HOME Prise de donnees MML Controle commande Simulations Notes Hardware Ligne X Laser Interaction Diagnostiques Synchronisation
Commissionning Commissionning Preparation Pannes ShiftCheck
  Notes concernant la preparation du Commissionning, all entries  Not logged in ThomX    logo
Entry   Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:59:30 2021; tests redpitaya 4 RDP.04_voie1.pngRDP.04_voie2.png
Entry   Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:57:33 2021; tests redpitaya 3 RDP.03_voie1.pngRDP.03_voie2.png
Entry   Entered by bruni from 134.158.195.142 on Tue Jul 7 14:24:55 2020; test régulation températures canon/section screenshotIHM_RF.png
Entry   Entered by bruni from 134.158.195.142 on Wed Jul 8 14:32:48 2020; test moteur solénoide en charge 
Entry   MO HM; test RF modulateur longue durée (journée) Screenshot_from_2022-08-18_15-56-17.png
Entry   Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 13:44:55 2020; signal photodiode laser photodiode-laser2.png
Entry   Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 13:50:13 2020; signal photodiode 03-12-20 plot.pdf
Entry   Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:56:07 2021; redpitaya 2 RDP.02_voie1.png
Entry   HM MO; redemarrage 17 aout 2022 
Entry   Entered by Hugues Monard from 134.158.195.145 on Wed Dec 9 14:26:20 2020; re-organisation PC-client en SdC 
Entry   KD; mesures et shifts Linac 
Entry   CB/SC; liste des actions à menées 
Entry   MO; démarrage 
Entry   Entered by Sophie Chance from 134.158.195.143 on Thu Jul 16 09:50:21 2020; demarrage à blanc 
Entry   Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 10:57:47 2020; demarrage a blanc 3 dec 2020 
Entry   Hayg; WC tests TANGO 
Entry   ND; Verification variables pour l'anneau ring_vars_2023_02_09_12_15.png
Entry   Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:35:53 2021; Tests IHM RF  IHM_RF.png
Entry   Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 17:07:19 2021; Tests IHM RF 
Entry   VK, IC, VI, JH, SC, ND; Summary of the ring commissioning meeting #5 
Entry   VK, IC, VI, JH, ND; Summary of the ring commissioning meeting #4 
Entry   IC, VK, VI (ND); Summary of the ring commissioning meeting #3 
Entry   VK, IC, AM, ND; Summary of the ring commissioning meeting #2 
Entry   IC, VK, VI, VC, JH, HG, ND; Summary of the ring commissioning meeting #1 
Entry   VK, IC, VM, JH, ND; Summary of the ring commissioning meeting 
Entry   VK, IC, VM, JH, KD, ND; Summary of the ring commissioning meeting 
Entry   IC, VK, VM, SC, ND; Summary of the ring commissioning meeting 20_injections.jpg
Entry   VK, VM, SC, ND, HG; Summary of the ring commissioning meeting 
Entry   VK,IC, SC, VM, ND; Summary of the ring commissioning meeting 
Entry   VM, VK, ND; Summary of the ring commissioning meeting 
Entry   IC, VM, SC, JH, VC, ND; Summary of the ring commissioning meeting data_2023-03-10_15-39-12.pngtbt_x_relative_integer2.pngtune_simulation.pngtune.pngtbt_x_kicker.png
Entry   IC, VK, VM, JH, ND; Summary of the ring commissioning meeting 
Entry   IC, VK, LS, JH, ND; Summary of the ring commissioning meeting 
Entry   VK, IC, JH, VM, LS, MB, ND; Summary of the ring commissioning meeting 
Entry   IC, VK, VM, LS, JH, MB, ND; Summary of the ring commissioning meeting 
Entry   IC, VK, VM, LS, JH, SC, ND; Summary of the ring commissioning meeting 
Entry   VK, IC, LS, ND; Summary of the ring commissioning meeting 
Entry   ND, IC; Steerers and BPM map for the ring BPM_ring.pngBPM_ring.pptx
Entry   ND; Réunion Physique ThomX 
Entry   IC, VK, VI, VC, JH, HG, ND ; Ring objectives 
    Reply   Hayg; RE: WC tests TANGO Screenshot_from_2021-03-03_11-29-57.png
    Reply   ND; RE: Summary of the ring commissioning meeting 
    Reply   IC, VK, VI, VC, JH, HG, ND ; RE: Ring objectives 
    Reply   IC, VK, VI, VC, JH, HG, ND ; RE: RE: Ring objectives 
    Reply   IC, VK, VI, VC, JH, HG, ND ; RE: RE: RE: Ring objectives 
    Reply   ND; RE: Notes from ThomX Physics meeting 
    Reply   KD; RE: Mise en place Ligne X 
    Reply   ND; RE: Beam requirements for the ring 
    Reply   Hayg; RE:  
Entry   CB/HG/SC/KD; Programme linac semaine 5 décembre 
Entry   ND; Notes from ThomX Physics meeting 
Entry   KD; Mise en place Ligne X gain_pico.pngfenetre_pico.png
Entry   Entered by Nicolas Delerue from 193.55.29.171 on Thu Dec 10 14:42:53 2020; Clients 1, 4 et 5 non fonctionnels 
Entry   IC, VK, AM, VC, ND; Beam requirements for the ring 
Entry   Entered by Hayg Guler from 134.158.195.145 on Tue Nov 19 11:16:25 2019;  
Entry   Entered by Hayg Guler from 134.158.195.145 on Tue Dec 1 14:34:08 2020;  
Entry   Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 15:16:48 2020;  
Entry   Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 15:26:07 2020;  photodiode-Prc_Qs.pdf
Entry   Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:45:48 2021;  RDP.01_voie1.pngRDP.01_voie2.png
ELOG V3.1.4-395e101