IC, VK, VM, ND; 15x
|
08h35 Start ThomX: Modulator, Frigo, All magnets.
08h40 Cicling all magnets, Start Chillers
10h00 HV is 'On' |
IC, VK, VM, ND; 10x
|
08h25 Start ThomX: Modulator, Frigo, cycling all magnets
08h30 Start chillers
10h00 HV is 'On' |
VM, IC, VK; 10x
|
08h25 Start ThomX: Modulator, frigo
08h35 Start chilers, laser, cycling all magnets
10h05 HV is 'On' |
MV, IC, VK; 16x
|
08h43 Start ThomX: Modulator, frigo, laser, cycling all magnets
08h50 Chillers started
09h52 HV is 'On' |
MJ HG;
|
** Alignement Q1Q3 du jour
str1H 0.69
str1V -3.03 |
MV, IC, VK, RC;
|
08h41 Start Thomx: Modulator, Frigo, Laser
08h46 Start chillers, all magnets sycling
09h50 Start RF |
MV, IC, VK, RC;
|
08h45 Start Thomx: Modulator, frigo, laser
08h50 Start chillers, cycling all magnets
Vacuum intervention, beam pipe closed. Vacuum OK to start (11.23) |
MV, IC, VK, RC;  
|
08h45 Start Thomx: Modulator, frigo, laser
08h50 Start chillers, cycling all magnets
Vacuum intervention, beam pipe closed. Vacuum OK to start (11.23) |
Entered by Super Team from 134.158.195.141 on Fri Feb 14 08:21:09 2025;
|
08h20 Start ThomX: modulator, laser, fridge,cycling all magnets
08h25 chillers are started
09h50 Controlled access (Rhonic) |
Entered by Super Team from 134.158.195.141 on Wed Feb 19 08:27:57 2025;
|
08h26 Start ThomX: Modulator, Fridge, Laser
08h32 Chillers were started, cycling all magnets
11H changement de la carte synchro... Carte synchro opérationnel |
Entered by Super Team from 134.158.195.141 on Thu Feb 20 08:24:55 2025; 6x
|
08h25 Start ThomX; Start ThomX: Modulator, Fridge, Laser
08h32 Chillers were started, cycling all magnets
11h23 HV is 'On' |
VM, VC, RC, DN; 16x
|
08h53 Start ThomX
11h10 The oscilloscope installed in the bunker
11h11 HV is 'On' |
VM; 9x
|
14h31 Start ThomX/ Modulator, Frig, Laser
14h37 Cycling all magnets, Chillers started
15h34 HV is 'On' |
VM, VC, RC, IC; 12x
|
08h27 Start ThomX: Modulator, Laser, Frig
08h34 Chillers were started, cycling al magnets
12H ready to start beam ( 13H30) |
VM, IC, RC;   
|
08h00 ThomX started by Maher
09h50 Problem with vacuum in the septum. TL-V3 and EL-V1 are closed.
ThomX configuration changed to 'Linac'. |
VM, IC, DN;
|
08h42 Start ThomX: Morulator, firg, laser
08h47 Chillers, cycling all magnets
10h40 HV is 'ON' |
VM, RC, DN, ND;    
|
08h15 Start Thomx: modulator, frig, laser
08h21 Chillers started, all magnets cycling
Filesystem very slow |
VM;
|
08h22 ThomX was started: modulator, frig, laser
08h28 Chillers was started, all magnets cycling
09h45 HV is 'ON' |
VM, IC, DN ;
|
08h20 ThomX was started: Modulator, frig, laser
08h27 Chillers were started, cycling all magnets
10h50 HV is 'ON' |
VM, IC; 9x
|
Goal: Beam Loss Monitors and Ring injection at high charge. Studies of the injector for high charge. Emittance measurements.
08h33 ThomX was started: modulator,frig, laser |
|