Message ID: 1011     Entry time: Fri Feb 14 08:21:26 2025
 Author: Entered by Super Team from 134.158.195.141 on Fri Feb 14 08:21:09 2025 
 Status: Under Process 
 Type: Shift summary 
 Category: Ring Commissioning 
 Important:
 Subject:  
 Icon:  

08h20 Start ThomX: modulator, laser, fridge,cycling all magnets

08h25 chillers are started

09h50 Controlled access (Rhonic)

09h57 HV is 'On'

10h00 HV is at 1215 V

10h04 RF Gun phase is 136 dg.

10h10 Receipt from 13022025 15;05 loaded

Sect. Phase is 215 dg., Att. 2.48, TL /BPM02 X=0

The yesterday receipt does not provide yesterday storage. The ring was adjusted.

13h20 Vacuum interlock in the ring

13h40 Tthe linac waz reajusted after the interlock. RF Gun phase is 124 dg. Sect. Phase is 215 dg. TL /BPM02 X=3.5 mm

14h21 Scan FPC table. Vert. sigma 120um

Charge: -109; -104; -117 pC

15h00 61.5 MeV. Charges: -110, -107, -113 pC; F=500.04545, 100 kV, Manual phase shifter on 5254, RF phase is 23.5 dg. (the mixer phase shifter for amplitude 3562 )

15h34 Scan FPC table, so-so.

16h15 Scan FPC table 177 um.  Recipt All_202050217_16_22

16h59 70 MeV Sect. Att. 0.244 dB, Phase 238 dg. TL/BPM2 X=-0.5 mm. Linac steerers: H [0.19 -2.85], V [-3.63 3.49]

18h05 Can not store the beam

18h06 Stop ThomX

 

 

 