IC, VK, VM, JN; 6x
|
8h50 Start of the modumator and all subsystems
PC client 1 was frozen => we restarted
10h20 HV on 1215 V |
Entered by Super Team from 134.158.195.141 on Thu Nov 14 08:33:03 2024; 15x
|
08h30 Start ThomX
10h00 HV is 'ON'
11h03 RF Gun phase 230 dg. Att. 0.0 dB, Laser Att. 360.00, Charge -145 pC, Section Att. 2.59 dB, Phase 207 dg. |
VM Entered by Super Team from 134.158.195.141 on Thu Nov 21 08:26:43 2024;
|
08H25 Start ThomX
09H45 HV is 'ON'
09h49 Breakdown in the RF Gun |
VM, IC, VK ;
|
08h18 Start ThomX
10h00 HV is 'ON'
10h35 RF Gun phase is 174 dg. Section Phase is 209 dg. Sect. Att. is 2.70 dB TL/BPM2 X=0, Charge is -127 pC |
VM Entered by Super Team from 134.158.195.141 on Thu Dec 5 08:31:12 2024;
|
08h28 Start ThomX
08h40 Some magnets remain switched off. Cycling was not performed
10h20 V is 'ON' |
VM, IC, VK, HG ; 8x
|
08h25 Start ThomX
09h55 HV is 'ON'
10h18 RF Gun Phase is 159 dg. Sect. Phase is 208 dg. Att. 2.66 TL/BPM2 X=-2mm, Isol =230 A, Charges: -115 pC, -95.7 pC, -100 pC |
VM, IC, VK;  
|
08h23 Start ThomX
09h40 HV is 'On'
10h24 RF Gun Phase 183 dg. Sect. Att. is 2.533, Phase 212 dg. Charges; -100.0 pC, -93.0 pC, -109.0 pC, Linac steerers H [2.68 -4.4], V [-2.0 |
IC, VK, VM;
|
11h05 Start ThomX
11h50 BPM02-Libera04 wiring has been checked: 'OK'
12h20 HV is 'ON' 1215 V |
IC, VK, VM, ND; 15x
|
08h35 Start ThomX: Modulator, Frigo, All magnets.
08h40 Cicling all magnets, Start Chillers
10h00 HV is 'On' |
IC, VK, VM, ND; 10x
|
08h25 Start ThomX: Modulator, Frigo, cycling all magnets
08h30 Start chillers
10h00 HV is 'On' |
VM, IC, VK; 10x
|
08h25 Start ThomX: Modulator, frigo
08h35 Start chilers, laser, cycling all magnets
10h05 HV is 'On' |
MV, IC, VK; 16x
|
08h43 Start ThomX: Modulator, frigo, laser, cycling all magnets
08h50 Chillers started
09h52 HV is 'On' |
MJ HG;
|
** Alignement Q1Q3 du jour
str1H 0.69
str1V -3.03 |
MV, IC, VK, RC;
|
08h41 Start Thomx: Modulator, Frigo, Laser
08h46 Start chillers, all magnets sycling
09h50 Start RF |
MV, IC, VK, RC;
|
08h45 Start Thomx: Modulator, frigo, laser
08h50 Start chillers, cycling all magnets
Vacuum intervention, beam pipe closed. Vacuum OK to start (11.23) |
MV, IC, VK, RC;  
|
08h45 Start Thomx: Modulator, frigo, laser
08h50 Start chillers, cycling all magnets
Vacuum intervention, beam pipe closed. Vacuum OK to start (11.23) |
Entered by Super Team from 134.158.195.141 on Fri Feb 14 08:21:09 2025;
|
08h20 Start ThomX: modulator, laser, fridge,cycling all magnets
08h25 chillers are started
09h50 Controlled access (Rhonic) |
Entered by Super Team from 134.158.195.141 on Wed Feb 19 08:27:57 2025;
|
08h26 Start ThomX: Modulator, Fridge, Laser
08h32 Chillers were started, cycling all magnets
11H changement de la carte synchro... Carte synchro opérationnel |
Entered by Super Team from 134.158.195.141 on Thu Feb 20 08:24:55 2025; 6x
|
08h25 Start ThomX; Start ThomX: Modulator, Fridge, Laser
08h32 Chillers were started, cycling all magnets
11h23 HV is 'On' |
VM, VC, RC, DN; 16x
|
08h53 Start ThomX
11h10 The oscilloscope installed in the bunker
11h11 HV is 'On' |
|