Message ID: 965     Entry time: Thu Nov 21 08:27:15 2024
 Author: VM Entered by Super Team from 134.158.195.141 on Thu Nov 21 08:26:43 2024 
 Status: Under Process 
 Type: Info 
 Category: Ring Commissioning 
 Important:
 Subject:  
 Icon:  

08H25 Start ThomX

09H45 HV is 'ON'

09h49 Breakdown in the RF Gun

09h45 Restart HV

Linac steerers H [2. 66 -4.45]; V [-2.00 2.31]

RF Gun Phase is 223 dg. Att. is 0.0, Charge is -84 pC,  Sect. Phase 193 dg., Att. is 2.6 dB TL/BPM02 X 1mm

10h35  Ring Injection

11h00 Change RF to 500.0913

Tune 0.17

11h35 RF Gun Phase is 228 dg. Att. is 0.0, Charge is -50 pC,  Sect. Phase 196 dg., Att. is 2.65 dB TL/BPM02 X 1mm

There was problem with section temperature. Fixed, Phases adjusted.

12h40 RF Gun Phase is 227 dg. Att. is 0.0, Charge is -40 pC,  Sect. Phase 201 dg., Att. is 2.70 dB TL/BPM02 X =0 mm  

 

17h15 STOP THOMX