Message ID: 974     Entry time: Thu Dec 5 08:31:34 2024
 Author: VM Entered by Super Team from 134.158.195.141 on Thu Dec 5 08:31:12 2024 
 Status: Under Process 
 Type: Shift summary 
 Category: Ring Commissioning 
 Important:
 Subject:  
 Icon:  

08h28 Start ThomX

08h40 Some magnets remain switched off. Cycling was not performed

10h20 V is 'ON'

10h55 RF Gun Phase is 165 dg., Sect. Phase is 236 dg., Att. is 0.2 dB. Chargges: -105 pC, -108 pC, -114 pC I TL/DP =255.8 A (70 MeV)

12h40 Ring optic scaled to 70 MeV, there are two turns, start RCDS on injection

12h50 about 2000 turns without steerers and without  RF at the Ring

14h13 Start ring RF

 RF is killing beam at 70 MeV. No phase and energy compatible found. Studies ongoing.

15h57 Return to 50 MeV

16h20 Receipt from 28/11/2024 17h51 There is storage

 

18.05 Stop THOMX.

 

 