Entry   VM;  9x
14h31 Start ThomX/ Modulator, Frig, Laser

14h37 Cycling all magnets, Chillers started

15h34 HV is 'On'
Entry   VM, VC, RC, IC;  12x
08h27 Start ThomX: Modulator, Laser, Frig

08h34 Chillers were started, cycling al magnets

12H ready to start beam ( 13H30)
Entry   VM, IC, RC;  Screenshot_from_2025-03-31_18-06-59.pngScreenshot_from_2025-03-31_17-52-04.pngScreenshot_from_2025-03-31_17-14-56.png2025-03-31_10_40_04_li_dg_sst_01-ccd_01_RAW.png
08h00 ThomX started by Maher

09h50 Problem with vacuum in the septum. TL-V3 and EL-V1 are closed.

ThomX configuration changed to 'Linac'.
Entry   VM, IC, DN;  
08h42 Start ThomX: Morulator, firg, laser

08h47 Chillers, cycling all magnets

10h40 HV is 'ON'
Entry   VM, RC, DN, ND;  health_check_Vide_Jauge_2025_04_17_09_25.pnghealth_check_RF_Redpitaya_2025_04_17_09_27.pngbpm_1_vs_kicker_second.pngviewer_2025_04_17_12_44_06.png20250417_175615.jpg
08h15 Start Thomx: modulator, frig, laser

08h21 Chillers started, all magnets cycling

Filesystem very slow
Entry   VM;  
08h22 ThomX was started: modulator, frig, laser

08h28 Chillers was started, all magnets cycling

09h45 HV is 'ON'
Entry   VM, IC, DN ;  
08h20 ThomX was started: Modulator, frig, laser

08h27 Chillers were started, cycling all magnets

10h50 HV is 'ON'
Entry   VM, IC;  9x
Goal: Beam Loss Monitors and Ring injection at high charge. Studies of the injector for high charge. Emittance measurements.


08h33 ThomX was started: modulator,frig, laser
Entry   KD,VM,IC;  EmittanceVsGunPhase.pngScreenshot_from_2025-05-28_11-28-14.png
08h00 ThomX was started

Goals: Emittance measurements, ring optics study

10h00 HV was 'ON'
Entry   MV Entered by Super Team from 134.158.195.141 on Fri Jun 6 08:17:16 2025;  ThomX_PhaseChargeScan20250606.pngThomX_FPC_TableVerticalScan20250606.png
08h15 ThomX was started; Modulator, Frig, Laser

08h21 Chillers were started, cycling all magnets

09h40 HV is 'ON'
Entry   VM,IC;  health_check_Diag_charge_wavecatcher_2025_06_13_10_13.pngScreenshot_from_2025-06-13_11-11-22.pngScreenshot_from_2025-06-13_14-31-57.pngScreenshot_from_2025-06-13_14-31-45.png
08h40 ThomX was started: Modulator, Frig, Laser

08h45 Chillers were started, cycling all magnets

09h56 HV is 'ON'
Entry   SC, ND;  pos_TL2_vs_phase_RF.pngpos_TL2_spX_vs_temp.pngtp2spX_vs_time.png
8h49 allumage modulateur, chiller, laser

10h00 Beam ON

Prise de données Cf images jointes.
Entry   Entered by Super Team from 134.158.195.141 on Wed Jul 2 14:45:07 2025;  
Vérif position laser photocathode :

--> bouge de 1mm en Y et 0.2 en X

Nouvelle position:
Entry   HG, DN. VM, MJ;  mrsv_2_positions_fente.png
11h40 Thomx warm-up

12h35 HV is ON

12h40 HV 1215 V
Entry   Entered by Super Team from 134.158.195.141 on Fri Oct 24 08:33:07 2025;  
08h32 Warm-up ThomX: Modulator, Laser, Fridge

08h37 Chilers were started, cycling all magnets

09h38 HV is ON
Entry   Entered by Super Team from 134.158.195.141 on Tue Oct 28 08:40:06 2025;  Screenshot_from_2025-10-28_11-48-31.pngScreenshot_from_2025-10-28_11-47-12.pngScreenshot_from_2025-10-28_11-46-55.pngScreenshot_from_2025-10-28_15-34-03.png
08h40 Warm-up ThomX: Modulator, Laser, Fridge

08h45 Chillers were started, cycling all magnets

09h45 HV is ON
Entry   Entered by Super Team from 134.158.195.141 on Wed Nov 5 12:50:37 2025;  Screenshot_from_2025-11-05_17-49-33.pngScreenshot_from_2025-11-05_17-51-14.pngScreenshot_from_2025-11-05_17-50-44.png
Matin :

Soucis synchro :
- Nicolas les a redémarré
Entry   Entered by Super Team from 134.158.195.141 on Thu Nov 6 08:30:37 2025;  SectOutput20251030.pngSectOutput20251106.png
08h30  Warm-up ThomX: Modulator, Laser, Fridge

08h36 Chillers were started, cycling all magnets

09h33 HV is ON 
Entry   Entered by Super Team from 134.158.205.4 on Fri Nov 7 18:45:38 2025;  Screenshot_from_2025-11-07_16-24-10.pngScreenshot_from_2025-11-07_16-24-35.pngScreenshot_from_2025-11-07_16-23-58.png
08h34  Warm-up ThomX: Modulator, Laser, Fridge

08h40 Chillers were started, cycling all magnets

09h40 HV is ON but cannot trig because the interlock on low SF6 pressure. Assistance asked.
Entry   Entered by Super Team from 134.158.76.9 on Wed Nov 12 10:29:34 2025;  
15h09 Cycling all magnets

15h12 HV is ON

15h15 The modulator was set to standby