KD,VM,IC; 
|
08h00 ThomX was started
Goals: Emittance measurements, ring optics study
10h00 HV was 'ON' |
MV Entered by Super Team from 134.158.195.141 on Fri Jun 6 08:17:16 2025; 
|
08h15 ThomX was started; Modulator, Frig, Laser
08h21 Chillers were started, cycling all magnets
09h40 HV is 'ON' |
VM,IC;   
|
08h40 ThomX was started: Modulator, Frig, Laser
08h45 Chillers were started, cycling all magnets
09h56 HV is 'ON' |
SC, ND;  
|
8h49 allumage modulateur, chiller, laser
10h00 Beam ON
Prise de données Cf images jointes. |
Entered by Super Team from 134.158.195.141 on Wed Jul 2 14:45:07 2025;
|
Vérif position laser photocathode :
--> bouge de 1mm en Y et 0.2 en X
Nouvelle position: |
HG, DN. VM, MJ;
|
11h40 Thomx warm-up
12h35 HV is ON
12h40 HV 1215 V |
Entered by Super Team from 134.158.195.141 on Fri Oct 24 08:33:07 2025;
|
08h32 Warm-up ThomX: Modulator, Laser, Fridge
08h37 Chilers were started, cycling all magnets
09h38 HV is ON |
Entered by Super Team from 134.158.195.141 on Tue Oct 28 08:40:06 2025;   
|
08h40 Warm-up ThomX: Modulator, Laser, Fridge
08h45 Chillers were started, cycling all magnets
09h45 HV is ON |
Entered by Super Team from 134.158.195.141 on Wed Nov 5 12:50:37 2025;  
|
Matin :
Soucis synchro :
- Nicolas les a redémarré |
Entered by Super Team from 134.158.195.141 on Thu Nov 6 08:30:37 2025; 
|
08h30 Warm-up ThomX: Modulator, Laser, Fridge
08h36 Chillers were started, cycling all magnets
09h33 HV is ON |
Entered by Super Team from 134.158.205.4 on Fri Nov 7 18:45:38 2025;  
|
08h34 Warm-up ThomX: Modulator, Laser, Fridge
08h40 Chillers were started, cycling all magnets
09h40 HV is ON but cannot trig because the interlock on low SF6 pressure. Assistance asked. |
Entered by Super Team from 134.158.76.9 on Wed Nov 12 10:29:34 2025;
|
15h09 Cycling all magnets
15h12 HV is ON
15h15 The modulator was set to standby |
Entered by Super Team from 134.158.195.141 on Tue Nov 25 09:31:46 2025;
|
09h31 Warm-up ThomX: Modulator, Laser, Fridge
09h36 Chillers were started, cycling all magnets.
09h56 Unable to start MRSV and EL cameras. Need help. |
Entered by Super Team from 134.158.195.141 on Fri Dec 5 08:31:45 2025;
|
08h31 Warm-up ThomX: Modulator, Laser, Fridge
08h36 Chillers were started, cycling all magnets.
10h07 HV is ON |
Entered by Super Team from 134.158.195.141 on Wed Dec 10 10:45:16 2025;
|
8h30 : machine started on remote
50 MeV operation.
Problem with Yag-TL camera |
IC, VM, ND;    
|
08h29 Warm-up ThomX: Modulator, Laser, Fridge
Chillers were started, cycling all magnets.
10h48 Beam is in the ring after resolving a lot of problems. The receipt loaded: recipe_recipe_LI_TL_RI_all_20260115_18_10_34.txt, with Linac-Tl |
VM, ND, VC;
|
08h35 Warm-up ThomX: Modulator, Laser, Fridge
08h41 Chillers were started, cycling all magnets.
09h40 HV is ON |
Entered by Super Team from 127.0.0.1 on Fri Feb 6 08:26:22 2026;
|
08h25 Warm-up ThomX: Modulator, Laser, Fridge
08h33 Chillers were started, cycling all magnets.
09h31 HV is on. Vacuum: Li/Vac1 4e-9, Li/Vac2 3e-9, Li/Vac3 3e-9, Li/Vac4 1e-9 |
IC, VM;  
|
7h50: mise en chauffe en remote (chillers/frigo, modulateur, cyclage)
08h57 HV is on
09h22 Beam is in the ring W/O RF, recipe_recipe_LI_TL_RI_all_20260219_13_17_17.txt loaded |
IC, VM;
|
08h15: mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)
08h15: mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)
09h19 HV is on |