Entry   KD,VM,IC;  EmittanceVsGunPhase.pngScreenshot_from_2025-05-28_11-28-14.png
08h00 ThomX was started

Goals: Emittance measurements, ring optics study

10h00 HV was 'ON'
Entry   MV Entered by Super Team from 134.158.195.141 on Fri Jun 6 08:17:16 2025;  ThomX_PhaseChargeScan20250606.pngThomX_FPC_TableVerticalScan20250606.png
08h15 ThomX was started; Modulator, Frig, Laser

08h21 Chillers were started, cycling all magnets

09h40 HV is 'ON'
Entry   VM,IC;  health_check_Diag_charge_wavecatcher_2025_06_13_10_13.pngScreenshot_from_2025-06-13_11-11-22.pngScreenshot_from_2025-06-13_14-31-57.pngScreenshot_from_2025-06-13_14-31-45.png
08h40 ThomX was started: Modulator, Frig, Laser

08h45 Chillers were started, cycling all magnets

09h56 HV is 'ON'
Entry   SC, ND;  pos_TL2_vs_phase_RF.pngpos_TL2_spX_vs_temp.pngtp2spX_vs_time.png
8h49 allumage modulateur, chiller, laser

10h00 Beam ON

Prise de données Cf images jointes.
Entry   Entered by Super Team from 134.158.195.141 on Wed Jul 2 14:45:07 2025;  
Vérif position laser photocathode :

--> bouge de 1mm en Y et 0.2 en X

Nouvelle position:
Entry   HG, DN. VM, MJ;  mrsv_2_positions_fente.png
11h40 Thomx warm-up

12h35 HV is ON

12h40 HV 1215 V
Entry   Entered by Super Team from 134.158.195.141 on Fri Oct 24 08:33:07 2025;  
08h32 Warm-up ThomX: Modulator, Laser, Fridge

08h37 Chilers were started, cycling all magnets

09h38 HV is ON
Entry   Entered by Super Team from 134.158.195.141 on Tue Oct 28 08:40:06 2025;  Screenshot_from_2025-10-28_11-48-31.pngScreenshot_from_2025-10-28_11-47-12.pngScreenshot_from_2025-10-28_11-46-55.pngScreenshot_from_2025-10-28_15-34-03.png
08h40 Warm-up ThomX: Modulator, Laser, Fridge

08h45 Chillers were started, cycling all magnets

09h45 HV is ON
Entry   Entered by Super Team from 134.158.195.141 on Wed Nov 5 12:50:37 2025;  Screenshot_from_2025-11-05_17-49-33.pngScreenshot_from_2025-11-05_17-51-14.pngScreenshot_from_2025-11-05_17-50-44.png
Matin :

Soucis synchro :
- Nicolas les a redémarré
Entry   Entered by Super Team from 134.158.195.141 on Thu Nov 6 08:30:37 2025;  SectOutput20251030.pngSectOutput20251106.png
08h30  Warm-up ThomX: Modulator, Laser, Fridge

08h36 Chillers were started, cycling all magnets

09h33 HV is ON 
Entry   Entered by Super Team from 134.158.205.4 on Fri Nov 7 18:45:38 2025;  Screenshot_from_2025-11-07_16-24-10.pngScreenshot_from_2025-11-07_16-24-35.pngScreenshot_from_2025-11-07_16-23-58.png
08h34  Warm-up ThomX: Modulator, Laser, Fridge

08h40 Chillers were started, cycling all magnets

09h40 HV is ON but cannot trig because the interlock on low SF6 pressure. Assistance asked.
Entry   Entered by Super Team from 134.158.76.9 on Wed Nov 12 10:29:34 2025;  
15h09 Cycling all magnets

15h12 HV is ON

15h15 The modulator was set to standby
Entry   Entered by Super Team from 134.158.195.141 on Tue Nov 25 09:31:46 2025;  
09h31 Warm-up ThomX: Modulator, Laser, Fridge

09h36 Chillers were started, cycling all magnets.

09h56 Unable to start MRSV and EL cameras. Need help.
Entry   Entered by Super Team from 134.158.195.141 on Fri Dec 5 08:31:45 2025;  
08h31 Warm-up ThomX: Modulator, Laser, Fridge

08h36 Chillers were started, cycling all magnets.

10h07 HV is ON
Entry   Entered by Super Team from 134.158.195.141 on Wed Dec 10 10:45:16 2025;  
8h30 : machine started on remote
50 MeV operation.
Problem with Yag-TL camera
Entry   IC, VM, ND;  Screenshot_from_2026-01-16_18-28-24.pngScreenshot_from_2026-01-16_13-22-12.pngScreenshot_from_2026-01-16_13-23-01.pngScreenshot_from_2026-01-16_13-31-16MODEl.pngScreenshot_from_2026-01-16_16-02-15LOCO_1it.png
08h29 Warm-up ThomX: Modulator, Laser, Fridge
Chillers were started, cycling all magnets.

10h48 Beam is in the ring after resolving a lot of problems. The receipt loaded: recipe_recipe_LI_TL_RI_all_20260115_18_10_34.txt, with Linac-Tl
Entry   VM, ND, VC;  
08h35 Warm-up ThomX: Modulator, Laser, Fridge
08h41 Chillers were started, cycling all magnets.

09h40 HV is ON
Entry   Entered by Super Team from 127.0.0.1 on Fri Feb 6 08:26:22 2026;  Screenshot_from_2026-02-06_10-52-58.png
08h25 Warm-up ThomX: Modulator, Laser, Fridge

08h33 Chillers were started, cycling all magnets.

09h31 HV is on. Vacuum: Li/Vac1 4e-9, Li/Vac2 3e-9, Li/Vac3 3e-9, Li/Vac4 1e-9
Entry   IC, VM;  Screenshot_from_2026-02-20_16-34-18.pngScreenshot_from_2026-02-20_16-15-37.pngScreenshot_from_2026-02-20_12-00-27.png
7h50: mise en chauffe en remote (chillers/frigo, modulateur, cyclage)

08h57 HV is on

09h22 Beam is in the ring W/O RF, recipe_recipe_LI_TL_RI_all_20260219_13_17_17.txt loaded
Entry   IC, VM;  
08h15: mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)

08h15: mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)

09h19 HV is on