  Notes concernant la preparation du Commissionning, Page 2 of 3  Not logged in ThomX    logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Status Type Category Important Subjectdown Icon Text Attachments
  35   Mon Oct 10 10:04:49 2022 VK, IC, VI, JH, NDUnder ProcessShift summaryresumes Summary of the ring commissioning meeting #4 - 300 turns achieved.

- Probably more but limited by
libera cut-off frequency.
  
  33   Mon Oct 3 17:29:53 2022 IC, VK, VI (ND)New SolutionInforesumes Summary of the ring commissioning meeting #3 
Shift summaries for the ring for last
week are at

https://elog.lal.in2p3.fr/THOMX/Commissionning/568

https://elog.lal.in2p3.fr/THOMX/Commissionning/570

  
  29   Mon Sep 26 09:39:15 2022 VK, IC, AM, NDNew SolutionInfoPrise de donnees Summary of the ring commissioning meeting #2 Slides are at https://indico.ijclab.in2p3.fr/event/8750/

- There is a difference in BPM
numbering in Tango and MML => we should
  
  26   Mon Sep 19 15:56:28 2022 IC, VK, VI, VC, JH, HG, NDNew SolutionInfoPrise de donnees Summary of the ring commissioning meeting #1 Status slides presented by Iryna available
on indico at https://indico.ijclab.in2p3.fr/event/8749/

The beam parameters required for
  
  38   Mon Nov 7 23:53:29 2022 VK, IC, VM, JH, NDNew SolutionInforesumes Summary of the ring commissioning meeting Discussed recent orbit correction of
the expanded orbit. 

Need
to make run with  cavity detuning from
  
  39   Mon Dec 5 10:05:11 2022 VK, IC, VM, JH, KD, NDNew SolutionInfoanalyse Summary of the ring commissioning meeting The ring orbit has been re-established
despite some difficulties after the shutdown.

The ring cavity has been started.
  
  42   Mon Jan 9 10:12:40 2023 IC, VK, VM, SC, NDNew SolutionInforesumes Summary of the ring commissioning meeting Notes from last week:


Beam was very unstable
(probably energy instabilities), lot of time
 20_injections.jpg 
  43   Mon Jan 16 09:38:16 2023 VK, VM, SC, ND, HGNew SolutionInforesumes Summary of the ring commissioning meeting Summary of last week:

- On Thursday the beam energy was
very different from usual (magnets current
  
  44   Mon Jan 23 09:54:14 2023 VK,IC, SC, VM, NDNew SolutionInforesumes Summary of the ring commissioning meeting No beam last week. No beam this week.

Machine recovery on 2/2 => Nicolas
may try to tune the machine with students.
  
  47   Mon Feb 20 10:06:36 2023 VM, VK, NDNew SolutionInforesumes Summary of the ring commissioning meeting This week: beam on Thursday.

So far we did not see any screenshot
of Ring variables check.
  
  49   Mon Mar 13 09:39:39 2023 IC, VM, SC, JH, VC, NDNew SolutionShift summaryanalyse Summary of the ring commissioning meeting Excitation (betatron oscillation) on the
beam observed by exciting it with the extraction
kicker => initial measures of the tune.
 data_2023-03-10_15-39-12.pngtbt_x_relative_integer2.pngtune_simulation.pngtune.pngtbt_x_kicker.png 
  50   Mon Mar 20 10:08:24 2023 IC, VK, VM, JH, NDNew SolutionInforesumes Summary of the ring commissioning meeting - Went up to 100kV in the cavity once it
was tuned.

- Achieved nice storage stable
  
  53   Mon May 22 10:05:30 2023 IC, VK, LS, JH, NDNew SolutionShift summaryanalyse Summary of the ring commissioning meeting === Summary of last week:

- Frequency was reduced to 500.0202MHz
but the beam stayed only for 100s of turns
  
  54   Tue May 30 10:12:30 2023 VK, IC, JH, VM, LS, MB, NDNew SolutionInfoanalyse Summary of the ring commissioning meeting Main studies:

- Measure bucket width in phase
on Thursday at 500.02MHz => no storage
  
  Draft   Mon Jun 12 09:51:00 2023 IC, VK, VM, LS, JH, MB, NDNew SolutionInfoPrise de donnees Summary of the ring commissioning meeting Comments:

* There are strong evidences that
part of the frequency problem comes from
  
  57   Mon Jun 19 09:46:32 2023 IC, VK, VM, LS, JH, SC, NDNew SolutionShift summaryresumes Summary of the ring commissioning meeting Report from last week:

- Attempted the strategy suggested
by Alex
  
  59   Mon Jun 26 09:57:52 2023 VK, IC, LS, NDNew SolutionShift summaryresumes Summary of the ring commissioning meeting Discussion mécanique

- Tous les dipoles ont été
alignés par rapport à des surfaces
  
  32   Wed Sep 28 09:56:44 2022 ND, ICReference SolutionInfodocs Steerers and BPM map for the ring See attached files.  BPM_ring.pngBPM_ring.pptx 
  51   Thu Mar 23 12:29:05 2023 NDNew SolutionInforesumes Réunion Physique ThomX Transparents sur: https://indico.ijclab.in2p3.fr/event/9358/

Quelques notes de la réunion
de Physique de ThomX:
  
  27   Mon Sep 19 16:29:06 2022 IC, VK, VI, VC, JH, HG, ND New SolutionShift summaryPrise de donnees Ring objectives This entry is to be updated as the work
progresses.

1) Re-establish beam transport
  