 3 15:26:22 2020 Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 15:26:07 2020FixedInfoPrise de donnees   

signaux photodiode PrC Qs test avec generateur impulsion ! 2 V , 3 µs (bleu ciel)  et signal avec rampe, 1V (moire), photodiode (rose)

Attachment 1: photodiode-Prc_Qs.pdf
  11   Wed Dec 9 14:26:35 2020 Entered by Hugues Monard from 134.158.195.145 on Wed Dec 9 14:26:20 2020FixedInfoetc re-organisation PC-client en SdC 

suite à la discussion de lundi 7 /12/20, les PC clients en SdC ont été déplacés et re-organisé avec les numeros client1 ,2 , 3 ,4 ,5 dans le sens horaire en salle de controle, en commencant par la gauche en entrant

+----------------------------------------------------------------+

|                  client 3           client 4                       |

|  client 2                                        client 5          |

|                                                                           |

|     client 1                                                          |

|                                                        baie RP        |

|    baie                                     \                          |

+ --------------------------------         \----------------------+    

                             porte entrée SdC

 

 

  40   Mon Dec 5 17:42:51 2022 CB/HG/SC/KDFixedInforesumes Programme linac semaine 5 décembre 

Lundi 5 décembre : redémarrage technique

Pb refroidissement  Pb réglé le mercredi matin concomitance (anneau/linac), sensible à la pression qui est dans le réseau primaire, à surveiller

Attention connectique Profibus des alimentations

Point de fonctionnement du canon à 31 degrés à 1070 V: prévoir une vérification au prochain redémarrage technique selon la tension du klystron

Absence de tableau de conversion Puissance redpitaya   gradient (KD, VC)

Réglage du laser  vérifier à la prochaine redémarrage technique

Soleno  campagne de réalignement (pas prioritaire)

Modèle mis à plat dans MML, on a fait des premières mesures seulement QP1, 2 puis le 3

Mardi 6 décembre

Point de fonctionnement, à creuser consigne température/tension klystron

Test hors MML/lentille épaisse  ca concorde

Des scans avec un seul quadrupole, QP1

Mercredi 7 décembre

Scan systématique QP1 en fonction de coil2

Kevin a retravailler le traitement des images

Iris de 0.7, halo important

Premier résultat satisfaisant d’analyse des Twiss

Améliorer la partie analyse d’image (KD)

Chercher quad à fait à appliquer en unité physique, switch2physics  ou setpv avec argument (units, ‘’Physics’), NB : TL, par défaut en online

Vérifier que les valeurs concordent, scan avant (pour checker conditions)

Mettre QP1, puis QP2, puis QP3

Améliorer : prise en compte du cyclage dans ce genre de mesure, vérifier les mesures, (KD, vérifie mesure disponibles)

  Draft   Tue Dec 1 14:35:01 2020 Entered by Hayg Guler from 134.158.195.145 on Tue Dec 1 14:34:08 2020      

Laser :

Camera : mettre le temps d'exposition à 0.2 secondes

  22   Fri Mar 4 11:07:28 2022 CB/SC Problemproblemes liste des actions à menées 
  25   Fri Sep 2 08:51:46 2022 MO Shift summaryetc démarrage 

8h35  mise sous tension: PSS, LB9000, modulateur, chillers