HOME Prise de donnees MML Controle commande Simulations Notes Hardware Ligne X Laser Interaction Diagnostiques Synchronisation
Commissionning Commissionning Preparation Pannes ShiftCheck
  Notes concernant la preparation du Commissionning, Page 2 of 3  Not logged in ThomX    logo
Entry   VK, IC, VI, JH, SC, ND; Summary of the ring commissioning meeting #5 
See slides attached to the indico page https://indico.ijclab.in2p3.fr/event/8885/

Pb with BPM => visual check of electrodes + hardware swap

Pb with steerer => Need to identify who will do the intervention and when
Entry   Entered by Nicolas Delerue from 193.55.29.171 on Thu Dec 10 14:42:53 2020; Clients 1, 4 et 5 non fonctionnels 
En complément du message de Hayg, client 4 et 5 ne fonctionnent pas non plus (en plus de client 1).

Nicolas
Entry   IC, VK, VI, VC, JH, HG, ND; Summary of the ring commissioning meeting #1 
Status slides presented by Iryna available on indico at https://indico.ijclab.in2p3.fr/event/8749/

The beam parameters required for a good injection in the ring were discussed.

The following required parameters were identified:
Entry   IC, VK, VI, VC, JH, HG, ND ; Ring objectives 
This entry is to be updated as the work progresses.

1) Re-establish beam transport to ring

2) Scan in time the septum
Entry   VK, IC, AM, ND; Summary of the ring commissioning meeting #2 
Slides are at https://indico.ijclab.in2p3.fr/event/8750/

- There is a difference in BPM numbering in Tango and MML => we should stick to Tango names.

- Beam was very unstable during the past week
    Reply   IC, VK, VI, VC, JH, HG, ND ; RE: Ring objectives 
(1),  (2), (4) and (5) from last week have been done other items in progress.

New to do list:

(0) Re-establish beam transport to ring
Entry   IC, VK, VI (ND); Summary of the ring commissioning meeting #3 

Shift summaries for the ring for last week are at

https://elog.lal.in2p3.fr/THOMX/Commissionning/568

https://elog.lal.in2p3.fr/THOMX/Commissionning/570

https://elog.lal.in2p3.fr/THOMX/Commissionning/571

The
problem with the pulse jumpis with 12ns delays has been identified and fixed (it was related to the synchronisation system).

The main issue identified
    Reply   IC, VK, VI, VC, JH, HG, ND ; RE: RE: Ring objectives 
New to do list:

(0) Re-establish beam transport to ring

(0bis) Check energy jitter in TL/BPM.02 and TL/SST.02
    Reply   IC, VK, VI, VC, JH, HG, ND ; RE: RE: RE: Ring objectives 
To do list:

(0) Re-establish beam transport to ring

(0bis) Check energy jitter in TL/BPM.02 and TL/SST.02
Entry   VK, IC, VM, JH, ND; Summary of the ring commissioning meeting 
Discussed recent orbit correction of the expanded orbit. 

Need to make run with  cavity detuning from its resonant conditions
used in the conditioning. 

 

Discussed measurement of tune, and possible origins of inconsistant/noisy measurements.
 Either BPMs signal processing or  weak excitation. Beam size?

Need to do measurements with scope, to see if we can interpret TbT
Entry   VK, IC, VM, JH, KD, ND; Summary of the ring commissioning meeting 
The ring orbit has been re-established despite some difficulties after the shutdown.

The ring cavity has been started. Whatever the phase it kills the beam.
Two hypothesis:
    Reply   ND; RE: Summary of the ring commissioning meeting 
Regarding the remote control of the RF synthetizer: it can only be controlled via GPIB and RS-232.

=> Phase shift will be done from the synchro synthetiser

=> Power control can be done with a variable attenuator controlled by the synchro synthetiser or a delay generator.
Entry   IC, VK, VM, SC, ND; Summary of the ring commissioning meeting 20_injections.jpg
Notes from last week:


Beam was very unstable (probably energy instabilities), lot of time was spent tuning the injector.
Beam instabilities prevented
us from having a good storage.
Unable to start the extraction line dipole.


Comments:
Entry   VK, VM, SC, ND, HG; Summary of the ring commissioning meeting 
Summary of last week:

- On Thursday the beam energy was very different from usual (magnets current higher 172A for TL; 176A for RI) => made it impossible to re-use
previous settings for the ring and to find new settings.
Entry   VK,IC, SC, VM, ND; Summary of the ring commissioning meeting 
No beam last week. No beam this week.

Machine recovery on 2/2 => Nicolas may try to tune the machine with students.

Data taking on 9/2 for diags and machine characterization.
Entry   ND; Notes from ThomX Physics meeting 
Present: IC, VK, VM, VC, SC, MEK, KD, MJ, HG, ND, MO (sous réserve d'oublis)

Visio: CB

L'ordre du jour et les transparents présentés en réunion sont sur: https://indico.ijclab.in2p3.fr/event/9205/
Entry   ND; Verification variables pour l'anneau ring_vars_2023_02_09_12_15.png
L'IHM de verification des variables pour l'anneau a ete mis a jour.

Il est accessible dans plateforme IHM section "Outils", éeme collone, "eme ligne: "Check vars for RING".

Utilisation de l 'IHM (voir copie d'ecran ci-joint):
Entry   VM, VK, ND; Summary of the ring commissioning meeting 
This week: beam on Thursday.

So far we did not see any screenshot of Ring variables check.

Looking at last week's data, shot to shot charge instability seems to be > 15%
    Reply   ND; RE: Notes from ThomX Physics meeting 
Présent: VK, SC, KD, MJ, HG, ND

Présentation par Marie. Cf indico https://indico.ijclab.in2p3.fr/event/9242/

Demo par Slava.
Entry   IC, VM, SC, JH, VC, ND; Summary of the ring commissioning meeting data_2023-03-10_15-39-12.pngtbt_x_relative_integer2.pngtune_simulation.pngtune.pngtbt_x_kicker.png
Excitation (betatron oscillation) on the beam observed by exciting it with the extraction kicker => initial measures of the tune.

Tune measured close from expected value.

Reason for oscillation damping is not understood.
ELOG V3.1.4-395e101