15
|
Wed Mar 3 11:30:46 2021 |
Hayg | Under Process | Info | problemes |
|
RE: WC tests TANGO | |
|
|
|
41
|
Tue Dec 6 00:15:55 2022 |
ND | New Solution | Info | analyse |
|
RE: Summary of the ring commissioning meeting | | Regarding the remote control of the RF
synthetizer: it can only be controlled via
GPIB and RS-232. |
|
|
30
|
Mon Sep 26 10:21:20 2022 |
IC, VK, VI, VC, JH, HG, ND | New Solution | Shift summary | Prise de donnees |
|
RE: Ring objectives | | (1), (2), (4) and (5) from last week
have been done other items in progress.
New to do list: |
|
|
34
|
Wed Oct 5 09:51:12 2022 |
IC, VK, VI, VC, JH, HG, ND | New Solution | Shift summary | Prise de donnees |
|
RE: RE: Ring objectives | | New to do list:
(0) Re-establish beam transport
to ring |
|
|
36
|
Mon Oct 10 10:37:43 2022 |
IC, VK, VI, VC, JH, HG, ND | New Solution | Shift summary | Prise de donnees |
|
RE: RE: RE: Ring objectives | | To do list:
(0) Re-establish beam transport
to ring |
|
|
48
|
Fri Feb 24 10:34:58 2023 |
ND | New Solution | Info | Prise de donnees |
|
RE: Notes from ThomX Physics meeting | | Présent: VK, SC, KD, MJ, HG, ND
Présentation par Marie.
Cf indico https://indico.ijclab.in2p3.fr/event/9242/ |
|
|
58
|
Thu Jun 22 07:41:18 2023 |
KD | New Solution | Info | Prise de donnees |
|
RE: Mise en place Ligne X | | hier et ce matin la ligne a été
re-réglé.
La table optique a été |
|
|
31
|
Tue Sep 27 17:45:54 2022 |
ND | Under Process | Info | docs |
|
RE: Beam requirements for the ring | | An IHM to check some of these parameters
has been created (git/panneaux/StatusInfoIHM_ring_vars.py)
and added to Plateforme_IHM... |
|
|
12
|
Wed Dec 9 14:33:08 2020 |
Hayg | Under Process | Info | etc |
|
RE: | | Pour info :
client 1 ne fonctionne
pas encore. Il n'a pas été |
|
|
40
|
Mon Dec 5 17:42:51 2022 |
CB/HG/SC/KD | Fixed | Info | resumes |
|
Programme linac semaine 5 décembre | | Lundi 5 décembre :
redémarrage technique
Pb refroidissement Pb |
|
|
45
|
Tue Jan 24 10:14:20 2023 |
ND | New Solution | Info | Prise de donnees |
|
Notes from ThomX Physics meeting | | Present: IC, VK, VM, VC, SC, MEK, KD, MJ,
HG, ND, MO (sous réserve d'oublis)
Visio: CB |
|
|
55
|
Fri Jun 9 19:57:14 2023 |
KD | New Solution | Info | Prise de donnees |
|
Mise en place Ligne X | | Aujourd'hui (09/06/2023), la Table1
de la ligne X est mise en position faisceau.
Je l'ai approximativement alignée |
 |
|
13
|
Thu Dec 10 14:43:07 2020 |
Entered by Nicolas Delerue from 193.55.29.171 on Thu Dec 10 14:42:53 2020 | Not Fixed | Problem | problemes |
|
Clients 1, 4 et 5 non fonctionnels | | En complément du message de Hayg,
client 4 et 5 ne fonctionnent pas non plus
(en plus de client 1). |
|
|
28
|
Fri Sep 23 09:44:14 2022 |
IC, VK, AM, VC, ND | Under Process | Info | docs |
|
Beam requirements for the ring | | The following parameters are required for
ring operations:
- At least 50pC on TL/DG/ICT.01 |
|
|
1
|
Tue Nov 19 11:16:39 2019 |
Entered by Hayg Guler from 134.158.195.145 on Tue Nov 19 11:16:25 2019 | Under Process | Shift summary | Prise de donnees |
|
| | Salle de controle :
installer Xlib pour tout
le monde
mettre les environnements |
|
|
Draft
|
Tue Dec 1 14:35:01 2020 |
Entered by Hayg Guler from 134.158.195.145 on Tue Dec 1 14:34:08 2020 | | | |
|
| | Laser :
Camera : mettre le temps d'exposition
à 0.2 secondes |
|
|
9
|
Thu Dec 3 15:17:04 2020 |
Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 15:16:48 2020 | Fixed | Info | Prise de donnees |
|
| | Signaux RF - REdPitaya 03-12-20
Photodiode laser - RP.04 A
QS RP.04 B |
|
|
10
|
Thu Dec 3 15:26:22 2020 |
Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 15:26:07 2020 | Fixed | Info | Prise de donnees |
|
| | signaux photodiode PrC Qs test avec generateur
impulsion ! 2 V , 3 µs (bleu ciel)
et signal avec rampe, 1V (moire), photodiode |
|
|
17
|
Thu Mar 4 16:46:04 2021 |
Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:45:48 2021 | Under Process | Shift summary | Prise de donnees |
|
| | Test du repitaya 1 voie 1 (Pi section)
et 2 (Pr section)
|
 |