Entry   Entered by Hayg Guler from 134.158.195.145 on Tue Nov 19 11:16:25 2019;  
Salle de controle :


installer Xlib pour tout le monde
mettre les environnements en place


IHM vide :


couleurs ??


Chiller :
Entry   Entered by bruni from 134.158.195.142 on Tue Jul 7 14:24:55 2020; test régulation températures canon/section screenshotIHM_RF.png
Ouverture des chillers et du frigo sur place.

Ouverture de l'IHM plateforme

Mise frigo ON et les chillersV
Entry   Entered by bruni from 134.158.195.142 on Wed Jul 8 14:32:48 2020; test moteur solénoide en charge 
Prise de mesure relative entre les deux bobines : 18.7cm avec les alimentations éteintes mais du refroidissement.

Mise en route des alimentations 80A sur la contre champ, et 275 sur la focalisante.

Prise de mesure à nouveau : 18.7cm --> ca n'a pas bougé
Entry   Entered by Sophie Chance from 134.158.195.143 on Thu Jul 16 09:50:21 2020; demarrage à blanc 
debut du démarrage à blanc 9h45. Démarrage prévu par étape.
Entry   Entered by Hayg Guler from 134.158.195.145 on Tue Dec 1 14:34:08 2020;  
Laser :

Camera : mettre le temps d'exposition à 0.2 secondes
Entry   Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 10:57:47 2020; demarrage a blanc 3 dec 2020 
Bilan démarrage à blanc 3 dec 2020 : (H Monard, S Cavalier)

but : verification etat IHM pour conditionnement RF avec H Monard + JN Cayla

Sur compte H Monard : sur Client2 plateforme IHM ne se lance pas
Entry   Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 13:44:55 2020; signal photodiode laser photodiode-laser2.png
 
Entry   Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 13:50:13 2020; signal photodiode 03-12-20 plot.pdf
 
Entry   Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 15:16:48 2020;  
Signaux RF - REdPitaya 03-12-20

Photodiode laser - RP.04 A

QS RP.04 B
Entry   Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 15:26:07 2020;  photodiode-Prc_Qs.pdf
signaux photodiode PrC Qs test avec generateur impulsion ! 2 V , 3 µs (bleu ciel)  et signal avec rampe, 1V (moire), photodiode (rose)
Entry   Entered by Hugues Monard from 134.158.195.145 on Wed Dec 9 14:26:20 2020; re-organisation PC-client en SdC 
suite à la discussion de lundi 7 /12/20, les PC clients en SdC ont été déplacés et re-organisé avec les numeros
client1 ,2 , 3 ,4 ,5 dans le sens horaire en salle de controle, en commencant par la gauche en entrant

+----------------------------------------------------------------+
    Reply   Hayg; RE:  
Pour info :


client 1 ne fonctionne pas encore. Il n'a pas été utilisé depuis longtemps, Guillaume a été prévenu
pour y jeter un oeil.
Client 3 et 5 sont maintenant aux places qui n'ont qu'un seul écran. Une MAJ de la salle devra être
Entry   Entered by Nicolas Delerue from 193.55.29.171 on Thu Dec 10 14:42:53 2020; Clients 1, 4 et 5 non fonctionnels 
En complément du message de Hayg, client 4 et 5 ne fonctionnent pas non plus (en plus de client 1).

Nicolas
Entry   Hayg; WC tests TANGO 

CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.03_Ch0_chargeMean
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.01_Ch0_chargeMean
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.02_Ch0_chargeMean
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.02_Ch3_chargeMean
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.02_Ch4_chargeMean


 

Dans les variables MeanStd :


Charge 1 :

er_ca_rac.05-elr.01-wac.01_Ch0_chargeMean 


Charge 2 :

er_ca_rac.05-elr.01-wac.02_Ch0_chargeMean   
er_ca_rac.05-elr.01-wac.02_Ch3_chargeMean  
er_ca_rac.05-elr.01-wac.02_Ch4_chargeMean  


Charge
    Reply   Hayg; RE: WC tests TANGO Screenshot_from_2021-03-03_11-29-57.png
 




Hayg
wrote:




CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.03_Ch0_chargeMean
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.01_Ch0_chargeMean
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.02_Ch0_chargeMean
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.02_Ch3_chargeMean
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.02_Ch4_chargeMean


 
Entry   Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:35:53 2021; Tests IHM RF  IHM_RF.png
De nouveaux tests ont été fait sur l'IHM RF amélioré (M. Omeich, H. Guler, S. Chance, JN. Cayla)

Tous les redpitayas ont été testés via un générateur de retard.
Entry   Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:45:48 2021;  RDP.01_voie1.pngRDP.01_voie2.png
Test du repitaya 1 voie 1 (Pi section) et 2 (Pr section)

 
Entry   Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:56:07 2021; redpitaya 2 RDP.02_voie1.png
Tests du redpitaya 2 voie 1 (Boucle section) voie 2 est libre
Entry   Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:57:33 2021; tests redpitaya 3 RDP.03_voie1.pngRDP.03_voie2.png
Tests des redpitayas 3 voie 1 (Pi canon) et voie 2 (Pr canon)
Entry   Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:59:30 2021; tests redpitaya 4 RDP.04_voie1.pngRDP.04_voie2.png
Tests des redpitaya 4 voie 1 (Photodiode) et voie 2 (Q section)
Entry   Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 17:07:19 2021; Tests IHM RF 
Les tests se sont bien déroulés, on observe bien les signaux correspondants au redpitayas demandés.

Il faudra faire une modification sur l'IHM car tango bloque par moment et cela "freeze" l'IHM que l'on doit complètement
redémarrer.
Entry   CB/SC; liste des actions à menées 
 
Entry   HM MO; redemarrage 17 aout 2022 
9h30 redemarrage HM MO

- niveau 1 verifié (circuit eau, air comprimé, etat modulateur et SF6)

- ronde modulateur faite
Entry   MO HM; test RF modulateur longue durée (journée) Screenshot_from_2022-08-18_15-56-17.png
but : test fonctionnement modulateur et RF sur la journée

8h55 démarrage modulateur et refroidissement

10h00 démarrage RF ( HV=1090V )
Entry   MO; démarrage 
8h35  mise sous tension: PSS, LB9000, modulateur, chillers
Entry   IC, VK, VI, VC, JH, HG, ND; Summary of the ring commissioning meeting #1 
Status slides presented by Iryna available on indico at https://indico.ijclab.in2p3.fr/event/8749/

The beam parameters required for a good injection in the ring were discussed.

The following required parameters were identified:
Entry   IC, VK, VI, VC, JH, HG, ND ; Ring objectives 
This entry is to be updated as the work progresses.

1) Re-establish beam transport to ring

2) Scan in time the septum
Entry   IC, VK, AM, VC, ND; Beam requirements for the ring 
The following parameters are required for ring operations:

- At least 50pC on TL/DG/ICT.01 with std <20pC

- At least 20pC on TL/DG/ICT.02 with std <20pC
Entry   VK, IC, AM, ND; Summary of the ring commissioning meeting #2 
Slides are at https://indico.ijclab.in2p3.fr/event/8750/

- There is a difference in BPM numbering in Tango and MML => we should stick to Tango names.

- Beam was very unstable during the past week
    Reply   IC, VK, VI, VC, JH, HG, ND ; RE: Ring objectives 
(1),  (2), (4) and (5) from last week have been done other items in progress.

New to do list:

(0) Re-establish beam transport to ring
    Reply   ND; RE: Beam requirements for the ring 
An IHM to check some of these parameters has been created (git/panneaux/StatusInfoIHM_ring_vars.py) and added to Plateforme_IHM...




Quote:



The following parameters are required for ring operations:
Entry   ND, IC; Steerers and BPM map for the ring BPM_ring.pngBPM_ring.pptx
See attached files.
Entry   IC, VK, VI (ND); Summary of the ring commissioning meeting #3 

Shift summaries for the ring for last week are at

https://elog.lal.in2p3.fr/THOMX/Commissionning/568

https://elog.lal.in2p3.fr/THOMX/Commissionning/570

https://elog.lal.in2p3.fr/THOMX/Commissionning/571

The
problem with the pulse jumpis with 12ns delays has been identified and fixed (it was related to the synchronisation system).

The main issue identified
    Reply   IC, VK, VI, VC, JH, HG, ND ; RE: RE: Ring objectives 
New to do list:

(0) Re-establish beam transport to ring

(0bis) Check energy jitter in TL/BPM.02 and TL/SST.02
Entry   VK, IC, VI, JH, ND; Summary of the ring commissioning meeting #4 
- 300 turns achieved.

- Probably more but limited by libera cut-off frequency.

- Need to measure the injection axis
    Reply   IC, VK, VI, VC, JH, HG, ND ; RE: RE: RE: Ring objectives 
To do list:

(0) Re-establish beam transport to ring

(0bis) Check energy jitter in TL/BPM.02 and TL/SST.02
Entry   VK, IC, VI, JH, SC, ND; Summary of the ring commissioning meeting #5 
See slides attached to the indico page https://indico.ijclab.in2p3.fr/event/8885/

Pb with BPM => visual check of electrodes + hardware swap

Pb with steerer => Need to identify who will do the intervention and when
Entry   VK, IC, VM, JH, ND; Summary of the ring commissioning meeting 
Discussed recent orbit correction of the expanded orbit. 

Need to make run with  cavity detuning from its resonant conditions
used in the conditioning. 

 

Discussed measurement of tune, and possible origins of inconsistant/noisy measurements.
 Either BPMs signal processing or  weak excitation. Beam size?

Need to do measurements with scope, to see if we can interpret TbT
Entry   VK, IC, VM, JH, KD, ND; Summary of the ring commissioning meeting 
The ring orbit has been re-established despite some difficulties after the shutdown.

The ring cavity has been started. Whatever the phase it kills the beam.
Two hypothesis:
Entry   CB/HG/SC/KD; Programme linac semaine 5 décembre 
Lundi 5 décembre : redémarrage technique

Pb refroidissement  Pb réglé le mercredi matin concomitance (anneau/linac), sensible à la pression qui est dans
le réseau primaire, à surveiller
    Reply   ND; RE: Summary of the ring commissioning meeting 
Regarding the remote control of the RF synthetizer: it can only be controlled via GPIB and RS-232.

=> Phase shift will be done from the synchro synthetiser

=> Power control can be done with a variable attenuator controlled by the synchro synthetiser or a delay generator.
Entry   IC, VK, VM, SC, ND; Summary of the ring commissioning meeting 20_injections.jpg
Notes from last week:


Beam was very unstable (probably energy instabilities), lot of time was spent tuning the injector.
Beam instabilities prevented
us from having a good storage.
Unable to start the extraction line dipole.


Comments:
Entry   VK, VM, SC, ND, HG; Summary of the ring commissioning meeting 
Summary of last week:

- On Thursday the beam energy was very different from usual (magnets current higher 172A for TL; 176A for RI) => made it impossible to re-use
previous settings for the ring and to find new settings.
Entry   VK,IC, SC, VM, ND; Summary of the ring commissioning meeting 
No beam last week. No beam this week.

Machine recovery on 2/2 => Nicolas may try to tune the machine with students.

Data taking on 9/2 for diags and machine characterization.
Entry   ND; Notes from ThomX Physics meeting 
Present: IC, VK, VM, VC, SC, MEK, KD, MJ, HG, ND, MO (sous réserve d'oublis)

Visio: CB

L'ordre du jour et les transparents présentés en réunion sont sur: https://indico.ijclab.in2p3.fr/event/9205/
Entry   ND; Verification variables pour l'anneau ring_vars_2023_02_09_12_15.png
L'IHM de verification des variables pour l'anneau a ete mis a jour.

Il est accessible dans plateforme IHM section "Outils", éeme collone, "eme ligne: "Check vars for RING".

Utilisation de l 'IHM (voir copie d'ecran ci-joint):
Entry   VM, VK, ND; Summary of the ring commissioning meeting 
This week: beam on Thursday.

So far we did not see any screenshot of Ring variables check.

Looking at last week's data, shot to shot charge instability seems to be > 15%
    Reply   ND; RE: Notes from ThomX Physics meeting 
Présent: VK, SC, KD, MJ, HG, ND

Présentation par Marie. Cf indico https://indico.ijclab.in2p3.fr/event/9242/

Demo par Slava.
Entry   IC, VM, SC, JH, VC, ND; Summary of the ring commissioning meeting data_2023-03-10_15-39-12.pngtbt_x_relative_integer2.pngtune_simulation.pngtune.pngtbt_x_kicker.png
Excitation (betatron oscillation) on the beam observed by exciting it with the extraction kicker => initial measures of the tune.

Tune measured close from expected value.

Reason for oscillation damping is not understood.
Entry   IC, VK, VM, JH, ND; Summary of the ring commissioning meeting 
- Went up to 100kV in the cavity once it was tuned.

- Achieved nice storage stable for 2500 turns and some beam for > 100ms

- Measured the tune: several peaks around 0.35[1] (near the expected value) and one peak not understood at 0.5
Entry   ND; Réunion Physique ThomX 
Transparents sur: https://indico.ijclab.in2p3.fr/event/9358/

Quelques notes de la réunion de Physique de ThomX:

- Présentation de Marie sur les mesures dans le linac
Entry   KD; mesures et shifts Linac 
Réunion 31/03

Prochaines mesures à faire :

Canon :
Entry   IC, VK, LS, JH, ND; Summary of the ring commissioning meeting 
=== Summary of last week:

- Frequency was reduced to 500.0202MHz but the beam stayed only for 100s of turns

- Good storage was achieved at 500.40MHz:
Entry   VK, IC, JH, VM, LS, MB, ND; Summary of the ring commissioning meeting 
Main studies:

- Measure bucket width in phase on Thursday at 500.02MHz => no storage beyond 45kV

- Measure frequency with spectrum analyser => 500.39MHz
Entry   KD; Mise en place Ligne X gain_pico.pngfenetre_pico.png
Aujourd'hui (09/06/2023), la Table1 de la ligne X est mise en position faisceau. Je l'ai approximativement alignée dans le faisceau. 

Le cablage du pico1 (XLI/OP/TMD.01) est le suivant :

- ch1: diode écran fluo (XLI/OP/TMD.01/I1)
Entry   IC, VK, VM, LS, JH, MB, ND; Summary of the ring commissioning meeting 
Comments:

* There are strong evidences that part of the frequency problem comes from mechanical issue

* Fring field of the dipoles seems to be longer than anticipated. This could lead to shortening of the orbit.
Entry   IC, VK, VM, LS, JH, SC, ND; Summary of the ring commissioning meeting 
Report from last week:

- Attempted the strategy suggested by Alex

- Comparison of orbit with RF ON and RF OFF helped understand the "natural" frequency of the ring: 500.33MHz
    Reply   KD; RE: Mise en place Ligne X 
hier et ce matin la ligne a été re-réglé.

La table optique a été déplacé d'environ 1cm vers le canon pour s'aligner un peu mieu à la sortie
CFP.
Entry   VK, IC, LS, ND; Summary of the ring commissioning meeting 
Discussion mécanique

- Tous les dipoles ont été alignés par rapport à des surfaces de référence

- Le décalage du centre magnétique par rapport au centre mécanique a été mesuré par Cynthia et pris