Entry   IC, VK, VM, JN;  6x
8h50 Start of the modumator and all subsystems

PC client 1 was frozen => we restarted

10h20 HV on 1215 V
Entry   Entered by Super Team from 134.158.195.141 on Thu Nov 14 08:33:03 2024;  15x
08h30 Start ThomX

10h00 HV is 'ON'

11h03 RF Gun phase 230 dg. Att. 0.0 dB, Laser Att. 360.00, Charge -145 pC, Section Att. 2.59 dB, Phase 207 dg.
Entry   VM Entered by Super Team from 134.158.195.141 on Thu Nov 21 08:26:43 2024;  
08H25 Start ThomX

09H45 HV is 'ON'

09h49 Breakdown in the RF Gun
Entry   VM, IC, VK ;  
08h18 Start ThomX

10h00 HV is 'ON'

10h35 RF Gun phase is 174 dg. Section Phase is  209 dg. Sect. Att. is 2.70 dB TL/BPM2 X=0, Charge is -127 pC
Entry   VM Entered by Super Team from 134.158.195.141 on Thu Dec 5 08:31:12 2024;  
08h28 Start ThomX

08h40 Some magnets remain switched off. Cycling was not performed

10h20 V is 'ON'
Entry   VM, IC, VK, HG ;  8x
08h25 Start ThomX

09h55 HV is 'ON'

10h18 RF Gun Phase is 159 dg. Sect. Phase is 208 dg. Att. 2.66 TL/BPM2 X=-2mm, Isol =230 A, Charges: -115 pC, -95.7 pC, -100 pC
Entry   VM, IC, VK;  Screenshot_from_2024-12-13_11-28-46.pngScreenshot_from_2024-12-13_14-44-28.pngScreenshot_from_2024-12-13_14-46-59.png
08h23 Start ThomX

09h40 HV is 'On'

10h24 RF Gun Phase 183 dg. Sect. Att. is 2.533, Phase 212 dg. Charges; -100.0 pC, -93.0 pC, -109.0 pC, Linac steerers H [2.68 -4.4], V [-2.0
Entry   IC, VK, VM;  
11h05 Start ThomX

11h50 BPM02-Libera04 wiring has been checked: 'OK' 

12h20 HV is 'ON' 1215 V
Entry   IC, VK, VM, ND;  15x
08h35 Start ThomX: Modulator, Frigo, All magnets.

08h40 Cicling all magnets, Start Chillers 

10h00 HV is 'On'
Entry   IC, VK, VM, ND;  10x
08h25 Start ThomX: Modulator, Frigo, cycling all magnets

08h30 Start chillers

10h00 HV is 'On'
Entry   VM, IC, VK;  10x
08h25 Start ThomX: Modulator, frigo

08h35 Start chilers, laser, cycling all magnets

10h05 HV is 'On'
Entry   MV, IC, VK;  16x
08h43 Start ThomX: Modulator, frigo, laser, cycling all magnets

08h50 Chillers started

09h52 HV is 'On'
Entry   MJ HG;  Q_vs_SolenoScan_at_17-21-28.png
** Alignement Q1Q3 du jour

str1H 0.69
str1V -3.03
Entry   MV, IC, VK, RC;  
08h41 Start Thomx: Modulator, Frigo, Laser

08h46 Start chillers, all magnets sycling

09h50 Start RF
Entry   MV, IC, VK, RC;  
08h45 Start Thomx: Modulator, frigo, laser

08h50 Start chillers, cycling all magnets

Vacuum intervention, beam pipe closed. Vacuum OK to start (11.23)
Entry   MV, IC, VK, RC;  Screenshot_from_2025-01-24_17-35-38_61p5MeV.pngScreenshot_from_2025-01-24_17-34-48_61p5MeV.pngScreenshot_from_2025-01-24_17-34-23_61p5MeV.png
08h45 Start Thomx: Modulator, frigo, laser

08h50 Start chillers, cycling all magnets

Vacuum intervention, beam pipe closed. Vacuum OK to start (11.23)
Entry   Entered by Super Team from 134.158.195.141 on Fri Feb 14 08:21:09 2025;  
08h20 Start ThomX: modulator, laser, fridge,cycling all magnets

08h25 chillers are started

09h50 Controlled access (Rhonic)
Entry   Entered by Super Team from 134.158.195.141 on Wed Feb 19 08:27:57 2025;  
08h26 Start ThomX: Modulator, Fridge, Laser

08h32 Chillers were started, cycling all magnets

11H changement de la carte synchro... Carte synchro opérationnel
Entry   Entered by Super Team from 134.158.195.141 on Thu Feb 20 08:24:55 2025;  6x
08h25 Start ThomX; Start ThomX: Modulator, Fridge, Laser

08h32 Chillers were started, cycling all magnets

11h23 HV is 'On'
Entry   VM, VC, RC, DN;  16x
08h53 Start ThomX

11h10 The oscilloscope installed in the bunker

11h11 HV is 'On'