Entry   IC, VK, VM, ND;  15x
08h35 Start ThomX: Modulator, Frigo, All magnets.

08h40 Cicling all magnets, Start Chillers 

10h00 HV is 'On'
Entry   IC, VK, VM, ND;  10x
08h25 Start ThomX: Modulator, Frigo, cycling all magnets

08h30 Start chillers

10h00 HV is 'On'
Entry   VM, IC, VK;  10x
08h25 Start ThomX: Modulator, frigo

08h35 Start chilers, laser, cycling all magnets

10h05 HV is 'On'
Entry   MV, IC, VK;  16x
08h43 Start ThomX: Modulator, frigo, laser, cycling all magnets

08h50 Chillers started

09h52 HV is 'On'
Entry   MJ HG;  Q_vs_SolenoScan_at_17-21-28.png
** Alignement Q1Q3 du jour

str1H 0.69
str1V -3.03
Entry   MV, IC, VK, RC;  
08h41 Start Thomx: Modulator, Frigo, Laser

08h46 Start chillers, all magnets sycling

09h50 Start RF
Entry   MV, IC, VK, RC;  
08h45 Start Thomx: Modulator, frigo, laser

08h50 Start chillers, cycling all magnets

Vacuum intervention, beam pipe closed. Vacuum OK to start (11.23)
Entry   MV, IC, VK, RC;  Screenshot_from_2025-01-24_17-35-38_61p5MeV.pngScreenshot_from_2025-01-24_17-34-48_61p5MeV.pngScreenshot_from_2025-01-24_17-34-23_61p5MeV.png
08h45 Start Thomx: Modulator, frigo, laser

08h50 Start chillers, cycling all magnets

Vacuum intervention, beam pipe closed. Vacuum OK to start (11.23)
Entry   Entered by Super Team from 134.158.195.141 on Fri Feb 14 08:21:09 2025;  
08h20 Start ThomX: modulator, laser, fridge,cycling all magnets

08h25 chillers are started

09h50 Controlled access (Rhonic)
Entry   Entered by Super Team from 134.158.195.141 on Wed Feb 19 08:27:57 2025;  
08h26 Start ThomX: Modulator, Fridge, Laser

08h32 Chillers were started, cycling all magnets

11H changement de la carte synchro... Carte synchro opérationnel
Entry   Entered by Super Team from 134.158.195.141 on Thu Feb 20 08:24:55 2025;  6x
08h25 Start ThomX; Start ThomX: Modulator, Fridge, Laser

08h32 Chillers were started, cycling all magnets

11h23 HV is 'On'
Entry   VM, VC, RC, DN;  16x
08h53 Start ThomX

11h10 The oscilloscope installed in the bunker

11h11 HV is 'On'
Entry   VM;  9x
14h31 Start ThomX/ Modulator, Frig, Laser

14h37 Cycling all magnets, Chillers started

15h34 HV is 'On'
Entry   VM, VC, RC, IC;  12x
08h27 Start ThomX: Modulator, Laser, Frig

08h34 Chillers were started, cycling al magnets

12H ready to start beam ( 13H30)
Entry   VM, IC, RC;  Screenshot_from_2025-03-31_18-06-59.pngScreenshot_from_2025-03-31_17-52-04.pngScreenshot_from_2025-03-31_17-14-56.png2025-03-31_10_40_04_li_dg_sst_01-ccd_01_RAW.png
08h00 ThomX started by Maher

09h50 Problem with vacuum in the septum. TL-V3 and EL-V1 are closed.

ThomX configuration changed to 'Linac'.
Entry   VM, IC, DN;  
08h42 Start ThomX: Morulator, firg, laser

08h47 Chillers, cycling all magnets

10h40 HV is 'ON'
Entry   VM, RC, DN, ND;  health_check_Vide_Jauge_2025_04_17_09_25.pnghealth_check_RF_Redpitaya_2025_04_17_09_27.pngbpm_1_vs_kicker_second.pngviewer_2025_04_17_12_44_06.png20250417_175615.jpg
08h15 Start Thomx: modulator, frig, laser

08h21 Chillers started, all magnets cycling

Filesystem very slow
Entry   VM;  
08h22 ThomX was started: modulator, frig, laser

08h28 Chillers was started, all magnets cycling

09h45 HV is 'ON'
Entry   VM, IC, DN ;  
08h20 ThomX was started: Modulator, frig, laser

08h27 Chillers were started, cycling all magnets

10h50 HV is 'ON'
Entry   VM, IC;  9x
Goal: Beam Loss Monitors and Ring injection at high charge. Studies of the injector for high charge. Emittance measurements.


08h33 ThomX was started: modulator,frig, laser