Entry   Entered by Super Team from 134.158.195.141 on Tue Nov 25 09:31:46 2025;  
09h31 Warm-up ThomX: Modulator, Laser, Fridge

09h36 Chillers were started, cycling all magnets.

09h56 Unable to start MRSV and EL cameras. Need help.
Entry   Entered by Super Team from 134.158.195.141 on Fri Dec 5 08:31:45 2025;  
08h31 Warm-up ThomX: Modulator, Laser, Fridge

08h36 Chillers were started, cycling all magnets.

10h07 HV is ON
Entry   Entered by Super Team from 134.158.195.141 on Wed Dec 10 10:45:16 2025;  
8h30 : machine started on remote
50 MeV operation.
Problem with Yag-TL camera
Entry   IC, VM, ND;  Screenshot_from_2026-01-16_18-28-24.pngScreenshot_from_2026-01-16_13-22-12.pngScreenshot_from_2026-01-16_13-23-01.pngScreenshot_from_2026-01-16_13-31-16MODEl.pngScreenshot_from_2026-01-16_16-02-15LOCO_1it.png
08h29 Warm-up ThomX: Modulator, Laser, Fridge
Chillers were started, cycling all magnets.

10h48 Beam is in the ring after resolving a lot of problems. The receipt loaded: recipe_recipe_LI_TL_RI_all_20260115_18_10_34.txt, with Linac-Tl
Entry   VM, ND, VC;  
08h35 Warm-up ThomX: Modulator, Laser, Fridge
08h41 Chillers were started, cycling all magnets.

09h40 HV is ON
Entry   Entered by Super Team from 127.0.0.1 on Fri Feb 6 08:26:22 2026;  Screenshot_from_2026-02-06_10-52-58.png
08h25 Warm-up ThomX: Modulator, Laser, Fridge

08h33 Chillers were started, cycling all magnets.

09h31 HV is on. Vacuum: Li/Vac1 4e-9, Li/Vac2 3e-9, Li/Vac3 3e-9, Li/Vac4 1e-9
Entry   IC, VM;  Screenshot_from_2026-02-20_16-34-18.pngScreenshot_from_2026-02-20_16-15-37.pngScreenshot_from_2026-02-20_12-00-27.png
7h50: mise en chauffe en remote (chillers/frigo, modulateur, cyclage)

08h57 HV is on

09h22 Beam is in the ring W/O RF, recipe_recipe_LI_TL_RI_all_20260219_13_17_17.txt loaded
Entry   IC, VM;  
08h15: mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)

08h15: mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)

09h19 HV is on
Entry   VM;  
09h00 Warm-up ThomX: Modulator, Laser, Fridge

09h05 Chillers were started, cycling all magnets

10h03 HV is on
Entry   VM, HG, JN;  Screenshot_from_2026-03-06_18-22-28.png
09h00 Warm-up ThomX: Modulator, Laser, Fridge

09h05 Chillers were started, cycling all magnets

10h03 HV is on
Entry   Entered by Super Team from 127.0.0.1 on Fri Mar 13 08:33:09 2026;  
08h32 Warm-up ThomX: Modulator, Laser, Fridge

08h37 Chillers were started, cycling all magnets

09h48 HV is ON
Entry   IC, VM, DN, MJ;  MRSV_Size_vs_LaserPhase.pngHorOrbit_vs_LaserPhase.pngMRSV17h38.pngDispersionAfterLOCO20260326_16h54.png20260326_18h24_TL_Dispersion.png
7h37 : mise en chauffe en remote (frigo/chiller, modulateur, laser, cyclage)

08h57 HV is ON

==> 70 MeV, F=500.031645 MHz
Entry   IC,VM;  
7h50 : mise en chauffe en remote (frigo/chillers, modulateur, laser, cyclage)

08h58 HV is ON

recipe_recipe_LI_TL_RI_all_20260326_09_09_20.txt loaded
Entry   IC,VM;  
8h10 : mise en chauffe en remote (frigo/chillers, modulateur, laser, cyclage)

09h12 HV is ON

recipe_recipe_TL_all_20260408_17_18_54.txt loaded
Entry   IC,VM;  
7h40 : mise en chauffe en remote (frigo/chillers, modulateur, laser, cyclage)

08h43 HV is ON

recipe_recipe_LI_TL_RI_all_20260409_17_07_05.txt loaded
Entry   IC;  
10h30 : mise en chauffe  (frigo/chillers, modulateur, laser, cyclage)

All rondes are broken, THOMX key is turned. What is the reason of this intervention?,  There is nobody around. Jean-Noel came and helped
to solve the problems.
Entry   IC,VM;  
Dalkia solved the problem with vooling circuit in the morning

10h15 mise en chauffe  (frigo/chillers, modulateur, laser, cyclage)

11h16 HV is ON
Entry   IC, VM;  
9h00 : mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)
Entry   Entered by Super Team from 127.0.0.1 on Tue Jun 9 10:13:08 2026;  
10h02 Start-up modulator, laser, fridge, chillers

The SF6 pressure is low. Magnet power supplies filed to start.

11h17 Stop ThomX
Entry   Entered by Super Team from 127.0.0.1 on Tue Jun 16 13:43:02 2026;  
Hello,

I short-circuit the MPS input to modulator, we can trig modulator, the klystron filmant time goes to full time   , need 45 min, you can start at 14:35