Message ID: 1014     Entry time: Wed Feb 19 08:28:11 2025
 Author: Entered by Super Team from 134.158.195.141 on Wed Feb 19 08:27:57 2025 
 Status: Under Process 
 Type: Shift summary 
 Category: Ring Commissioning 
 Important:
 Subject:  
 Icon:  

08h26 Start ThomX: Modulator, Fridge, Laser

08h32 Chillers were started, cycling all magnets

11H changement de la carte synchro... Carte synchro opérationnel

Impossible d'avoir un signal sur l'ICT1 qq soit la phase ==> synchro ??

Vincent est repasse c ok

13h20 Receipt from 202514_14_21_55 loaded (suitable for 50 MeV), injector adjusted, there is a beam in the ring without RF and with RF 50 kV, 36.5 dg. It is necessary to adjust the injection (storage is not too bad, but TL/BPM2 x=+7.5). The injection kicker affects the radio protection system, causing blocking.

13h55 the modulator is in the standby mode, the laser shutter is closed

 

 